What is a wagon
tippler?
For what purpose
it is used ?
8/8/2019 WT Mukesh Final
3/19
WAGON TIPPLERIt is a deep underground structure which is subjected to direct load from
loaded wagon/loco due to the rake movement over it, in addition to load
due to coal filled hopper and lateral earth pressure. The earth pressure to
be considered here for design shall be due to earth pressure at rest (K0).
For calculation of coal load on moving conveyor, a multiplication factor 1.6
shall be used to take care of inertia force, casual overburden and impact
factor etc.
Thus, coal load per unit length of each moving conveyor
= 1.6*(Cr/Vcb )*(1100/800).
Where, Cr = rated capacity of conveyor system,
Vcb = conveyor belt speed.
Unit weight of coal shall be assumed as 1100 Kg/m3 instead of 800 Kg/
8/8/2019 WT Mukesh Final
4/19
8/8/2019 WT Mukesh Final
5/19
8/8/2019 WT Mukesh Final
6/19
THE WT PACKAGESYSTEM CONSISTS OF
8/8/2019 WT Mukesh Final
7/19
1. Two(02) numbers of WT complex
Two(02)-numbers of Side Arm Charger,
One(01) number WT control room for both WT.
2. Two(02) numbers of Apron Feeder,
Two(02) numbers of dribble conveyor- discharge
to Conv.25A/B
8/8/2019 WT Mukesh Final
8/19
3. Stream (A) WT#01-Apron Feeder-Dribble
conveyor-Conv.25B-Conv26A/B-Conv.27A/B-
Conv.2A/B-Crusher
(B) WT#02-Apron Feeder-Dribble
conveyor-Conv.25A-Conv26A/B-Conv.27A/B-
Conv.2A/B-Crusher4. Conveyor contains two(02) numbers of ILMS
at the discharge point of Conv.25A/B.
5. System contains two (02) numbers ofsuspended magnet at Pent-House-IV of
Conv26A/B.
8/8/2019 WT Mukesh Final
9/19
6. System contains 02 numbers of belt
weigher/scale on Conv.25A/B.
7. 02 numbers of Metal Detector in Conv.26A/B.
8. Conv25A/B (132 KW) is LT power driven.
9. Conv.26A/B (350KW ,6.6 KV) and Conv.27A/B
(220 KW, 6.6 KV) are HT power driven.
10. Except WT operation from local WT control
room , all other control of conveyors and
accessories will be from CHP control room ofStage-I.
8/8/2019 WT Mukesh Final
10/19
SALIENT FEATURES OF WAGON TIPPLER
Wagon Tippler Type : Rota side type for BOXN Wagons
Wagon Tippler Tipping Angle : At least 150 degree.Wagon Tippler Tips/ Hour: 24 Nos. per hour
Side Arm Charger haulage/hrs : 30 Fully loaded Wagons per hour
Rated Capacity of Apron Feeder: 1600 TPH.
Wagon Tippler Hopper Capacity (Volume) : Min. 02 Number 8 wheeled
Wagon.Conveyor Rated Capacity : 1600 TPH, (1760 TPH-Designed)
Conveyor Belt Width : Min. 1400 MM
Conveyor Belt Speed : 3.0 M/Sec.
Tippler Hopper Opening Grid Size : 350MM X 350MM
Side arm Charger:- Hydraulic drivenSide arm charger function: Placement of wagon on tippler table and
removal of empty wagon from the tippler table after tippling.
Wagon tippler:- 04 numbers hydraulic clamp for holding wagon along
with rail table for tippling the wagons.
8/8/2019 WT Mukesh Final
11/19
1170.0S
Plant
Canteen
Crushe
r
House
(Stage-
I)
TRACK
WAGO
N
TIPPLER-I
TP 20
Conv
.25A
Conv.26A
Conv.26B
TRACK
PENT
H
OUSE
TP 21
TP 22
Conv.26A
Conv.26BConv.27A
Conv
.27
B
2905.25E
1462.0S
2905.25
E
3014.2E
1060.05S
Co
nv
.1
B
Co
nv
.1
A
Conv.2A
Conv.2B
TP 1Conv.3A
Conv.3B
Conv
.7
TP 2
TP 4
Conv 4A
Conv.4B
Wagon
Tippler
Control
Room
TPs for Wagon Tippler
TPs for Stage-I Conv.
