INTRODUCTIONINTRODUCTION
I N T R O D U C T I O N
Dear Sir
It is our pleasure to introduce ourselves as leading manufacturers of ELECTRICAL SWITCH GEAR and associated equipment in SAUDI ARABIA Established in 1975 MUSAID SWITCH GEAR FAC Co LTD in a span of 34 years has expanded its area and scope of activities promoting development of Electrical Technology in the Kingdom importance of which can not be emphasized With the commissioning of newly acquired machinery and technical know-how it is now geared much better to manufacture Electrical Distribution Panels Distribution Boards Motor Control CentersPower Factor improvements panels Outdoor type Package Substations Cable Distribution Pillars and Instrumentation Control panel for special applications Through continued endeavor to achieve the best MUSAID SWITCH GEAR FACCoLTD has now introduced a completely new generation of Electrical Switch Gear and Panels which are sensibly coordinated in design and performance Plans are also underway to expand its activities to the manufacture of High Voltage Switchgear in near future Our products offer convincing advantages of long service life and optimum efficiency with a wide margin of protection against over loading Maximum safety is built-in by strict quality control and adherence to National and International safety regulations Our products conform to BS IEC-439 and Enclosures are built in conformity with NEMA-1NEMA-4NEMA-5 NEMA-9 and NEMA-3R Rigorous factory testes are conducted before the equipment leaves the factory indeed acquisition of advanced technology and skill in the field of Electrical Engineering is a ldquoMUSTrdquo for standing shoulder to shoulder with the advanced countries of the world Your Faithfully
for MUSAID SWITCH GEAR FACTORY
IHSAN SALEH AL KHATEEB (Managing Director)
ΪϴδϟΔϳΎϨϋ
ϪΗΎϛήΑϭ ΔϤΣέϭϢϜϴϠϋϡϼδϟͿ
ΎϬϟΔΒΣΎμ Ϥϟ ΕΪόϤϟϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟϦϳΪέϦϴόϨμ ϤϛΎϨδϔϧϢϜϟϡΪϘϧϥ Ύϧέϭήγ ϲ ϋϭΩϦϤϟϪϧ
ΔϳΩϮόδϟΔϴΑήόϟΔϜϠϤϤϟϲ ϓ
)ϡΎϋΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟΪϋΎδϣϊ Ϩμ ϣβ γ ΄Η1975ϢΗΓήΒΨϟ Ϧϣ˱ΎϣΎϋϥϮΛϼΛϭϊ Αέ ϯ ΪϣϰϠϋϭϡ (
ΕϻϷϡΪΨΘγ ΈΑϭ ΔϜϠϤϤϟϲ ϓΔϴΎΑήϬϜϟΎϴΟϮϟϮϨϜΘϟέϮτΗΐ ϛϮϴϟϊ Ϩμ ϤϟΕΎσΎθϧϝΎΠϣήϳϮτΗϭϊ ϴγ ϮΗ
ΔϴΟέΎΨϟΔϴϋήϔϟΕΎτΤϤϟϭΕΎϛήΤϤϟΎΑϢϜΤΘϟΰϛήϣϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϟϊ ϴϨμ ΗϥΎϜϣϻΎΑ Βλ ΔΜϳΪΤϟ
ϲ ϟΎόϟςϐπ ϟ ϴΗΎϔϣΕΎΣϮϟϭΔλ ΎΨϟΕΎϣΪΨΘγ ϼϟϢϜΤΘϟΕΎΣϮϟϚϟάϛΕϼΑΎϜϟ ϊ ϳίϮΗΕΎΣϮϟϭ
ΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎτΤϣΕΎΠΘϨϣϢϳΪϘΗϦϣΪϋΎδϣϊ Ϩμ ϣϦϜϤΗϞπ ϓϷ ϖϴϘΤΘϟϞλ ϮΘϤϟϲ όδϟϝϼΧϦϣϭ
Γ˯ ΎϔϜϟϭϢϴϤμ ΘϟΚϴΣϦϣϖγ ΎϨΘϣϞϜθΑϢϜΤΘϟ ΰϛήϣϭ
έΎΒΘϋϻϦϴόΑάΧϷϊ ϣΕΎΠΘϨϤϠϟΔϴϟΎόϟ Γ˯ ΎϔϜϟϭϞϤόϟΓήΘϓϝϮσΚϴΣϦϣΓήϴΒϛΪ ϮϓϦϣΆΗϊ Ϩμ ϤϟΕΎΠΘϨϣϥ
ΪΰϟϞϴϤΤΘϟήσΎΨϣϦϣΕΎΣϮϠϟ ϩάϫΔϳΎϤΣ
ΕΎΠΘϨϤϟΔϘΑΎτϣϝϼΧϦϣΔϴϋϮϨϠϟϖϴϗΪϟ ςΒπ ϟϝϼΧϦϣΎϬϨϣϖϘΤΘϟ ϢΘϳΕΎΠΘϨϤϠϟΔϣϼδϟ ήϴϳΎόϣϥ
)ΔϴϟϭΪϟϭΔϳΩϮόδϟΕΎϔλ ϮϤϟϊ ϣϖΑΎτΘΗΎϨΗΎΠΘϨϣϥ ΚϴΣ ΔϴϟϭΪϟϭΔϴϨσϮϟήϴϳΎόϤϟϭΕΎϔλ ϮϤϠϟIES (
ΕΎΠΘϨϤϟϩάϬϟϞϴϐθΘϟΓ˯ ΎϔϛϦϤπ ϳΎϬϤϴϠδΗϞΒϗϭϊ Ϩμ Ϥϟ ϞΧΩΕΎΠΘϨϤϠϟϖϴϗΪϟκ Τϔϟϥϭ
ΎϨΗΎΠΘϨϣϦϣϥϮΟΎΘΤΗΎϤΑϢϜΘϣΪΨϟϥϭΰϫΎΟϦΤϧϭϞπ ϓϷ ϢϳΪϘΗϮϫ˱ΎϤ ΩΎϨϓάϫϥ
ϡήΘΣϻϖΎϓϝϮΒϘΑϮϠπ ϔΗϭ
ϡΎόϟήϳΪϤϟ
ΐ ϴτΨϟϢγ Ύϗ ϟΎλ ϥΎδΣ
MUSAID SWITCH GEAR FACTORY COMPANY LTD- RIYADH ORGANIZATION CHART
Document Number QM ISO 9001 2000 ORGANIZATION CHART CLAUSE 421 E-FILE Path MUSAID _ ORGANIZATION _ CHART PAGE 1 of 1
GENERAL MANAGER
ADMINISTRATION MANAGER
ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR
SECRETARY ndashCUM- DISPATCH CLERK
QUALITY CONTROL INSPECTOR
AUTO CAD DESIGNER
MANAGEMENT REPRESENTATIVE (MR
MANAGEMENT REPRESENTATIVE (MR) amp QUALITY COORDINATOR (QC)
FACTORY MANAGER
GENERAL MANAGER GENERAL MANAGER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
ELECTRICAL SUPERVISOR
FACTORY MANAGER HR amp ACCOUNTS
FOREMAN- CUM - MECHANICAL SUPERVISOR
QUALITY CONTROL INSPECTOR
ELECTRICAL SUPERVISOR
ACCOUNTS CLERK ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR
ACCOUNTS CLERK
HR amp ACCOUNTS
HR amp ACCOUNTS
COMMERCIAL CERTIFICATES COMMERCIAL CERTIFICATES AND LICENSESAND LICENSES
CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE
PLANTS AND MACHINERIESPLANTS AND MACHINERIES
SURFACE TREATMENT PLANT
MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant
Stages of our Surface Treatment are summarized as below
1 Pretreatment Degreasing and Cleaning of Sheet Surface is
treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade
2 Powder Coating After degreasing the treated surface goes to
Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun
3 Furnace Baking Coated enclosures or sheet surfaces pass inside
Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period
4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions
MAJOR MACHINES COMMISSIONED IN MUSAID
A SHEET METAL FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication
Machine 1 FINN Power-
Finland 2 CNC(Programmable) Hydraulic Sheet Bending
Machine (500 KN) 1 Darley-Italy
3 Hydraulic High Press Bending Machines (3 meter length)
3 OMAG Germany
4 Hydraulic High Press Shearing Machines (3 meter length)
2 OMAG Germany
5 Pneumatic Sheet Notching Machines 2 -----
6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany
7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany
8 CO2 Gas Welding Machines 2 ----
9 Electric Arc Welding Machines 15 ----
10 Portable Arc Electric Welding Machines (for site jobs)
3
KEMPPI Germany
11 Electric Spot Welding Machine 1 FIFES Italy
12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea
13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN
SNo MACHINE DESCRIPTION QTY MAKE
1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)
1 SUNRISE ndashKorea
2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea
3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)
1 EUROMACKorea
4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany
5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany
6 Vertical Drilling amp Milling Machine (Upto 40 mm)
2 China
7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly
B BUS BAR FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)
1 Intech OverseasIndia
2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface
1 Intech OverseasIndia
3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)
1 Italy
4 Polyester Powder Thickness Tester 1 ----
C SURFACE TREATMENT amp POWDER PAINT COATING PLANT
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
