WPM ad-hoc group report TP#17 closing
Group Name: WPM (TP adhoc)Source: convener WPM Roland Hechwartner, [email protected] Date: 2015-05-22Agenda Item: TP#17, Item: 11
TP-2015-0697-WPM_status_report_at_TP17_closing
Target Timeline for Release 2
2
TP15Jan 2015
TP17 TP18July 2015
TP20Nov 2015
TP23May 2016
R1 Publication and ratification
TP15.1
R2 feature WIs
R2 work program
Marcom provides
market view
Initial version of Release
description - check list for
release finalization
Target date for Stage 1 freeze R2
Essential Corrections - MNT
Small Technical Enhancements - STE (R2)
Target date for Stage 2 freeze R2
Target date for Stage 3 freeze R2
Source: TP-2015-0578R03-Release_2_planning_considerations
Feature Work Item View“Release 2 candidates”
© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening
Prim. WG Work Item Name related TS / TR
Start / RE-APPROVAL Target Date % compl
WG5, WG1, WG2, WG3,
WG4WI 0025 Generic Interworking with Area Networks
CRs to TR-0007 TS-0001 TS-
0003
TP#15 TP#21 20%
WG1, WG2, WG3, WG5 WI-0026 Efficient Communications
CRs to TR-0001 TS-0002 TS-0001 TS-
0004 TS8,9,10 TS-
05,06
TP#15 TP#21 5%
WG2, WG1 WI-0024 LWM2M Interworking TS-0014 TP#16 TP#23 40%WG2 WI-0011 Service Component Architecture TS-0007 TP#9 TP#17 100%WG4 WI-0021 Secure Environment Abstraction TS-0016 TP#14 TP#20 10%
WG5 WI-0005 Abstraction & Semantics Capability Enablement
TR-0007 TS-0002 TS-0001 TS-0004 TS-0011 TS-
0012
TP#16 TP#23 15%
WG1, WG2, WG3, WG4 WI-0029 App-ID Clarification
CRs to TS-0001, TS-0002, TS-0003, TS-0004, TS-0011
TP#16 TP#18 25%
WG1, WG2, WG4, WG5 WI-0030 M2M Application & Field Domain Component Configuration CRs to TS-
0002 TP#16 TP#18 5%
WG1, WG2, WG3, WG4 WI-0031 Optimized Group-based Operation
CRs to TS-0001, TS-0002, TS-0004, TR-0001, TR-00012
TP#16 TP#19 TP#20 TP#21
10%
Work Item Status
© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening
Prim. WG Work Item Name related TS / TR
Start / Re-Approval
Target Date
% compl
WG1 WI-0015 oneM2M Use Case Continuation TR-0001 n.a. n.a. n.a.WG1 WI-0028 Industrial Domain Enablement TR-0018 TP#15 TP#18 45%
WG1, WG5 WI-0017 Home Domain Enablement TR-0013 TR-0017 TP#13 TP#21 50%
WG2 WI-0018 oneM2M and AllJoyn Interworking TR-0014 TP#14 TP#18 70%WG3 WI-0020 Service Layer API Core Principles TR-0015 TP#14 TP#19 5%
WG4 WI-0016 End-to-End Security and Group Authentication
TR-0012 TP#11 TP#20 40%
WG4 WI-0019 Dynamic Authorization for IoT TR-0019 TP#14 TP#18 5%
WG4 WI-0023Study of Authorization Architecture for Supporting Heterogeneous Access Control Policies
TR-0016 TP#14 TP#20 35%
WG6 WI-0022 Interoperability Testing TS-0013 TP#14 TP#25 80%
WG6 WI-0027 Testing Framework TS-0015 TP#15 TP#22 30%
WG6 WI-0032 Conformance TestTS-0017, TS-0018, TS-0019
TP#16 TP#26 5%
Items for INFORMATIONRelease-1 Deliverables in Maintenance
WG ID Name Rel 1Version
latestVersion
WG1 TS-0002 Requirements V1.0.1
WG1 TS-0011 Common Terminology V1.2.1 V1.3.0
WG2 TS-0001 Functional Architecture V1.6.1 V1.8.0
WG3 TS-0004 Service Layer Core Protocol V1.0.1 V1.1.0
WG3 TS-0008 CoAP Protocol Binding V1.0.1
WG3 TS-0009 HTTP Protocol Binding V1.0.1
WG3 TS-0010 MQTT Protocol Binding V1.0.1 V1.1.0
WG4 TS-0003 Security solutions V1.0.1 V1.1.0
WG5 TS-0005 Management enablement (OMA) V1.0.1 V1.1.0
