YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: UNIT 4B JAN 2012 REGENERATION IN POOLE HARBOUR

UNIT 4B JAN 2012

REGENERATION IN POOLE HARBOUR

Page 2: UNIT 4B JAN 2012 REGENERATION IN POOLE HARBOUR

HAMWORTHY GATE SITE LOOKING BACK TO MAIN REGENERATION ZONEThe access road is completed but site is closed and there is no access.

Page 3: UNIT 4B JAN 2012 REGENERATION IN POOLE HARBOUR

CURRENT BRIDGE

Currently only access point to ferry/ catamaran port and Hamworthy. Traffic along this route can be very heavily congested especially during the summer tourist season. The quay is a very popular destination. Congestion made worse when bridge is raised for boats.

Page 4: UNIT 4B JAN 2012 REGENERATION IN POOLE HARBOUR

NEW BRIDGE across Back Water Channel. This is from Poole side looking towards Hamworthy Gate.

Page 5: UNIT 4B JAN 2012 REGENERATION IN POOLE HARBOUR

View of Holes Bay from same site.

Page 6: UNIT 4B JAN 2012 REGENERATION IN POOLE HARBOUR

Empty office, retail outlet next to bridge site.

Page 7: UNIT 4B JAN 2012 REGENERATION IN POOLE HARBOUR

Sunseeker International and new RNLI HQ along minor road in Regeneration zone.

Page 8: UNIT 4B JAN 2012 REGENERATION IN POOLE HARBOUR

Further along the road. RNLI HQ and teaching centre.

Page 9: UNIT 4B JAN 2012 REGENERATION IN POOLE HARBOUR

Flat development on northern edge of site close to road and rail link opposite ASDA.

Page 10: UNIT 4B JAN 2012 REGENERATION IN POOLE HARBOUR

Another view of flats looking out over Holes Bay.

Page 11: UNIT 4B JAN 2012 REGENERATION IN POOLE HARBOUR

ASDA SUPERSTORE and new residential development.


Related Documents