DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents EPOCH 1000 Series Procedure Phased Array DGS/AVG.

Slide 1 EPOCH 1000 Series Procedure Phased Array DGS/AVG Slide 2 PA DGS/AVG Feature Overview The EPOCH 1000i offers the DGS/AVG sizing feature standard for phased array mode:…

Documents MDT-ASD PRR C. Posch30-Aug-01 1 Radiation Hardness Assurance Total Ionizing Dose (TID) Change of.....

Slide 1 MDT-ASD PRR C. Posch30-Aug-01 1 Radiation Hardness Assurance   Total Ionizing Dose (TID) Change of device (transistor) properties, permanent   Single…

Documents Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week

Run 10 Au-Au Goals Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!…

Documents 11 .12.2009

FGC Software Design Review 11-12-09 -9:00: Test IP transverse adjustment (CMS) and optics verification. Done in parallel: -First commissioning of Synchrotron light monitor…

Documents Muon g-2 and SLAC Detector Test T-519

Muon g-2 Colloquium Muon g-2 and SLAC Detector Test T-519 Momentum Spin e David Hertzog University of Washington wa Subset of g-2 Collaboration* 2/20 University of Washington…

Documents Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) –...

Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) Dec. 1, Begin cooldown to 4.5K Dec. 4, Cooldown to 4.5K complete in both…

Documents MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th.....

MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24th September 2013 Martin Hughes Introduction An ISIS perspective on potential…

Documents Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week

Run 10 Au-Au Goals Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!…

Documents 11 .12.2009

FGC Software Design Review 11-12-09 -9:00: Test IP transverse adjustment (CMS) and optics verification. Done in parallel: -First commissioning of Synchrotron light monitor…

Documents ATLAS Forward Calorimeter Hadronic Test Beam Results

ATLAS Forward Calorimeter Hadronic Test Beam Results J.Armitage, L.Babukhadia, D.Bailey, M.Dixit, M.Donkers, T.Embry, V.Epshteyn, P.Gravelle, J.Hamm, J.Kamnitzer, V.Khovanskii,…