Slide 1 Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1 Slide 2 Evaluation of L3 (2.4 x 1 m 2 ) L3 is the second 2.4 x 1 m…
PCB production Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack 1 Evaluation of L3 (2.4 x 1 m2) L3 is the second 2.4 x 1 m2 prototype…