Slide 1Sulphur Creek @ Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998 Slide 2 Pre-Project conditions, going from upstream to downstream…
Slide 1Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews 6 weeks to…
STONE KEYS WITH VEGETATION KEY ALL STRUCTURES INTO THE BANK !!!! This includes bank protection, grade control, river training structures, everything!! Cheap insurance!! HERE…
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team Stream stabilization/restoration: Conceptually we will separate the…
LONGITUDINAL PEAKED STONE TOE PROTECTION {LPSTP} & LONGITUDINAL FILL STONE TOE PROTECTION {LFSTP} By Dave Derrick, Potomologist & VP, River Research & Design,…