Slide 1 The Si Detectors in the CMS Tracker, commissioning, operation, future perspectives Michael Hoch 2. June 2010 Slide 2 CMS Si Detector Commissioning to Operation…
Novosibirsk BINP contribution to ATLAS in 2009 and plans for 2010 LAr calorimeters commissioning and operation O.Beloborodova, V. Bobrovnikov, D. Maximov, A. Maslennikov,…
PHENIX WEEKLY PLANNING 8/5/2010 Don Lynch 2010 Shutdown (Overview) Start Date End Date Design, Engâg, fabrication, procurement and site preparation tasks in support of shutdown…
PowerPoint Presentation A Final Review of the Performance of the CDF Run II Data Acquisition System William Badgett Fermilab for the CDF Collaboration Computing in High Energy…
A. Herlert, CERN PH-SME-IS ISOLDE scientific coordinatorâs report ISCC meeting, November 16, 2009 Running period 2009 Status of experiments New ISOLDE web page ISCC November…
The Si Detectors in the CMS Tracker The Si Detectors in the CMS Tracker, commissioning, operation, future perspectives Michael Hoch 2. June 2010 CMS Si Detector Commissioning…
ST software status Since last software week: 3 ST software meetings 2 dedicated to TED preparations. ST occupancy in MC09 Following the request from Niko the expected occupancy…