INTRODUCTIONINTRODUCTION
I N T R O D U C T I O N
Dear Sir
It is our pleasure to introduce ourselves as leading manufacturers of ELECTRICAL SWITCH GEAR and associated equipment in SAUDI ARABIA Established in 1975 MUSAID SWITCH GEAR FAC Co LTD in a span of 34 years has expanded its area and scope of activities promoting development of Electrical Technology in the Kingdom importance of which can not be emphasized With the commissioning of newly acquired machinery and technical know-how it is now geared much better to manufacture Electrical Distribution Panels Distribution Boards Motor Control CentersPower Factor improvements panels Outdoor type Package Substations Cable Distribution Pillars and Instrumentation Control panel for special applications Through continued endeavor to achieve the best MUSAID SWITCH GEAR FACCoLTD has now introduced a completely new generation of Electrical Switch Gear and Panels which are sensibly coordinated in design and performance Plans are also underway to expand its activities to the manufacture of High Voltage Switchgear in near future Our products offer convincing advantages of long service life and optimum efficiency with a wide margin of protection against over loading Maximum safety is built-in by strict quality control and adherence to National and International safety regulations Our products conform to BS IEC-439 and Enclosures are built in conformity with NEMA-1NEMA-4NEMA-5 NEMA-9 and NEMA-3R Rigorous factory testes are conducted before the equipment leaves the factory indeed acquisition of advanced technology and skill in the field of Electrical Engineering is a ldquoMUSTrdquo for standing shoulder to shoulder with the advanced countries of the world Your Faithfully
for MUSAID SWITCH GEAR FACTORY
IHSAN SALEH AL KHATEEB (Managing Director)
ΪϴδϟΔϳΎϨϋ
ϪΗΎϛήΑϭ ΔϤΣέϭϢϜϴϠϋϡϼδϟͿ
ΎϬϟΔΒΣΎμ Ϥϟ ΕΪόϤϟϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟϦϳΪέϦϴόϨμ ϤϛΎϨδϔϧϢϜϟϡΪϘϧϥ Ύϧέϭήγ ϲ ϋϭΩϦϤϟϪϧ
ΔϳΩϮόδϟΔϴΑήόϟΔϜϠϤϤϟϲ ϓ
)ϡΎϋΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟΪϋΎδϣϊ Ϩμ ϣβ γ ΄Η1975ϢΗΓήΒΨϟ Ϧϣ˱ΎϣΎϋϥϮΛϼΛϭϊ Αέ ϯ ΪϣϰϠϋϭϡ (
ΕϻϷϡΪΨΘγ ΈΑϭ ΔϜϠϤϤϟϲ ϓΔϴΎΑήϬϜϟΎϴΟϮϟϮϨϜΘϟέϮτΗΐ ϛϮϴϟϊ Ϩμ ϤϟΕΎσΎθϧϝΎΠϣήϳϮτΗϭϊ ϴγ ϮΗ
ΔϴΟέΎΨϟΔϴϋήϔϟΕΎτΤϤϟϭΕΎϛήΤϤϟΎΑϢϜΤΘϟΰϛήϣϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϟϊ ϴϨμ ΗϥΎϜϣϻΎΑ Βλ ΔΜϳΪΤϟ
ϲ ϟΎόϟςϐπ ϟ ϴΗΎϔϣΕΎΣϮϟϭΔλ ΎΨϟΕΎϣΪΨΘγ ϼϟϢϜΤΘϟΕΎΣϮϟϚϟάϛΕϼΑΎϜϟ ϊ ϳίϮΗΕΎΣϮϟϭ
ΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎτΤϣΕΎΠΘϨϣϢϳΪϘΗϦϣΪϋΎδϣϊ Ϩμ ϣϦϜϤΗϞπ ϓϷ ϖϴϘΤΘϟϞλ ϮΘϤϟϲ όδϟϝϼΧϦϣϭ
Γ˯ ΎϔϜϟϭϢϴϤμ ΘϟΚϴΣϦϣϖγ ΎϨΘϣϞϜθΑϢϜΤΘϟ ΰϛήϣϭ
έΎΒΘϋϻϦϴόΑάΧϷϊ ϣΕΎΠΘϨϤϠϟΔϴϟΎόϟ Γ˯ ΎϔϜϟϭϞϤόϟΓήΘϓϝϮσΚϴΣϦϣΓήϴΒϛΪ ϮϓϦϣΆΗϊ Ϩμ ϤϟΕΎΠΘϨϣϥ
ΪΰϟϞϴϤΤΘϟήσΎΨϣϦϣΕΎΣϮϠϟ ϩάϫΔϳΎϤΣ
ΕΎΠΘϨϤϟΔϘΑΎτϣϝϼΧϦϣΔϴϋϮϨϠϟϖϴϗΪϟ ςΒπ ϟϝϼΧϦϣΎϬϨϣϖϘΤΘϟ ϢΘϳΕΎΠΘϨϤϠϟΔϣϼδϟ ήϴϳΎόϣϥ
)ΔϴϟϭΪϟϭΔϳΩϮόδϟΕΎϔλ ϮϤϟϊ ϣϖΑΎτΘΗΎϨΗΎΠΘϨϣϥ ΚϴΣ ΔϴϟϭΪϟϭΔϴϨσϮϟήϴϳΎόϤϟϭΕΎϔλ ϮϤϠϟIES (
ΕΎΠΘϨϤϟϩάϬϟϞϴϐθΘϟΓ˯ ΎϔϛϦϤπ ϳΎϬϤϴϠδΗϞΒϗϭϊ Ϩμ Ϥϟ ϞΧΩΕΎΠΘϨϤϠϟϖϴϗΪϟκ Τϔϟϥϭ
ΎϨΗΎΠΘϨϣϦϣϥϮΟΎΘΤΗΎϤΑϢϜΘϣΪΨϟϥϭΰϫΎΟϦΤϧϭϞπ ϓϷ ϢϳΪϘΗϮϫ˱ΎϤ ΩΎϨϓάϫϥ
ϡήΘΣϻϖΎϓϝϮΒϘΑϮϠπ ϔΗϭ
ϡΎόϟήϳΪϤϟ
ΐ ϴτΨϟϢγ Ύϗ ϟΎλ ϥΎδΣ
MUSAID SWITCH GEAR FACTORY COMPANY LTD- RIYADH ORGANIZATION CHART
Document Number QM ISO 9001 2000 ORGANIZATION CHART CLAUSE 421 E-FILE Path MUSAID _ ORGANIZATION _ CHART PAGE 1 of 1
GENERAL MANAGER
ADMINISTRATION MANAGER
ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR
SECRETARY ndashCUM- DISPATCH CLERK
QUALITY CONTROL INSPECTOR
AUTO CAD DESIGNER
MANAGEMENT REPRESENTATIVE (MR
MANAGEMENT REPRESENTATIVE (MR) amp QUALITY COORDINATOR (QC)
FACTORY MANAGER
GENERAL MANAGER GENERAL MANAGER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
ELECTRICAL SUPERVISOR
FACTORY MANAGER HR amp ACCOUNTS
FOREMAN- CUM - MECHANICAL SUPERVISOR
QUALITY CONTROL INSPECTOR
ELECTRICAL SUPERVISOR
ACCOUNTS CLERK ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR
ACCOUNTS CLERK
HR amp ACCOUNTS
HR amp ACCOUNTS
COMMERCIAL CERTIFICATES COMMERCIAL CERTIFICATES AND LICENSESAND LICENSES
CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE
PLANTS AND MACHINERIESPLANTS AND MACHINERIES
SURFACE TREATMENT PLANT
MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant
Stages of our Surface Treatment are summarized as below
1 Pretreatment Degreasing and Cleaning of Sheet Surface is
treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade
2 Powder Coating After degreasing the treated surface goes to
Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun
3 Furnace Baking Coated enclosures or sheet surfaces pass inside
Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period
4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions
MAJOR MACHINES COMMISSIONED IN MUSAID
A SHEET METAL FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication
Machine 1 FINN Power-
Finland 2 CNC(Programmable) Hydraulic Sheet Bending
Machine (500 KN) 1 Darley-Italy
3 Hydraulic High Press Bending Machines (3 meter length)
3 OMAG Germany
4 Hydraulic High Press Shearing Machines (3 meter length)
2 OMAG Germany
5 Pneumatic Sheet Notching Machines 2 -----
6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany
7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany
8 CO2 Gas Welding Machines 2 ----
9 Electric Arc Welding Machines 15 ----
10 Portable Arc Electric Welding Machines (for site jobs)
3
KEMPPI Germany
11 Electric Spot Welding Machine 1 FIFES Italy
12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea
13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN
SNo MACHINE DESCRIPTION QTY MAKE
1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)
1 SUNRISE ndashKorea
2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea
3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)
1 EUROMACKorea
4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany
5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany
6 Vertical Drilling amp Milling Machine (Upto 40 mm)
2 China
7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly
B BUS BAR FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)
1 Intech OverseasIndia
2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface
1 Intech OverseasIndia
3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)
1 Italy
4 Polyester Powder Thickness Tester 1 ----
C SURFACE TREATMENT amp POWDER PAINT COATING PLANT
