DOCUMENT RESOURCES FOR EVERYONE
Documents Rehabilitating and Upgrading Hydro Power Plants a Hydro Power Technology Round-Up Report, Volume 2.....

Rehabilitating and Upgrading Hydropower Plants A Hydropower Technology Round-Up Report, Volume 2 Effective December 6, 2006, this report has been made publicly available…

Documents Air-Operated Valve Evaluation Guide.pdf

Air-Operated Valve Evaluation Guide Effective December 6, 2006, this report has been made publicly available in accordance with Section 734.3(b)(3) and published in accordance…

Documents ICCP

ICCP User Guide TR-107176 Final Draft, December 1996 Prepared by KEMA-ECC 2081 Landing Road Mountain View, CA 94043 Principal Investigators D. Ambrose F. Kendall T. Saxton…

Documents Handbook for v&v of Digital Systems

EPRI • 3412 Hillview Avenue, Palo Alto, California 94304 • PO Box 10412, Palo Alto, California 94303 USA 800.313.3774 • 650.855.2121 • [email protected] • www.epri.com…

Documents TR-107453 Stress Indices for Elbows with Trunnion Attachments Technical

Stress Indices for Elbows with Trunnion Attachments Technical Report L I C E N S E D M A T E R I A L WARNING: Please read the Export Control and License Agreement on the…

Documents Epri - Transmission Line Uprating 345kv to 745kv

Transmission Line Uprating Guide 1000717 Transmission Line Uprating Guide TR-1000717 Technical Progress, November 2000 EPRI Project Manager M. Ostendorp EPRI • 3412 Hillview…

Documents TR-106463

Assessment of FACTS Requirements on the PSE&G System Subsynchronous Resonance Mitigation Options for the Pennsylanvia-New Jersey-Maryland Interconnection TR-106463 Final…

Documents Pump Troubleshooting Vol_1

Pump Troubleshooting Volume 1 M AT E R I A L N SED WARNING: Please read the License Agreement on the back cover before removing the Wrapping Material. LICE Technical Report…

Documents TR-110996

Stress Intensification Factors and Flexibility Factors for Unreinforced Branch Connections Technical Report L I C E N S E D M A T E R I A L WARNING: Please read the Export…

Documents Fireside Testing

Addendum to Guidelines for Fireside Testing TR-111663 Final Report, November 1998 EPRI Project Managers E. Hughes A. Mehta EPRI • 3412 Hillview Avenue, Palo Alto, California…