DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents BLM 2008 Audit Follow Up

BLM 2008 Audit Follow Up B. Dehning CERN BE/BI B.Dehning System Overview Tunnel: Detector: ionisation chamber + Secondary emission monitor Signal digitalisation and transmission…

Documents 1 HBD Commissioning Itzhak Tserruya DC meeting, BNL, April 11, 2007.

HBD Commissioning Itzhak Tserruya DC meeting, BNL, April 11, 2007 Outline Noise Gain Response to hadrons: FB vs RB Hadron blindness Event size Gas monitoring Diagnostics…

Documents Review of the EC-ASIC

Specifications Asic description Constraints Interface with PDM board Schedule Summary * Specifications: An ASIC is assigned to each MAPMT  36 ASICs have to be distributed…

Documents Stony Brook Update

Stony Brook Update T.K. Hemmick for the Stony Brook Crew If cryos are cold, Why is it smoking? Cryo compressor on loan ONLY unit in the United States. We are 1st âloanerâ…

Documents Specifications Asic description Constraints Interface with PDM board Schedule Summary.

Specifications Asic description Constraints Interface with PDM board Schedule Summary * Specifications: An ASIC is assigned to each MAPMT  36 ASICs have to be distributed…