Slide 1Clara Gaspar, April 2012 The LHCb Experiment Control System: Automation concepts & tools Slide 2 Clara Gaspar, April 2012 LHCb Experiment 2 LHCb is one of the…
1. Synthetic Aperture Radar Data Assimilation for Sea Ice Analysis N. G ökhanK asapoğlu Dept . ofElectronics and Communication Engineering İ stanbul Technical University…
Slide 1Status of work of Russian groups in the ATLAS collaboration CERN-Russia Joint Working Group October 2009 A.Zaitsev, IHEP, Protvino Slide 2 Marzio Nessi 5.10.2009 Slide…
Slide 1PHOTOMULTIPLIER HIGH VOLTAGE POWER SUPPLY SYSTEM FOR THE CMS FORWARD HADRON CALORIMETER Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute for…
Slide 1 Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial for adjusting…
Slide 1 First attempt of ECS training Work in progress… A lot of material was borrowed! Thanks! Slide 2 Objectives Get familiar with routine operation. Get familiar with…
Template for Weekly Online Report Change the name and date Switch out all the plots Put in the proper slope in the slide called “Pressure and Temperature in the TRD for…
NCAR Activity Update John Hubbert, Cathy Kessinger, Mike Dixon, Scott Ellis, Greg Meymaris and Frank Pratte To the NEXRAD TAC 12-13 October 2005 San Diego, CA New logo for…
שקופית 1 UM lab activity Status report Dec. 7 Yiftah Silver, Dan Levin December 7, 2010 1 1 Hardware progress We have managed to connect both DRS4 boards to the panel.…
NCAR Activity Update John Hubbert, Cathy Kessinger, Mike Dixon, Scott Ellis, Greg Meymaris and Frank Pratte To the NEXRAD TAC 12-13 October 2005 San Diego, CA New logo for…