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
I N T R O D U C T I O N
Dear Sir
It is our pleasure to introduce ourselves as leading manufacturers of ELECTRICAL SWITCH GEAR and associated equipment in SAUDI ARABIA Established in 1975 MUSAID SWITCH GEAR FAC Co LTD in a span of 34 years has expanded its area and scope of activities promoting development of Electrical Technology in the Kingdom importance of which can not be emphasized With the commissioning of newly acquired machinery and technical know-how it is now geared much better to manufacture Electrical Distribution Panels Distribution Boards Motor Control CentersPower Factor improvements panels Outdoor type Package Substations Cable Distribution Pillars and Instrumentation Control panel for special applications Through continued endeavor to achieve the best MUSAID SWITCH GEAR FACCoLTD has now introduced a completely new generation of Electrical Switch Gear and Panels which are sensibly coordinated in design and performance Plans are also underway to expand its activities to the manufacture of High Voltage Switchgear in near future Our products offer convincing advantages of long service life and optimum efficiency with a wide margin of protection against over loading Maximum safety is built-in by strict quality control and adherence to National and International safety regulations Our products conform to BS IEC-439 and Enclosures are built in conformity with NEMA-1NEMA-4NEMA-5 NEMA-9 and NEMA-3R Rigorous factory testes are conducted before the equipment leaves the factory indeed acquisition of advanced technology and skill in the field of Electrical Engineering is a ldquoMUSTrdquo for standing shoulder to shoulder with the advanced countries of the world Your Faithfully
for MUSAID SWITCH GEAR FACTORY
IHSAN SALEH AL KHATEEB (Managing Director)
ΪϴδϟΔϳΎϨϋ
ϪΗΎϛήΑϭ ΔϤΣέϭϢϜϴϠϋϡϼδϟͿ
ΎϬϟΔΒΣΎμ Ϥϟ ΕΪόϤϟϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟϦϳΪέϦϴόϨμ ϤϛΎϨδϔϧϢϜϟϡΪϘϧϥ Ύϧέϭήγ ϲ ϋϭΩϦϤϟϪϧ
ΔϳΩϮόδϟΔϴΑήόϟΔϜϠϤϤϟϲ ϓ
)ϡΎϋΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟΪϋΎδϣϊ Ϩμ ϣβ γ ΄Η1975ϢΗΓήΒΨϟ Ϧϣ˱ΎϣΎϋϥϮΛϼΛϭϊ Αέ ϯ ΪϣϰϠϋϭϡ (
ΕϻϷϡΪΨΘγ ΈΑϭ ΔϜϠϤϤϟϲ ϓΔϴΎΑήϬϜϟΎϴΟϮϟϮϨϜΘϟέϮτΗΐ ϛϮϴϟϊ Ϩμ ϤϟΕΎσΎθϧϝΎΠϣήϳϮτΗϭϊ ϴγ ϮΗ
ΔϴΟέΎΨϟΔϴϋήϔϟΕΎτΤϤϟϭΕΎϛήΤϤϟΎΑϢϜΤΘϟΰϛήϣϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϟϊ ϴϨμ ΗϥΎϜϣϻΎΑ Βλ ΔΜϳΪΤϟ
ϲ ϟΎόϟςϐπ ϟ ϴΗΎϔϣΕΎΣϮϟϭΔλ ΎΨϟΕΎϣΪΨΘγ ϼϟϢϜΤΘϟΕΎΣϮϟϚϟάϛΕϼΑΎϜϟ ϊ ϳίϮΗΕΎΣϮϟϭ
ΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎτΤϣΕΎΠΘϨϣϢϳΪϘΗϦϣΪϋΎδϣϊ Ϩμ ϣϦϜϤΗϞπ ϓϷ ϖϴϘΤΘϟϞλ ϮΘϤϟϲ όδϟϝϼΧϦϣϭ
Γ˯ ΎϔϜϟϭϢϴϤμ ΘϟΚϴΣϦϣϖγ ΎϨΘϣϞϜθΑϢϜΤΘϟ ΰϛήϣϭ
έΎΒΘϋϻϦϴόΑάΧϷϊ ϣΕΎΠΘϨϤϠϟΔϴϟΎόϟ Γ˯ ΎϔϜϟϭϞϤόϟΓήΘϓϝϮσΚϴΣϦϣΓήϴΒϛΪ ϮϓϦϣΆΗϊ Ϩμ ϤϟΕΎΠΘϨϣϥ
ΪΰϟϞϴϤΤΘϟήσΎΨϣϦϣΕΎΣϮϠϟ ϩάϫΔϳΎϤΣ
ΕΎΠΘϨϤϟΔϘΑΎτϣϝϼΧϦϣΔϴϋϮϨϠϟϖϴϗΪϟ ςΒπ ϟϝϼΧϦϣΎϬϨϣϖϘΤΘϟ ϢΘϳΕΎΠΘϨϤϠϟΔϣϼδϟ ήϴϳΎόϣϥ
)ΔϴϟϭΪϟϭΔϳΩϮόδϟΕΎϔλ ϮϤϟϊ ϣϖΑΎτΘΗΎϨΗΎΠΘϨϣϥ ΚϴΣ ΔϴϟϭΪϟϭΔϴϨσϮϟήϴϳΎόϤϟϭΕΎϔλ ϮϤϠϟIES (
ΕΎΠΘϨϤϟϩάϬϟϞϴϐθΘϟΓ˯ ΎϔϛϦϤπ ϳΎϬϤϴϠδΗϞΒϗϭϊ Ϩμ Ϥϟ ϞΧΩΕΎΠΘϨϤϠϟϖϴϗΪϟκ Τϔϟϥϭ
ΎϨΗΎΠΘϨϣϦϣϥϮΟΎΘΤΗΎϤΑϢϜΘϣΪΨϟϥϭΰϫΎΟϦΤϧϭϞπ ϓϷ ϢϳΪϘΗϮϫ˱ΎϤ ΩΎϨϓάϫϥ
ϡήΘΣϻϖΎϓϝϮΒϘΑϮϠπ ϔΗϭ
ϡΎόϟήϳΪϤϟ
ΐ ϴτΨϟϢγ Ύϗ ϟΎλ ϥΎδΣ
MUSAID SWITCH GEAR FACTORY COMPANY LTD- RIYADH ORGANIZATION CHART
Document Number QM ISO 9001 2000 ORGANIZATION CHART CLAUSE 421 E-FILE Path MUSAID _ ORGANIZATION _ CHART PAGE 1 of 1
GENERAL MANAGER
ADMINISTRATION MANAGER
ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR
SECRETARY ndashCUM- DISPATCH CLERK
QUALITY CONTROL INSPECTOR
AUTO CAD DESIGNER
MANAGEMENT REPRESENTATIVE (MR
MANAGEMENT REPRESENTATIVE (MR) amp QUALITY COORDINATOR (QC)
FACTORY MANAGER
GENERAL MANAGER GENERAL MANAGER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
ELECTRICAL SUPERVISOR
FACTORY MANAGER HR amp ACCOUNTS
FOREMAN- CUM - MECHANICAL SUPERVISOR
QUALITY CONTROL INSPECTOR
ELECTRICAL SUPERVISOR
ACCOUNTS CLERK ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR
ACCOUNTS CLERK
HR amp ACCOUNTS
HR amp ACCOUNTS
COMMERCIAL CERTIFICATES COMMERCIAL CERTIFICATES AND LICENSESAND LICENSES
CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE
PLANTS AND MACHINERIESPLANTS AND MACHINERIES
SURFACE TREATMENT PLANT
MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant
Stages of our Surface Treatment are summarized as below
1 Pretreatment Degreasing and Cleaning of Sheet Surface is
treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade
2 Powder Coating After degreasing the treated surface goes to
Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun
3 Furnace Baking Coated enclosures or sheet surfaces pass inside
Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period
4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions
MAJOR MACHINES COMMISSIONED IN MUSAID
A SHEET METAL FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication
Machine 1 FINN Power-
Finland 2 CNC(Programmable) Hydraulic Sheet Bending
Machine (500 KN) 1 Darley-Italy
3 Hydraulic High Press Bending Machines (3 meter length)
3 OMAG Germany
4 Hydraulic High Press Shearing Machines (3 meter length)
2 OMAG Germany
5 Pneumatic Sheet Notching Machines 2 -----
6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany
7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany
8 CO2 Gas Welding Machines 2 ----
9 Electric Arc Welding Machines 15 ----
10 Portable Arc Electric Welding Machines (for site jobs)
3
KEMPPI Germany
11 Electric Spot Welding Machine 1 FIFES Italy
12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea
13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN
SNo MACHINE DESCRIPTION QTY MAKE
1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)
1 SUNRISE ndashKorea
2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea
3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)
1 EUROMACKorea
4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany
5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany
6 Vertical Drilling amp Milling Machine (Upto 40 mm)
2 China
7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly
B BUS BAR FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)
1 Intech OverseasIndia
2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface
1 Intech OverseasIndia
3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)
1 Italy
4 Polyester Powder Thickness Tester 1 ----
C SURFACE TREATMENT amp POWDER PAINT COATING PLANT
