YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: Site Photos to 2015 09 10

Unloading: Internal checking 7 UP pumps

Site Photos

Page 2: Site Photos to 2015 09 10

Unloading: Official inspection 7 UP pumps

Page 3: Site Photos to 2015 09 10

Clear punch list: Clean the granite for Electrical building

Page 4: Site Photos to 2015 09 10

Clear punch list: Clean the granite for Control building

Page 5: Site Photos to 2015 09 10

Clearance the Asphalt road Entrance Jetstar

Page 6: Site Photos to 2015 09 10

Clear punch list: Install Emergency light for Fire building

Page 7: Site Photos to 2015 09 10

Clear punch list: Painting work for Fence behind Control building

Site photo: Flower bed Near Air port check point at Plot 4

Page 8: Site Photos to 2015 09 10

Technical pad: Drain off Low point drain

Page 9: Site Photos to 2015 09 10

Plot 2: Drain off Low point drain

Page 10: Site Photos to 2015 09 10

Testing and Commissioning for CCTV system

Page 11: Site Photos to 2015 09 10

Testing and Commissioning for CCTV system

Page 12: Site Photos to 2015 09 10

Clear punch list: Re-paint for handrail of Unloading platform

Page 13: Site Photos to 2015 09 10

Testing and Commissioning for CCTV system

Page 14: Site Photos to 2015 09 10

Clear punch list: Clearance and Repair surface of UP pump at Technical pad


Related Documents