Slide 1Accelerator Complex Status P. Collier Slide 2 Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major beams…
Slide 1 EMMA Design and Construction Bruno Muratori STFC, Daresbury Laboratory 21/01/09 Slide 2 The EMMA Project EMMA (Electron Machine with Many Applications) is a design…
Considerations on performance of extraction elements ELENA KICKERS AND SEPTA ELENA Meeting, 28.09.2011 Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT 0…
High Intensity Beams Issues in the CERN Proton Synchrotron High Intensity Beams Issues in the CERN Proton Synchrotron S. Aumon EPFL-CERN Aumon Sandra -PhD Defense 1 Contents…
NICA INJECTOR Brief remarks on the status based on recent presentations and publications. The injector scheme Linac LU-20 & fore-injector Basic problems HILac – Booster…
Injection and Extraction Septa,Kickers and Transfer Lines Wolfgang Bartmann CERN (based on lectures by M.J. Barnes, J. Borburgh, B. Goddard, V. Kain and M. Meddahi) Septa,…
High Intensity Beams Issues in the CERN Proton Synchrotron High Intensity Beams Issues in the CERN Proton Synchrotron S. Aumon EPFL-CERN Aumon Sandra -PhD Defense 1 Contents…
Slajd 1 J. Pasternak Muon Acceleration in Non-Scaling FFAG for the Neutrino Factory J. Pasternak, Imperial College London / RAL STFC Work in collaboration and with contributions…