1. Track Substructure Characterization Using 500 MHz and 2 GHz Ground Penetrating Radar: Results from over 250 Miles of Track in Wyoming and Alaska Roger Roberts1 , Imad…
1. XiTRACK® Polyurethane Ballast Reinforcement 2. XiTrack® Reducing maintenance costs XiTRACK® is used to solve a number of track quality issues, eliminating persistent…
A FULL-SCALE LABORATORY INVESTIGATION INTO RAILWAY TRACK SUBSTRUCTURE PERFORMANCE AND BALLAST REINFORCEMENT By Justin Kennedy Submitted for the degree of Doctor of Philosophy…
The Track Laying Methodology being prepared by MMC-Gamuda Joint Ventures company during the construction of Electrified Double Track Project in Malaysia from Ipoh to Padang…