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
ΪϴδϟΔϳΎϨϋ
ϪΗΎϛήΑϭ ΔϤΣέϭϢϜϴϠϋϡϼδϟͿ
ΎϬϟΔΒΣΎμ Ϥϟ ΕΪόϤϟϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟϦϳΪέϦϴόϨμ ϤϛΎϨδϔϧϢϜϟϡΪϘϧϥ Ύϧέϭήγ ϲ ϋϭΩϦϤϟϪϧ
ΔϳΩϮόδϟΔϴΑήόϟΔϜϠϤϤϟϲ ϓ
)ϡΎϋΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϠϟΪϋΎδϣϊ Ϩμ ϣβ γ ΄Η1975ϢΗΓήΒΨϟ Ϧϣ˱ΎϣΎϋϥϮΛϼΛϭϊ Αέ ϯ ΪϣϰϠϋϭϡ (
ΕϻϷϡΪΨΘγ ΈΑϭ ΔϜϠϤϤϟϲ ϓΔϴΎΑήϬϜϟΎϴΟϮϟϮϨϜΘϟέϮτΗΐ ϛϮϴϟϊ Ϩμ ϤϟΕΎσΎθϧϝΎΠϣήϳϮτΗϭϊ ϴγ ϮΗ
ΔϴΟέΎΨϟΔϴϋήϔϟΕΎτΤϤϟϭΕΎϛήΤϤϟΎΑϢϜΤΘϟΰϛήϣϭΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎΣϮϟϊ ϴϨμ ΗϥΎϜϣϻΎΑ Βλ ΔΜϳΪΤϟ
ϲ ϟΎόϟςϐπ ϟ ϴΗΎϔϣΕΎΣϮϟϭΔλ ΎΨϟΕΎϣΪΨΘγ ϼϟϢϜΤΘϟΕΎΣϮϟϚϟάϛΕϼΑΎϜϟ ϊ ϳίϮΗΕΎΣϮϟϭ
ΔϴΎΑήϬϜϟϊ ϳίϮΘϟΕΎτΤϣΕΎΠΘϨϣϢϳΪϘΗϦϣΪϋΎδϣϊ Ϩμ ϣϦϜϤΗϞπ ϓϷ ϖϴϘΤΘϟϞλ ϮΘϤϟϲ όδϟϝϼΧϦϣϭ
Γ˯ ΎϔϜϟϭϢϴϤμ ΘϟΚϴΣϦϣϖγ ΎϨΘϣϞϜθΑϢϜΤΘϟ ΰϛήϣϭ
έΎΒΘϋϻϦϴόΑάΧϷϊ ϣΕΎΠΘϨϤϠϟΔϴϟΎόϟ Γ˯ ΎϔϜϟϭϞϤόϟΓήΘϓϝϮσΚϴΣϦϣΓήϴΒϛΪ ϮϓϦϣΆΗϊ Ϩμ ϤϟΕΎΠΘϨϣϥ
ΪΰϟϞϴϤΤΘϟήσΎΨϣϦϣΕΎΣϮϠϟ ϩάϫΔϳΎϤΣ
ΕΎΠΘϨϤϟΔϘΑΎτϣϝϼΧϦϣΔϴϋϮϨϠϟϖϴϗΪϟ ςΒπ ϟϝϼΧϦϣΎϬϨϣϖϘΤΘϟ ϢΘϳΕΎΠΘϨϤϠϟΔϣϼδϟ ήϴϳΎόϣϥ
)ΔϴϟϭΪϟϭΔϳΩϮόδϟΕΎϔλ ϮϤϟϊ ϣϖΑΎτΘΗΎϨΗΎΠΘϨϣϥ ΚϴΣ ΔϴϟϭΪϟϭΔϴϨσϮϟήϴϳΎόϤϟϭΕΎϔλ ϮϤϠϟIES (
ΕΎΠΘϨϤϟϩάϬϟϞϴϐθΘϟΓ˯ ΎϔϛϦϤπ ϳΎϬϤϴϠδΗϞΒϗϭϊ Ϩμ Ϥϟ ϞΧΩΕΎΠΘϨϤϠϟϖϴϗΪϟκ Τϔϟϥϭ
ΎϨΗΎΠΘϨϣϦϣϥϮΟΎΘΤΗΎϤΑϢϜΘϣΪΨϟϥϭΰϫΎΟϦΤϧϭϞπ ϓϷ ϢϳΪϘΗϮϫ˱ΎϤ ΩΎϨϓάϫϥ
ϡήΘΣϻϖΎϓϝϮΒϘΑϮϠπ ϔΗϭ
ϡΎόϟήϳΪϤϟ
ΐ ϴτΨϟϢγ Ύϗ ϟΎλ ϥΎδΣ
MUSAID SWITCH GEAR FACTORY COMPANY LTD- RIYADH ORGANIZATION CHART
Document Number QM ISO 9001 2000 ORGANIZATION CHART CLAUSE 421 E-FILE Path MUSAID _ ORGANIZATION _ CHART PAGE 1 of 1
GENERAL MANAGER
ADMINISTRATION MANAGER
ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR
SECRETARY ndashCUM- DISPATCH CLERK
QUALITY CONTROL INSPECTOR
AUTO CAD DESIGNER
MANAGEMENT REPRESENTATIVE (MR
MANAGEMENT REPRESENTATIVE (MR) amp QUALITY COORDINATOR (QC)
FACTORY MANAGER
GENERAL MANAGER GENERAL MANAGER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
ELECTRICAL SUPERVISOR
FACTORY MANAGER HR amp ACCOUNTS
FOREMAN- CUM - MECHANICAL SUPERVISOR
QUALITY CONTROL INSPECTOR
ELECTRICAL SUPERVISOR
ACCOUNTS CLERK ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR
ACCOUNTS CLERK
HR amp ACCOUNTS
HR amp ACCOUNTS
COMMERCIAL CERTIFICATES COMMERCIAL CERTIFICATES AND LICENSESAND LICENSES
CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE
PLANTS AND MACHINERIESPLANTS AND MACHINERIES
SURFACE TREATMENT PLANT
MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant
Stages of our Surface Treatment are summarized as below
1 Pretreatment Degreasing and Cleaning of Sheet Surface is
treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade
2 Powder Coating After degreasing the treated surface goes to
Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun
3 Furnace Baking Coated enclosures or sheet surfaces pass inside
Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period
4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions
MAJOR MACHINES COMMISSIONED IN MUSAID
A SHEET METAL FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication
Machine 1 FINN Power-
Finland 2 CNC(Programmable) Hydraulic Sheet Bending
Machine (500 KN) 1 Darley-Italy
3 Hydraulic High Press Bending Machines (3 meter length)
3 OMAG Germany
4 Hydraulic High Press Shearing Machines (3 meter length)
2 OMAG Germany
5 Pneumatic Sheet Notching Machines 2 -----
6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany
7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany
8 CO2 Gas Welding Machines 2 ----
9 Electric Arc Welding Machines 15 ----
10 Portable Arc Electric Welding Machines (for site jobs)
3
KEMPPI Germany
11 Electric Spot Welding Machine 1 FIFES Italy
12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea
13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN
SNo MACHINE DESCRIPTION QTY MAKE
1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)
1 SUNRISE ndashKorea
2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea
3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)
1 EUROMACKorea
4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany
5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany
6 Vertical Drilling amp Milling Machine (Upto 40 mm)
2 China
7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly
B BUS BAR FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)
1 Intech OverseasIndia
2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface
1 Intech OverseasIndia
3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)
1 Italy
4 Polyester Powder Thickness Tester 1 ----
C SURFACE TREATMENT amp POWDER PAINT COATING PLANT
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
MUSAID SWITCH GEAR FACTORY COMPANY LTD- RIYADH ORGANIZATION CHART
Document Number QM ISO 9001 2000 ORGANIZATION CHART CLAUSE 421 E-FILE Path MUSAID _ ORGANIZATION _ CHART PAGE 1 of 1
GENERAL MANAGER
ADMINISTRATION MANAGER
ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR
SECRETARY ndashCUM- DISPATCH CLERK
QUALITY CONTROL INSPECTOR
AUTO CAD DESIGNER
MANAGEMENT REPRESENTATIVE (MR
MANAGEMENT REPRESENTATIVE (MR) amp QUALITY COORDINATOR (QC)
FACTORY MANAGER
GENERAL MANAGER GENERAL MANAGER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
SALES DESIGN PURCHASE amp EXECUTION ENGINEER
ELECTRICAL SUPERVISOR
FACTORY MANAGER HR amp ACCOUNTS
FOREMAN- CUM - MECHANICAL SUPERVISOR
QUALITY CONTROL INSPECTOR
ELECTRICAL SUPERVISOR
ACCOUNTS CLERK ACCOUNTS CLERK FOREMAN- CUM - MECHANICAL SUPERVISOR
ACCOUNTS CLERK
HR amp ACCOUNTS
HR amp ACCOUNTS
COMMERCIAL CERTIFICATES COMMERCIAL CERTIFICATES AND LICENSESAND LICENSES
CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE
PLANTS AND MACHINERIESPLANTS AND MACHINERIES
SURFACE TREATMENT PLANT
MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant
Stages of our Surface Treatment are summarized as below
1 Pretreatment Degreasing and Cleaning of Sheet Surface is
treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade
2 Powder Coating After degreasing the treated surface goes to
Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun
3 Furnace Baking Coated enclosures or sheet surfaces pass inside
Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period
4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions
MAJOR MACHINES COMMISSIONED IN MUSAID
A SHEET METAL FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication
Machine 1 FINN Power-
Finland 2 CNC(Programmable) Hydraulic Sheet Bending
