Cavity String Assembly Procedure for S1-Global Eiji Kako (KEK, Japan) Preparation of cavity string assembly (12-21, January 2010) 2. String assembly of four cavities (22-26,…
Main Linac Design Chris Adolphsen GDE SLAC April 6-7, 2006 MAC Review at FNAL Main Linac Design BCD distilled from Snowmass Working Group recommendations. WG5 for the cavity…
Cavity Work Packages Lutz Lilje GDE Outline Request form PM Progress and finding from KOM, Component/system and the interfaces design parameters, Work packages, Summary of…