Fast timing measurements at the focal plane of the Solenogam g-e- spectrometer (and some other ideas…) Greg Lane 15 MV tandem linac post-accelerator (6MV equivalent, campaign…
The DESIR facility at SPIRAL2 An opened collaboration to promote ISOL beams at SPIRAL2 : Result of the SPIRAL2 workshop held at GANIL on July 2005: « Physics with low energy…
Future prospects and needs for nuclear structure studies with high intensity stable beams i) Using stable beams facilities and new generation of detection techniques, the…