Machine (500 KN) 1 Darley-Italy
3 Hydraulic High Press Bending Machines (3 meter length)
3 OMAG Germany
4 Hydraulic High Press Shearing Machines (3 meter length)
2 OMAG Germany
5 Pneumatic Sheet Notching Machines 2 -----
6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany
7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany
8 CO2 Gas Welding Machines 2 ----
9 Electric Arc Welding Machines 15 ----
10 Portable Arc Electric Welding Machines (for site jobs)
3
KEMPPI Germany
11 Electric Spot Welding Machine 1 FIFES Italy
12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea
13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN
SNo MACHINE DESCRIPTION QTY MAKE
1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)
1 SUNRISE ndashKorea
2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea
3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)
1 EUROMACKorea
4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany
5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany
6 Vertical Drilling amp Milling Machine (Upto 40 mm)
2 China
7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly
B BUS BAR FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)
1 Intech OverseasIndia
2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface
1 Intech OverseasIndia
3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)
1 Italy
4 Polyester Powder Thickness Tester 1 ----
C SURFACE TREATMENT amp POWDER PAINT COATING PLANT
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
COMMERCIAL CERTIFICATES COMMERCIAL CERTIFICATES AND LICENSESAND LICENSES
CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE
PLANTS AND MACHINERIESPLANTS AND MACHINERIES
SURFACE TREATMENT PLANT
MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant
Stages of our Surface Treatment are summarized as below
1 Pretreatment Degreasing and Cleaning of Sheet Surface is
treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade
2 Powder Coating After degreasing the treated surface goes to
Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun
3 Furnace Baking Coated enclosures or sheet surfaces pass inside
Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period
4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions
MAJOR MACHINES COMMISSIONED IN MUSAID
A SHEET METAL FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication
Machine 1 FINN Power-
Finland 2 CNC(Programmable) Hydraulic Sheet Bending
Machine (500 KN) 1 Darley-Italy
3 Hydraulic High Press Bending Machines (3 meter length)
3 OMAG Germany
4 Hydraulic High Press Shearing Machines (3 meter length)
2 OMAG Germany
5 Pneumatic Sheet Notching Machines 2 -----
6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany
7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany
8 CO2 Gas Welding Machines 2 ----
9 Electric Arc Welding Machines 15 ----
10 Portable Arc Electric Welding Machines (for site jobs)
3
KEMPPI Germany
11 Electric Spot Welding Machine 1 FIFES Italy
12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea
13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN
SNo MACHINE DESCRIPTION QTY MAKE
1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)
1 SUNRISE ndashKorea
2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea
3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)
1 EUROMACKorea
4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany
5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany
6 Vertical Drilling amp Milling Machine (Upto 40 mm)
2 China
7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly
B BUS BAR FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)
1 Intech OverseasIndia
2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface
1 Intech OverseasIndia
3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)
1 Italy
4 Polyester Powder Thickness Tester 1 ----
C SURFACE TREATMENT amp POWDER PAINT COATING PLANT
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
CERTIFICATES OF COMPLIANCECERTIFICATES OF COMPLIANCE
PLANTS AND MACHINERIESPLANTS AND MACHINERIES
SURFACE TREATMENT PLANT
MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant
Stages of our Surface Treatment are summarized as below
1 Pretreatment Degreasing and Cleaning of Sheet Surface is
treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade
2 Powder Coating After degreasing the treated surface goes to
Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun
3 Furnace Baking Coated enclosures or sheet surfaces pass inside
Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period
4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions
MAJOR MACHINES COMMISSIONED IN MUSAID
A SHEET METAL FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication
Machine 1 FINN Power-
Finland 2 CNC(Programmable) Hydraulic Sheet Bending
Machine (500 KN) 1 Darley-Italy
3 Hydraulic High Press Bending Machines (3 meter length)
3 OMAG Germany
4 Hydraulic High Press Shearing Machines (3 meter length)
2 OMAG Germany
5 Pneumatic Sheet Notching Machines 2 -----
6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany
7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany
8 CO2 Gas Welding Machines 2 ----
9 Electric Arc Welding Machines 15 ----
10 Portable Arc Electric Welding Machines (for site jobs)
3
KEMPPI Germany
11 Electric Spot Welding Machine 1 FIFES Italy
12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea
13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN
SNo MACHINE DESCRIPTION QTY MAKE
1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)
1 SUNRISE ndashKorea
2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea
3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)
1 EUROMACKorea
4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany
5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany
6 Vertical Drilling amp Milling Machine (Upto 40 mm)
2 China
7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly
B BUS BAR FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)
1 Intech OverseasIndia
2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface
1 Intech OverseasIndia
3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)
1 Italy
4 Polyester Powder Thickness Tester 1 ----