WG5 TS-0006 Management enablement (BBF) V1.0.1 V1.1.0
© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening
Items for INFORMATIONRelease-2 Deliverables
WG ID Name latestVersion Start Change
ControlRel.2
FreezeRel. 2
Approval
WG1 TS-0002 Requirements V2.0.0 n.a. TP18 TP25?WG1 TS-0011 Common Terminology V2.0.0 n.a. TP23 TP25?WG2 TS-0001 Functional Architecture V2.1.0 n.a. TP20 TP25?WG2 TS-0007 Service Components V0.8.0 TP9 TP15 TP15 TP17WG2 TS-0014 LWM2M Interworking V0.2.0 TP16 TP21 TP21 TP23WG3 TS-0004 Service Layer Core Protocol V1.1.0 TP17 TP23 TP25?WG3 TS-0008 CoAP Protocol Binding V1.0.1 TP23 TP25?WG3 TS-0009 HTTP Protocol Binding V1.0.1 TP23 TP25?WG3 TS-0010 MQTT Protocol Binding V1.1.0 TP17 TP23 TP25?WG4 TS-0003 Security solutions V1.0.1 TP23 TP25?
WG4 TS-0016 Secure Environment Abstraction V0.0.1 TP16 TP18 TP19 TP20
WG5 TS-0005 Management enablement (OMA) V1.1.0 TP23 TP25?
WG5 TS-0006 Management enablement (BBF) V1.1.0 TP23 TP25?
WG5 TS-0012 Base Ontology V0.2.0 TP15 TP18 TP19 TP20
© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening
Items for INFORMATIONTesting Deliverables
WG ID Name latestVersion Start Change
Control Freeze Approval
WG6 TS-0013 Interoperability Testing V0.0.4 TP15 TP18 TP21 TP22
WG6 TS-0015 Testing Framework V0.2.0 TP16 TP18 TP21 TP22
WG6 TS-0017 Implementation Conformance Statements V0.0.1 TP17 TP21 TP22 TP26
WG6 TS-0018 Test Suite Structure and Test Purposes V0.0.1 TP17 TP21 TP24 TP26
WG6 TS-0019Abstract Test Suite & implementation eXtra Information for Test
V0.0.1 TP19 TP23 TP24 TP26
© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening
Items for INFORMATIONTechnical Reports in development
© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening
WG ID Name LatestVersion Freeze Approval
WG1 TR-0001 Use Cases Collection V1.6.0 n.a. n.a.
WG1 TR-0005 Roles and Focus Areas V0.0.4 n.a. n.a.
WG1 TR-0013 Home Domain Enablement V0.2.1 TP17 TP18
WG1 TR-0018 Industrial Domain Enablement V0.1.1 TP17 TP18
WG2 TR-0014 oneM2M and AllJoyn Interworking V0.0.0 TP17 TP18WG3 TR-0015 Service Layer API Core Principles V0.1.0 TP18 TP19
WG3 TR-00yy Language Bindings for specific target programming languages V0.0.0 TP18 TP19
WG4 TR-0012 End-to-End-Security_and_Group_Authentication V0.3.0 TP18 TP20
WG4 TR-0016 Authorization Architecture and Access Control Policy V0.1.1 TP19 TP20
WG4 TR-0019 Dynamic Authorization V0.0.1 TP18 TP20
WG5 TR-0007 Study on Abstraction and Semantics Enablement V2.5.0 TP17 TP18
WG5 TR-0017 Home Domain Abstract Information Model V0.3.0 TP20 TP21
Next Steps• Update of report post TP#17
– latest versions of TSs and TRs– WIs agreed during TP17
• Work program status information on member portal – Work in progress
• Prepare Release 2 description for TP#18 finalization– Goal: high level technical description of Rel. 2– Input / review comments invited
• See initial draft skeleton in TP-2015-0688 Release-2 control document
– WPM 17.1 targeted to progress Release 2 description – Final drafting and agreement during TP#18
© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening
Next Meetings / Calls• Conference Call– WPM 17.1: July 1 @ 14:00 -15:00 (GMT)
• Face-to-Face– WPM#18.0: July 20-24, ad-hoc as required
© 2015 oneM2M PartnersTP-2015-0689R01-WPM_status_report_at_TP17_opening