Toby Horstead, Senior Asset Planner Civil & Track, RailCorp delivered the presentation at the RISSB’s 2013 Rail Turnouts Workshop. The RISSB’s National Rail Turnouts…
Slide 1 Michael Herman August 31, 2013 Introduction to FMEA/FMECA http://www.fmea-fmeca.com 1 FMEA and FMECA What is it? A systematic analysis technique which facilitates…
MOC Basic Concepts Uu Iub UE Node-B RL (Radio Link) RNC Iu CN Bi-directional connection between a UE and a Cell. UE can have more than one RL’s RB (Radio Bearer) RAB (Radio…
FOR INTERNAL USE WITHIN IND IAN AUDIT AND ACCOUNTS DEPARTMENT DRAFT FINANCIAL (ATTEST) AUDIT MANUAL _______________________________________________________ ISSUED BY THE…
RAN Signaling Analysis Guide 9 Inter-RAT Handover Procedure 9 About This Chapter Inter-RAT Handover Procedure The inter-RAT handover procedure is performed to hand over a…
presented by: Using Method of Moments in Schedule Risk Analysis Presented at 2012 SCEA/ISPA Joint Annual Conference and Training Workshop, June 26-29, 2012 Raymond P. Covert…
OVERVIEW OF RISK ASSESSMENT Requirements in the Directive Top Tier Sites - Article 9(b) - demonstrating that major- accident hazards have been identified and that the…
Chapter 3 System Analysis Failure Modes, Effects, and Criticality Analysis Marvin Rausand Department of Production and Quality Engineering Norwegian University of Science…