Page 1: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.

Todd Grugel, MnDOT ADA Program Engineer

Page 2: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.

PROWAG adopted in February 2010 Curb Ramp Guidelines published in October

2010 Enhanced 1803 (Prosecution of Work)

provision introduced for 2011 construction season

Standard Plans published and Standard Plate 7036 retired in May 2012

ADA Project Design Guide published in July 2012

Page 3: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.

Pursue early involvement with MnDOT’s ADA Operations Unit

ADA Project Design Guide required for all projects in MnDOT right-of-way

Plan and estimate for the right fix in the scope of work

Think outside the box

Page 4: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.

Field walk required for all projects

Page 5: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.
Page 6: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.
Page 7: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.
Page 8: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.

Use Project Design Guide Level 1, 2, and 3 guidance to estimate drafting requirements

Estimate at least one-third of design time in the field

Provide at least two weeks for plan reviews

All signals must be APS-ready (i.e. all underground work) at a minimum

Page 9: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.

“If you want different results,

do something different.”

-Anonymous

Page 10: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.
Page 11: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.
Page 12: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.
Page 13: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.
Page 14: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.
Page 15: Todd Grugel, MnDOT ADA Program Engineer.  PROWAG adopted in February 2010  Curb Ramp Guidelines published in October 2010  Enhanced 1803 (Prosecution.