• LOCATION- over the Gulf of Corinth, Western Located over the Gulf of Corinth, Western Greecee
total length 2 880.400 m deckdeck depth 2.82 m span lengths 286 m - 3 x 560 m - 286 m pylons pylon height (above deck) 113.00 mdeck width 27 .20 m girder depth 2.7m main bridgemain span 560 m
cost of construction -----Euro 630 000 000
deck composite steel-reinforced concrete piers reinforced concrete Materials
This project quite complex:• large water depth (up to 65 m) • deep soil strata of weak alluviums• a strong seismic activity• possible tectonic movements
Concept
• Hanger• Pepsi bottele• Sprinlke system• Chimney
1 Logic
• Silty clay -liqufiction-
• Quick sand condition—Japan earthquake
• Concept used – Vital grass root (7m long)
2. Logic
Topling • Each pier moves freely
3. Logic
• Deck movement in earthquake zoneDeck free to moveViscus damfer- control the movement Control the movement – Sprinkling –(60-68*C)Pepsi bottel
4.Logic
• Cables 1997- wind effect Chimney – helical strips
SILT CLAY SOLUTIONLIQUIFICATION
USE THE NEW CONCEPT & DEVELOP
THE ENGINEERING
• `