C SURFACE TREATMENT amp POWDER PAINT COATING PLANT
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
PLANTS AND MACHINERIESPLANTS AND MACHINERIES
SURFACE TREATMENT PLANT
MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant
Stages of our Surface Treatment are summarized as below
1 Pretreatment Degreasing and Cleaning of Sheet Surface is
treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade
2 Powder Coating After degreasing the treated surface goes to
Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun
3 Furnace Baking Coated enclosures or sheet surfaces pass inside
Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period
4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions
MAJOR MACHINES COMMISSIONED IN MUSAID
A SHEET METAL FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication
Machine 1 FINN Power-
Finland 2 CNC(Programmable) Hydraulic Sheet Bending
Machine (500 KN) 1 Darley-Italy
3 Hydraulic High Press Bending Machines (3 meter length)
3 OMAG Germany
4 Hydraulic High Press Shearing Machines (3 meter length)
2 OMAG Germany
5 Pneumatic Sheet Notching Machines 2 -----
6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany
7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany
8 CO2 Gas Welding Machines 2 ----
9 Electric Arc Welding Machines 15 ----
10 Portable Arc Electric Welding Machines (for site jobs)
3
KEMPPI Germany
11 Electric Spot Welding Machine 1 FIFES Italy
12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea
13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN
SNo MACHINE DESCRIPTION QTY MAKE
1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)
1 SUNRISE ndashKorea
2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea
3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)
1 EUROMACKorea
4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany
5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany
6 Vertical Drilling amp Milling Machine (Upto 40 mm)
2 China
7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly
B BUS BAR FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)
1 Intech OverseasIndia
2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface
1 Intech OverseasIndia
3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)
1 Italy
4 Polyester Powder Thickness Tester 1 ----
C SURFACE TREATMENT amp POWDER PAINT COATING PLANT
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
SURFACE TREATMENT PLANT
MUSAID SWITCH GEAR FACTORY Co LTD in service a semi automatic Surface Treatment Plant
Stages of our Surface Treatment are summarized as below
1 Pretreatment Degreasing and Cleaning of Sheet Surface is
treated first by going through seven tank process using solvents of Zinc Phosphatic Chemicals at temperature of 90deg Centigrade
2 Powder Coating After degreasing the treated surface goes to
Powder coating chamber where painting coats are applied at treated surface by Electrostatic Polyester powder paint using 70KV voltages by Electrostatic Powder coating gun
3 Furnace Baking Coated enclosures or sheet surfaces pass inside
Furnace through automatic conveyer for baking the painted surface at 185deg Centigrade for a limited time period
4 Natural Cooling of Surface This procedure provides a good quality finishing and high resistance power to Enclosures Surfaces even in hard and hot climate conditions
MAJOR MACHINES COMMISSIONED IN MUSAID
A SHEET METAL FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication
Machine 1 FINN Power-
Finland 2 CNC(Programmable) Hydraulic Sheet Bending
Machine (500 KN) 1 Darley-Italy
3 Hydraulic High Press Bending Machines (3 meter length)
3 OMAG Germany
4 Hydraulic High Press Shearing Machines (3 meter length)
2 OMAG Germany
5 Pneumatic Sheet Notching Machines 2 -----
6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany
7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany
8 CO2 Gas Welding Machines 2 ----
9 Electric Arc Welding Machines 15 ----
10 Portable Arc Electric Welding Machines (for site jobs)
3
KEMPPI Germany
11 Electric Spot Welding Machine 1 FIFES Italy
12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea
13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN
SNo MACHINE DESCRIPTION QTY MAKE
1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)
1 SUNRISE ndashKorea
2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea
3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)
1 EUROMACKorea
4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany
5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany
6 Vertical Drilling amp Milling Machine (Upto 40 mm)
2 China
7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly
B BUS BAR FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)
1 Intech OverseasIndia
2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface
1 Intech OverseasIndia
3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)
1 Italy
4 Polyester Powder Thickness Tester 1 ----
C SURFACE TREATMENT amp POWDER PAINT COATING PLANT
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
MAJOR MACHINES COMMISSIONED IN MUSAID
A SHEET METAL FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE 1 CNC(Programmable) Sheet Metal Fabrication
Machine 1 FINN Power-
Finland 2 CNC(Programmable) Hydraulic Sheet Bending
Machine (500 KN) 1 Darley-Italy
3 Hydraulic High Press Bending Machines (3 meter length)
3 OMAG Germany
4 Hydraulic High Press Shearing Machines (3 meter length)
2 OMAG Germany
5 Pneumatic Sheet Notching Machines 2 -----
6 Hydraulic Press Machine For Knockouts Punching 2 NOVO PRESS Germany
7 Hydraulic Press Machine For Louvers Punching 2 NOVO PRESS Germany
8 CO2 Gas Welding Machines 2 ----
9 Electric Arc Welding Machines 15 ----
10 Portable Arc Electric Welding Machines (for site jobs)
3
KEMPPI Germany
11 Electric Spot Welding Machine 1 FIFES Italy
12 Air Plasma Sheet Cutting Machine 1 DECA PAC Korea
13 Electric Powered Large Band Saw 1 NOAV EQUIPMENT TAIWAN
SNo MACHINE DESCRIPTION QTY MAKE
1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)
1 SUNRISE ndashKorea
2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea
3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)
1 EUROMACKorea
4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany
5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany
6 Vertical Drilling amp Milling Machine (Upto 40 mm)
2 China
7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly
B BUS BAR FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)
1 Intech OverseasIndia
2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface
1 Intech OverseasIndia
3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)
1 Italy
4 Polyester Powder Thickness Tester 1 ----
C SURFACE TREATMENT amp POWDER PAINT COATING PLANT
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
SNo MACHINE DESCRIPTION QTY MAKE
1 CNC (Programmable) Bus bar FabricationMachine 60 Tonnes (Multi Punch)
1 SUNRISE ndashKorea
2 Programmable Hydraulic Bus bar Bending Machines (Multi Punch) 2 NAM SUNGKorea
3 Programmable Hydraulic Bus bar Bending amp Punching Machine (Multi Punch)
1 EUROMACKorea
4 Hydraulic Bus bar Punching Press 5 NOVO PRESSGermany
5 Hydraulic Bus bar Cutting Press 2 NOVO PRESSGermany
6 Vertical Drilling amp Milling Machine (Upto 40 mm)
2 China
7 Vertical Drilling amp Milling Machine 2 LUNAN ContinentalItaly
B BUS BAR FABRICATION MACHINES
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)
1 Intech OverseasIndia
2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface
1 Intech OverseasIndia
3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)
1 Italy
4 Polyester Powder Thickness Tester 1 ----
C SURFACE TREATMENT amp POWDER PAINT COATING PLANT
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Automatic Conveyer 122 Meter Length ( point load 80 kg total load 4500kg)
1 Intech OverseasIndia
2 Seven Tanks Process Sheet Treatment Plant (By Zinc Phosphastic Chemicals) With electric oven to dry the surface
1 Intech OverseasIndia
3 Automatic Polyester Powder Coating Plant (With diesel burner oven maintained temperature upto 180deg Celsius)
1 Italy
4 Polyester Powder Thickness Tester 1 ----
C SURFACE TREATMENT amp POWDER PAINT COATING PLANT
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
SNo MACHINE DESCRIPTION QTY MAKE
1 Electric Powered Chain Hoist 5 Tonnes 35 Meter Length
1 KURDONGKorea
2 Hydraulic Mobile Fork Lift 3 Tonnes 2 TOYOTAJapan
3 Trolley Jacks 2 Tonnes 5 -----
D LOAD LIFTING FACILITIES
SNo TESTING EQUIPMENTS QTY MAKE
1 Load Bank for Direct Injection Test (Suitable Upto 600A)
1 CALTROLS Germany
2 AC High Voltage Insulation Tester 25 KV 1 SEW Standard3 DC High Voltage Insulation Tester 1 KV DC 1 KYORITSU4 AC Break Down Tester 4 KV 1 AVO5 Mega Ohm Meter (Megger) Tester 1 HIOKI6 Torque Wrench Tester 1 -----
E TESTING EQUIPMENTS
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
PLANT SURVEY REPORT OF PLANT SURVEY REPORT OF SCECOSCECO
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
SCECO PURCHASE ORDERSCECO PURCHASE ORDER
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
SOME PROJECTS AT A GLANCESOME PROJECTS AT A GLANCE
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
SNo MATERIAL DESCRIPTION PROJECT CLIENT CONTRACTOR
1 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
ABHA AIR PORTROYAL PAVILLIONEXTENSION
MINISTRY OFDEFENCE (MODA)
AL MABANIGENCONTCo
2 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA
AL MABANIGENCONTCo
3 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
YANBU AIR PORT MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
4 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
MADAEN SALEH AIR PORT (Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
5 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
AL KHARJ AIR BASE MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
6 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
NAJRAN AIR PORT(Under Construction)
MINISTRY OFDEFENCE (MODA)
AL MABANICONTCo
7 138 KV PACKAGE SUBSTATIONS amp DISTRIBUTION PANEL BOARDS
GEANT PLAZAAL HOKAIR MALL
FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCos
8 PANEL BOARDS ATS PANELS ampCAPACITOR BANKS
DAHRAN MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
9 PANEL BOARDS ATS PANELS amp CAPACITOR BANKS
HAFOUF MALL FAWAZ AL HOKAIRGROUP
AL HOKAIRCONTCo
10 DISTRIBUTION PANEL BOARDS TABARJAL HOSPITAL MINISTRY OFHEALTH
SETCOCONT Co
11 DISTRIBUTION PANEL BOARDS JIZAN POST OFFICE AL TERAISCONTCo
12 DISTRIBUTION PANEL BOARDS POST OFFICE PROJECT AL FADIL EST
13 DISTRIBUTION PANEL BOARDS PRIMARY HEALTH CARE CENTRERIYADH
MINISTRY OFDEFENCE (MODA)
AL MABANIGEN CONT Co
14 DISTRIBUTION PANEL BOARDSAND MOTOR CONTROL CENTER
PEACE SUN-9DAHRAN AIR PORT PROJECT
MODARSAF
BAUNST NEDAM
15 DISTRIBUTION PANEL BOARDamp ATS
RSNF HEAD QUARTER BUILDING MODA RSNFRIYADH
TEST CONT Co
SOME LATEST COMPLETED PROJECTS DETAIL
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
16 STAR DELTA STARTER PANELS SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPANY SAUDI NATIONAL PUMPS COMPNAY
17 AIR INSULATED BUS DUCT-4000A90 METER LONG
ABB ABB ABB
18 DISTRIBUTION PANEL BOARDSamp ATS PANELS
CRCC- RIYADH SEC-CRB- RIYADH AL ARRABCONT Co
19 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL MEEDCOHYUNDAI Co
20 ACDC PANEL BOARDS DIFFERENT SUBSTATIONS
SCECO- CENTRAL COGILEX ALSTOM
21 ACDC PANEL BOARDS SUBSTATIONS8760
SCECO- CENTRAL SIEMENS
22 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL BABTAINCONT Co
23 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH AL KADICONT Co
24 132 KV SUBSTATION LIGHTING PANEL BOARDS
DIFFERENT SUBSTATIONS
SEC-CRB- RIYADH OSSAIS CONT Co
25 DISTRIBUTION PANEL BOARDS AL WASSIL TOWERRIYADH
PRIVATE -----
26 DISTRIBUTION PANEL BOARDS RED EX TOWER AL DAFA Co MOBCO
27 DISTRIBUTION PANEL BOARDS NATIONAL GUARD NATIONAL GUARD AL FOUZAN Co
28 DISTRIBUTION PANEL BOARDS ZAKAT BUILDING MINISTRY OFFINANCE
LAMEECCONT Co
29 DISTRIBUTION PANEL BOARDS JEDDAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
30 DISTRIBUTION PANEL BOARDS MADINAH HILTONHOTEL
HILTON HOTEL HAIF CONT Co
31 DISTRIBUTION PANEL BOARDS GIRLS MEDICAL COLLEGE - RIYADH KING SAUD UNIVERSITY AL ZABANCONT Co
32 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
LECTURE HALL BUILDING
KING SAUD UNIVERSITY A JA CONT Co
33 DISTRIBUTION PANEL BOARDS+ CAPACITOR BANK
PRINTING PRESSPROJECT
KING SAUD UNIVERSITY A JA CONT Co
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
