DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents 1 1.8.1.1.3.3.6 Structural and Failure Analysis Cost & Risk Assessment Shahram Sharafat TBM Cost...

Slide 1 1 1.8.1.1.3.3.6 Structural and Failure Analysis Cost & Risk Assessment Shahram Sharafat TBM Cost Estimate Meeting UCLA Dec. 12-13, 2005 Slide 2 2 Lower Level…

Documents 2013-10-161 STAR HFT STAR Collaboration Meeting - LBNL MIT/MIT-Bates Gerrit van Nieuwenhuizen,...

Slide 1 2013-10-161 STAR HFT STAR Collaboration Meeting - LBNL MIT/MIT-Bates Gerrit van Nieuwenhuizen, Stephen Steadman, Jim Kelsey, Ben Buck, Peter Goodwin Jason Besuille,…

Documents 1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.

PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch This Week Continue RPC1 N & S commissioning Complete VTX/FVTX LV, HV, signal, fiber and thermocouple installation and plumbing…

Documents 1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.

PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch This Week Continue RPC1 N & S commissioning Complete VTX/FVTX cabling & fiber installation Pink/White/Blue sheets Continue…

Documents 11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.

PHENIX WEEKLY PLANNING 11/8/12 Don Lynch This Week Complete Repairs & Upgrades for MuTr Stations 2&3 N complete VTX/FVTX Repairs, Survey at Chemistry Continue VTX…

Documents EMCal/DCal Electronics November 08, 2010 Outline: EMCal Installation DCal Preparations Readout...

EMCal/DCal Electronics November 08, 2010 Outline: EMCal Installation DCal Preparations Readout Upgrade - (Presentation by Hans) EMCal & DCal Electronics, T.Awes EMCal…

Documents 12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.

PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch This Week Continue RPC1 N & S commissioning Continue VTX/FVTX cabling & fiber installation Continue VTX/FVTX Commissioning…

Documents EMCal/DCal Electronics November 08, 2010

EMCal/DCal Electronics November 08, 2010 Outline: EMCal Installation DCal Preparations Readout Upgrade - (Presentation by Hans) EMCal & DCal Electronics, T.Awes EMCal…