Galleries.
Conv. Gallery for wagonTippler
LEGEND:-
Conv. Gallery of Stage-I
System Inside tunnel
OverbridgeNegat
ive
Line
(propos
ed)
Negative
Line
(Existing)
ToTrack
hopp
er
I
ToT
rackhoppe
rII
Stablin
gLine.
Conv
.25B
WAGON
TIPPLE
R-II
Temp.L
ine
Negative Line restored
on 30.04.10, Loco trial
done
8/8/2019 WT Mukesh Final
12/19
P/P
House
Pent
House
TR-8 TR-1TR-9 TR-3 TR-2TR-4TR-5TR-6TR-7 TP 21
TP 22
TR-4
TR-3
TR-2
TR-1
TP 20
WT # 2
ROB
PILE CAP & PEDESTALS Schematic Drg.
TUNNEL
RailTra
ck
Pile Cap Done
Pedestal Done
Conv.2
6A/B
Conv.2
7A/B
Conv. 25A/B
WAGON TIPPLER: TPs, TRESTLES, PILES
8/8/2019 WT Mukesh Final
13/19
OPERATION PHILOSOPHY
8/8/2019 WT Mukesh Final
14/19
Step1-Loco should have to brought
fully loaded 58 numbers wagons (BoxN type), nearer to rail table i.e. with in
the reach of Side Arm Charger
(SAC).
Step2- Engine have to removed
through loop line, by- passing railtable (consisting load cells for
weighing).
8/8/2019 WT Mukesh Final
15/19
Step3- Side arm charger arm will
automatically (hydraulic operated) clamp
with wagon rakes, and will drag full racknearer to rail table. Long travel of SAC took
by Hydraulic driven rack-pinion system.
Step4- One number wagon will be manually
de-clamped from rake and side arm charger
will slowly placed the loaded rake on-to therail table and the 04 i.e. two pair photo cell
will verify the perfect positioning of wagon
on the rail table.
8/8/2019 WT Mukesh Final
16/19
Step5-As soon as photo cell permits, the four number
hydraulic operated clamps , moves down and hold the
entire wagon along with rail table from bottom, in meantime side arm charger de-clamped from the wagon.
Step6- The wagon tippler drive start the tippling
operation and on the end-arm by side type tippling
system, whole rail table along with loaded wagon tilting
started. As soon as the tippling angle reaches up-to
110 degree, after getting clearance with rail table, the
horizontal arm of side arm charger lifted up (i.e. 90 O).The side arm charger will start to move back towards
rack, and the tippler will continue the tippling activity for
up-to 150 degree.
8/8/2019 WT Mukesh Final
17/19
Step7- The tippler will complete the tippling of wagon
i.e. unloading of coal into WT hopper (Capacity -02
fully loaded wagon), in the same time frame the side
arm charger , reaches nearer to the loaded wagon
rakes.
Step8- Side arm charger again started the same
sequences of Step1 to step-7, by holding the entirerakes, dragging nearer to rail table, manual de-
clamping of one wagon and then placing of wagon
up-on rail table. In the same time frame the rail table
will return back to its original position , clamps will beremoved from empty wagon.
8/8/2019 WT Mukesh Final
18/19
Step9- While placing loaded wagon from IN-
HAUL track on to rail table, the side arm charger
(SAC) slowly push empty wagon ahead in OUT-
HAUL track, and at last SAC, will imparts a quit
higher force on empty rack , in order to moving
farther from rail table or automatically clampingwith any existing wagon.
Step10- From the hopper ,through apron feeder,
coal cutting will took place and by conveyingsystem , coal will be feed in to crusher house.
8/8/2019 WT Mukesh Final
19/19
THANK YOU