DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents Vendor List

1 2 3 4 5 ITEM WISE DETAILS OF VENDOR REGISTRATION WITH REGISTRATION NO. AND DATE Scope T&M, Private Limited, 14, Lokmanya Ckt.Breaker, Time Interval and GETCO-001 dtd.…

Documents HVDC Unit-1 ppt

Introduction In recent years, a no. of developments have taken place in the power systems field. The basic function of a transmission system is to transfer electrical power…

Documents Bid Volume -II Sec Vii Ted-151

SPECIFICATIONS Supply of material and Erection, testing and commissioning of new 11 kV lines, New DTs, LT lines for release of BPL beneficiary connections under Rajiv Gandhi…

Documents IS 802 Part-1 Sec-1 DRAFT 12Oct11.pdf

1/24 IS 802 (Part 1/Sec 1): DRAFT Corrected as discussed in Meeting-1 held on 26-27 September at L&T ECC, Chennai Page 1 of 24 Indian Standard USE OF STRUCTURAL STEEL…

Documents Al cable with Steel

KJV ALLOY CONDUCTORS P. LTD. - An ISO 9001:2008 Company Email: [email protected]  +91-7104-237197/236182 Fax:237988 TECHNICAL DATA SHEET • AAAC- ALL ALUMINIUM ALLOY…

Documents 1 Entergy Louisiana, LLC (North) 2010 to 2012 Draft Construction Plan Entergy Transmission Planning....

Slide 11 Entergy Louisiana, LLC (North) 2010 to 2012 Draft Construction Plan Entergy Transmission Planning Summit New Orleans, LA August 11, 2009 Slide 2 2 2010 to 2012 ELL-North…

Documents Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman...

Slide 1 Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT Slide 2 2 Jan. 13, 2012RPG Meeting Project…

Documents Distribution Overhead Splices

Distribution (Overhead): Section 15 (440) 461-5200 ⢠[email protected] ⢠www.preformed.com ⢠EN-CA-1000-3 Section 15 â Distribution (Overhead): Splices Table…

Documents 140113109007_2150908

Introduction Overhead lines Conductor materials Types of line supports Conductor configurations , span and spacing Insulator materials Types of Insulators Electrical energy…

Documents El Campo – Vanderbilt 69 kV Project – Status report

Jan 13, 2012 RPG Meeting El Campo â Vanderbilt 69 kV Project â Status report Ehsan Ur Rehman Planning Engineer ERCOT RPG Meeting * Jan. 13, 2012 RPG Meeting Project Background…