DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents Mu2e Project Overview Mu2e WGM R. Ray 3/17/2010 13/17/2010 - Mu2e WGM.

Slide 1 Mu2e Project Overview Mu2e WGM R. Ray 3/17/2010 13/17/2010 - Mu2e WGM Slide 2 Mu2e Our primary scientific requirement is to: search for charged lepton flavor violation…

Documents Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.

Slide 1 Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL Slide 2 207/24/2009 Nufact09-IIT Slide 3 307/24/2009 Proposed 8-GeV Implementation…

Documents Upgrading 600L/s IPPS

Upgrading 600L/s IPPS Gustavo Alverio University of Central Florida August 5, 2003 Introduction Ion pump power supplies (IPPS) are located in booster gallery Supply power…

Documents Linac Laser Notcher Project in the Proton Improvement Plan (PIP)

Linac Laser Notcher Projectin the Proton Improvement Plan (PIP) David Johnson, Todd Johnson, John Sobolewski, Fred Mach, Kevin Duel, Andrea Saewert February 11, 2014 Accelerator…

Documents Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.

PowerPoint Presentation Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group Contents Confirm Nova Operations Will Work Operating the…

Documents WG3 Summary, Nufact09, IIT, Chicago, IL, USA (July 20 ~ 25, 2009) WG3 Summary E. Wildner (CERN), T.....

WG3 Summary, Nufact09, IIT, Chicago, IL, USA (July 20 ~ 25, 2009) WG3 Summary E. Wildner (CERN), T. Uesugi (Kyoto University Research Reactor Institute) and D. Li (LBNL)…

Documents Upgrading 600L/s IPPS Gustavo Alverio University of Central Florida August 5, 2003.

Upgrading 600L/s IPPS Gustavo Alverio University of Central Florida August 5, 2003 Introduction Ion pump power supplies (IPPS) are located in booster gallery Supply power…

Documents Mu2e Project Overview

Slide 1 Mu2e Project Overview Mu2e WGM R. Ray 3/17/2010 1 3/17/2010 - Mu2e WGM Mu2e Our primary scientific requirement is to: search for charged lepton flavor violation with…

Documents PIP Update

PIP Update PIP Update May 28th 2014 Agenda Summary Update Current Activities/Updates Ken Domann Update Linac SBK: Working on gallery and working towards CDR (in June) Linac…

Documents Linac Laser Notcher Project in the Proton Improvement Plan (PIP)

Linac Laser Notcher Projectin the Proton Improvement Plan (PIP) David Johnson, Todd Johnson, John Sobolewski, Fred Mach, Kevin Duel, Andrea Saewert February 11, 2013 Accelerator…