34 STREET LIGHTING SUBSTATIONS RIYADH MUNICIPALITY RIYADHMUNICIPALITY
DIFFERENT CONTRACTORS
35 STREET LIGHTING SUBSTATIONS RIYADH RING ROAD MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
36 STREET LIGHTING SUBSTATIONS MAKKAH RIYADHHIGH WAY
MINISTRY OF TRANSPORT
SHIBH AL JAZIRAH Co
37 DISTRIBUTION PANEL BOARDS AL UMAM CENTER UMAM COMMERCIAL MARKET
AL FAYHACONTCo
38 DISTRIBUTION PANEL BOARDS BOYS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
39 DISTRIBUTION PANEL BOARDS GIRLS SCHOOL PROJECTS(Regular Business)
MINISTRY OF EDUCATION DIFFERENTCONTRACTORS
40 DISTRIBUTION PANEL BOARDS SCHOOL UPGRATIONPROJECTS (Regular Business)
MINISTRY OF EDUCATION ABA HUSSAINCONT Co
41 138 KV PACKAGE SUBSTATIONS AL NAHDA ROADPROJECT EXPANSION
MINISTRY OFTRANSPORT
ABA HUSSAINCONT Co
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
TESTING PROCEDURE AND TESTING PROCEDURE AND CERTIFICATESCERTIFICATES
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
TESTING PROCEDURE FOR PACKAGE SUBSTATIONS amp LV PANELS
Following testing procedure from our quality control department of various factory tests are being adopted in our factory before finally dispatching the materialWe classify our tests in three sections Which include the routine and acceptance tests asper IEC ndash 439 are as follows
1 Mechaical operation test2 Electrical operation test
3 Optional accessories test
After primary stage wise quality inspection during fabrication our quality sources checks the mechanical construction of panels Substations or whatever is being tested after assembly asper approved drawings and material lists from our client which includes visual checking such as scratches of painting welding ends joints positions of door placing of gaskets etc also visual checking includes others portions such as top and bottom plates Position of metering instruments positions of main circuit breaker cubicles Locks Keys Nuts Bolts torque test on busbars suitable earthing provision etc checking of panel dimensions required quantity amp rating of breakers contactors or other required electrical accessories installed size of busbars according to the requirement busbar supporting insulators according to breaking capacity also be checked before electrical tests
At second stage in electrical test includes checking the easy operation of breakers contactors and other electrical accessories according to the requirements without any
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
abnormalities Bolt tightening torque of busbars by torque wrench and in case of control circuit the connection of each equipment and relays the tightness of wire connections in the terminals of respective equipments are also be checked The connection to metering instruments CT connection earth leakage relays voltage relays phase relays and other control and monitoring devices etc are thoroughly checked asper single line diagram or material list of drawing
For insulation test we use meggers (500 V DC) This test includes the insulation resistance measurement between each phase (RY RB amp BY) and each phase and earth (RampE YampE BampE) and from one experience in most cases this value comes in mega ohms showing higher insulation resistance
Dielectric test or high voltage test be conducted by using high voltage tester for getting high voltage this test is conducted by applying 25 KV voltage for one minute between each phase neutral and earth to check any flash-over or puncture with stand capacity of panels at high voltages
Injection test also will be perform to test the real ampere rating of circuit breaker amp to make sure the breaker should be trip at the breaker rated current value
Continuity test is to be performed by using multimeter having sound monitors During testing the panels should not be energized from any source and test be carried out on each equipment and each full circuit after making respective equipments in on position
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
Optional accessories test use to conduct for all accessories such as motors releasing coil relays before and after assembling these devices inside the breakers and panels itself Control and monitoring relays and measuring instruments are also checked before arranging these inside the required panels
All these visual inspections and electrical mechanical tests are performed in the presence of any authorized person from client or consultant side for that we inform them before testing schedule and finally test certificate be issued to the client at the time of delivery together with warranty letter
- NOTHING FOLLOWS-
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
TEST CERTIFICATE CLIENT OUR REFERENCE DRAWING REFNo EQUIPMENT PROJECT SYSTEM VOLTAGE CURRENT CAPACITY SNo TEST RESULT 1 2 3
Inspection of wiring Dielectric test 2500 VAC 60 Hz is applied for 1 minbetween a) All live parts and frame b) Each poles amp all other parts are connected to frame Checking protective measures and electrical continuity
Accepted No flash over No puncture No flash over No puncture Accepted
Above mentioned routine tests conducted inside Musaid Factory are following standards of IEC- 439-2 September 1975 The equipment is accepted TESTS CONDUCTED BY
Name SHAHJAHAN LEBBA (QC Inspector) (MUSAID SWITCH GEAR FACTORY Co LTD) Signature
Tests witnessed by Name 1 Signature Name 2 Signature
Date
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
WARRANTY LETTERSWARRANTY LETTERS
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
War r ant y Let t er DATE
CLIENT
CONTRACTOR
PROJECT
OUR REFERENCE
DRAWING REF No
EQUIPMENT
The above mentioned equipment which is technically inspected and routine tested before delivery here in our factory are guaranteed from our factory for a period of 12 months from the date of delivery
Tests certificates are being issued separately for all above equipments individually
The guarantee covers any manufacturing or workmanship defects only
Thanks amp Regards
IHSAN S AL KHATEEB (General Manager)
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH
LOCATION MAPSLOCATION MAPS
THANKS amp VISIT AGAINTHANKS amp VISIT AGAIN
DESIGN BYAMJAD ALI KHAN DIRECTION BY
SYED TAUSIF SHAH