Slide 1 Booster Radiation Damage Facility (RDF) Some History The Radiation Damage Facility originated in the AP4 beam line, used primarily for testing the D0 Vertex Detectors.…
GSECARS Update Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC (bending magnet side station, commissioning)…
Night 27 Main goals for week 33: Luminosity production; First 150 ns bunch train attempts; Roman Pots: check movement at 3.5 TeV, with 1b; Off momentum loss maps for Beam2…
GSECARS Update Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC (bending magnet side station, commissioning)…
Night 27 Week 31 Summary week 31 02.08.-09.08. G. Arduini & O. Brüning 8:30 meeting Operation with Multi-bunch Injection since Thursday 29.07: 13 fills with up-to 120…
GSECARS Update Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC (bending magnet side station, commissioning)…