Slide 1LCLS-II Scientific Opportunities Workshops LCLS-II Status David Schultz 9-12 February 2015 Slide 2 LCLS-II Concept Use 1 st km of SLAC linac tunnel for CW SCRF linac…
Slide 1 Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004 Slide 2 N. WalkerEUROTeV Kick-off Meeting1.11.2004 The Global Context…
Slide 1 Plan ahead for the GDE Barry Barish ILC Consultations URA, Washington DC 12-May-05 Slide 2 ILC Consultations - Washington DC2 Starting Point for the GDE Superconducting…
RD’s Report on detector activity Sakue Yamada February 25 @ BNL Report from Physics and Detectors Sakue Yamada LCWS10 @ Beijing March 26, 2010 The activity of the two detector…
Positron Target R&D at KEK Plan and Status AD&I Meeting 2009/8/27 KEK Hybrid Target Test at KEKB Linac Liquid Lead Target Test at ATF Linac Window Test at KEKB Beam…
Vertex Detector R&D for ILC (as seen by the Detector R&D Panel, a Panel of the World-Wide Study Organising Committee) (Jean-Claude Brient, Chris Damerell, Ray Frey,…
A control and systems theory approach to the high gradient cavity detuning compensation R. Paparella, INFN-Milan, LASA Laboratory, Segrate, Italy EPAC 08, Genoa 23-27 June…
Summary of the GDE Tohoku Meeting ILC-GDE Project Managers Akira Yamamoto, Marc Ross, Nick Walker Sendai, March 6, 2008 Outline Objective and Goal of the meeting: Progress:…
SCRF Monthly WebEx Meeting June 2, 2010 ILC-BAW1 Interim Summary and Further Plan Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at…
Status of the ILC Brian Foster (Oxford & GDE) PECFA Meeting CERN 27/11/09 Global Design Effort I could pick many statements. Here are 2: CERN Council Strategy Document:…