Slide 1DOE/HEP SciDAC AST Project: “Advanced Computing for 21 st Century Accelerator Science and Technology” Impact of SciDAC on Accelerator Projects Across SC through…
Slide 1 Super B factory plan at KEK Masa Yamauchi KEK Super B Factory Workshop April 20-22, 2005 Honolulu Why, how, what, who, when and how much? Slide 2 Discovery of CPV…
Slide 1 Gas-based tracking for SuperBelle Beam background Upgrade plan Summary Shoji Uno (KEK) April, 20-22, 2005 2 nd Joint Super B factory WS in Hawaii Slide 2 Wire chamber…
Slide 1 US Participation in the International Collaboration at Super KEKB Tom Browder (University of Hawaii) 1. Accelerator: Plan and Track Record 2. Detector : Track record,…
Slide 1 Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl - slac US LHC…
Slide 1 75 Years of Particle Accelerators Andrew M. Sessler Lawrence Berkeley National Laboratory Berkeley, CA 94720 Accelerators started with some theoretical work in the…
ERL RF Systems A. Nassiri November 15, 2006 Presented to the Machine Advisory Committee for the Technical Review of APS Accelerator Upgrade Options – November 15-16, 2006…
ESS Design Options ESS Design Options David McGinnis 4 March 2013 1 Introduction The ESS linac is designed to provide: 5 MW of average beam power 125 MW of peak power A repetition…
Vacuum Electron Device Limitations for High-Power RF Sources Heinz Bohlen, Thomas Grant Microwave Power Products Division CPI, Palo Alto * Vacuum Electron Device Limitations…