ADVANCED POWER ANALYTICS LIMITED Onyx Group - HV installation Test Report Client - Onyx Document Prepared by - Ron Richardson (On behalf of Keysource) Document Date - 02/05/2012…
Page 1 of 35 NO EQUIPMENTS QUANTITY UNIT REMARKS 1 BAY 1 LINE NKT CENTRALE NORD 1.1 HV EQUIPMENT 1 PACKAGE 245kV,10kA,CL:3, Surge arresters equipped with individual discharge…
400 MHz RF System: Power High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS Scope of the presentation High power and SCRF…
T.Eriksson CERN, BE department, 1211 Geneva 28 September 2011 T. Eriksson CERN BE/OP T. Eriksson CERN BE/OP AD consolidation Planning Operation ELENA systems (not covered…