DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents Longitudinal Bunch Profiling at FACET using Smith Purcell Radiation The cheap and cheerful way of...

Slide 1 Longitudinal Bunch Profiling at FACET using Smith Purcell Radiation The cheap and cheerful way of profiling R. Bartolini, N. Delerue, G. Doucas, S. Hooker, C. Perry,…

Documents 1 June 7, 2006M. Woods, SLAC Collimator design, wakefields (T-480) BPM energy spectrometer.

Slide 1 1 June 7, 2006M. Woods, SLAC http://www-project.slac.stanford.edu/ilc/testfac/ESA/esa.html Collimator design, wakefields (T-480) BPM energy spectrometer (T-474) Synch…

Documents PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.

Slide 1 PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008 Slide 2 PALM-3000 2 Palomar AO instruments PHARO SWIFT P1640 Visitor…

Documents 1 Getting Ready for the Climb HPS Project Overview HPS Collaboration Meeting at SLAC John Jaros...

Slide 1 1 Getting Ready for the Climb HPS Project Overview HPS Collaboration Meeting at SLAC John Jaros September 10, 2012 John Jaros HPS Collaboration Meeting Jefferson…

Documents MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.

MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration Motivations of the experiment + → e+ decay is a forbidden process in the Standard Model…

Documents The Rare K-decay Experiment at BNL and Its Accomplishments

The Rare K-decay Experiment at BNL and Its Accomplishments L. Littenberg 20 Oct 2010 A very interesting target The kaon rare decay program at the BNL AGS was in full swing…

Documents Absolute polarimetry at RHIC

Absolute polarimetry at RHIC Hiromi Okada (BNL) I. Alekseev, A. Bravar, G. Bunce, S. Dhawan, O. Eyser, R. Gill, W. Haeberli, O. Jinnouchi, A. Khodinov, K. Kurita, Z. Li,…

Documents Report from CALICE Beam Test 2 nd DAQ taking period and Plan for 3 rd DAQ period

Report from CALICE Beam Test 2nd DAQ taking period and Plan for 3rd DAQ period S. Uozumi Jul-26 2008 ScECAL meeting CALICE Beam Test 1st period : May SiW-ECAL + AHCAL 2nd…

Documents RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC...

AGS Intensity Scan RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues RHIC Polarized Proton Parameters Parameters…

Documents MICE Target Status

MICE Target Status MICE Target Status P J Smith CM 25 Wed 4th November 2009 MICE MICE Overview Several New Targets have been built and tested. T1, T2 and T2 Mk II. Target…