DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents The Messenger 145

Studies for a massively-multiplexed spectrograph Spectroscopy of Pluto and Triton VISTA survey of Orion Belt region VLT FLAMES Tarantula Survey The Messenger No. 145 –…

Documents Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Slide 1Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1 Slide 2 Thanks to All Participants 2 Slide 3 Measure Summary Retrofitting insulated…

Documents Bingxin Yang 1/24/2008 Test and Calibration Plan for LCLS-BLM at the APS.

Slide 1 Bingxin Yang 1/24/2008 Test and Calibration Plan for LCLS-BLM at the APS Slide 2 2 Objectives and outline Objective for the BLM test / calibration at the APS 1. Validate…

Documents 1 THEMIS-SCM THM-SCM-CDR – 2004.04.08Bertrand delaPorte THM – SCM – CDR – 08-April-2004 in.....

THEMIS-SCM THM-SCM-CDR â 2004.04.08 Bertrand delaPorte THM â SCM â CDR â 08-April-2004 in Velizy Test and Calibration Plan I&T Plans prior to shipment to UCB EGSE…

Documents Page 1. Page 2 SMOV Status SMOV is proceeding on-track Key programs executed –ERO program...

SMOV Status SMOV is proceeding on-track Key programs executed ERO program Geometric distortion program completed ACS to FGS alignment Image quality ACS Sensitivity HRC Flat…

Documents AQUA Focus on Testing

ADC AQUA Focus on Testing Patricio Merino Software Engineer June 2014 Overview Objective of AQUA Technical aspects Core functionalities How to test AQUA Regression tests…

Documents Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring

Status of 1.5.3 Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives (→ Mar ‘04) 1. Calibration plan (first draft in March ‘03 –…

Documents Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charge 3

Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charge 3 For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist Charges from ALMA Board recvd…