Slide 1 Centre de rencontre de Cartigny D. Ferrère, 11 June 2008 On behalf of the University of Geneva Slide 2 3 phases considered: Phase 0: Push the machine to its maximum…
PowerPoint Presentation Abstract: An Energy Recovery LINAC (ERL) based hard x-ray light source is being planned for construction at Cornell. This 5GeV,100mA facility will…
ATLAS Upgrade Centre de rencontre de Cartigny D. Ferrère, 11 June 2008 On behalf of the University of Geneva Possible Machine Scenarios 3 phases considered: Phase 0: Push…
PowerPoint Presentation Abstract: An Energy Recovery LINAC (ERL) based hard x-ray light source is being planned for construction at Cornell. This 5GeV,100mA facility will…
Aucun titre de diapositive 1 Inner detector upgrade / IBL Activities on cooling circuits @ LAPP LAPP team Jacky Ballansat, Patrick Baudin,Pierre-Yves David, Pierre Delebecque,…