DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents Design and Performance of the Upgraded SPS Damper after LS1 G. Kotzian for the Damper Team BE-RF-FB,...

Special e-cloud bunch spacing: ADT compatibility Design and Performance of the Upgraded SPS Damper after LS1 G. Kotzian for the Damper Team BE-RF-FB, 13. February 2015 MSWG…

Documents LHC Transverse feedback

Transverse feedback: high intensity operation, cleaning, lessons for 2012 LHC Transverse feedback W. Höfle, D. Valuch Special thanks to: E. Montesinos, G. Cipolla, F. Killing,…

Documents Operation with ADT increased bandwidth

Transverse feedback: high intensity operation, cleaning, lessons for 2012 Operation with ADT increased bandwidth W. Höfle, G. Kotzian, D. Valuch Special thanks to: G. Cipolla,…

Documents LHC Status Mo Morning 22 -Aug Bernhard Holzer, Jan Uythoven

Slide 1 LHC Status Mo Morning 22-Aug Bernhard Holzer, Jan Uythoven Week 33: 6 Luminosity Runs int luminosity: 143.6 pb -1 maximum lumi 2.4*10 33 major issues: LHC-b polarity…