DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents new chap2

Fields in Waveguides – a Guide for Pedestrians Peter Tenenbaum DRAFT June 13, 2003 1 Introduction The heart of a linear collider is the main linear accelerator, which uses…

Documents The Challenges of Ultra-low Emittance Damping Rings David Rubin September 6,2011 IPAC2011 – San...

Slide 1The Challenges of Ultra-low Emittance Damping Rings David Rubin September 6,2011 IPAC2011 – San Sebastian, Spain Slide 2 September 6, 2011IPAC2011, San Sebastian,…

Documents Physics and Detectors at Linear Colliders Jan Strube CERN on behalf of the SiD detector concept.

Slide 1Physics and Detectors at Linear Colliders Jan Strube CERN on behalf of the SiD detector concept Slide 2 Physics Motivation The ILC Accelerator Requirements for Detectors…

Documents Electron cloud tune shift measurements for long trains Tune Shift versus current: Measured the tune....

Slide 1 Electron cloud tune shift measurements for long trains Tune Shift versus current: Measured the tune shift for 45 and 115 bunch positron trains with 14ns bunch spacing…

Documents Beam-ion Instabilities in SPEAR3 Lanfa Wang, SLAC KEK accelerator physics Seminar 2/15/2012 1.

Slide 1 Beam-ion Instabilities in SPEAR3 Lanfa Wang, SLAC KEK accelerator physics Seminar 2/15/2012 1 Slide 2 Outline  Introduction to SPEAR3  Introduction to FII(Fast…

Documents Simulation of Beam-Beam Background at CLIC André Sailer (CERN-PH-LCD, HU Berlin) LCWS2010: BDS+MDI....

Slide 1Simulation of Beam-Beam Background at CLIC André Sailer (CERN-PH-LCD, HU Berlin) LCWS2010: BDS+MDI Joint Session 29 March, 2010, Beijing 1 Slide 2 March 29, 2010…

Documents DIELECTRIC COLLIMATORS FOR BEAM DELIVERY SYSTEMS P. Schoessow, A. Kanareykin Euclid Techlabs S....

Slide 1 DIELECTRIC COLLIMATORS FOR BEAM DELIVERY SYSTEMS P. Schoessow, A. Kanareykin Euclid Techlabs S. Baturin LETI, St. Petersburg J.Resta-Lopez Valencia University R.…

Documents FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.

Slide 1 FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration Slide 2 Glenn Christian - LCABD 12/04/07 2 IP Feedback system - concept Last…

Documents 21 December 2009 ECLOUD Simulations for Measurements of 19-20 December 2009 / J.A.Crittenden 1/1...

Slide 1 21 December 2009 ECLOUD Simulations for Measurements of 19-20 December 2009 / J.A.Crittenden 1/1 ECLOUD Simulations for Measurements of 19/20 December 2009 CTA_2085MEV_20090516,…

Documents PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo...

Slide 1 PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5 hours (13…