-1-
Request for QualificationsPhase 2A Alignment
Design-Build-Finance Project
Presentation
• Foothill Extension• Phase 2A – Pasadena to Azusa
– Projects– Schedules– Alignment Scope of Work
• Funding and Financing• Procurement and Evaluation• Q&A
Completing the Vision
The Completed Metro Gold Line:Connecting Los Angeles, the San Gabriel Valley
and the Inland Empire
Metrolink
COVINA
WEST COVINA
BALDWIN PARK
Phase 2A: Pasadena to Azusa
- Phase 2A (Pasadena to Azusa) – 11.4 Miles, 5 Cities, 6 Stations- Fully Funded through Measure R - $810 million
(amount approximate, due to fluctuation in Measure R revenue estimates)
Phase 2B: Azusa to Montclair
- Azusa to Montclair – 12.5 Miles, 6 Cities, 6 Stations- Partially Funded through Measure R (Residual from Phase 2A)
Phase 2C: Ontario Airport Extension
- Montclair to LA/Ontario International Airport – Approx. 8 Miles- Unfunded
Phase 2A – Pasadena to Azusa
Phase 2A Projects
Metrolink
San Dimas is currently assessing station options
COVINA
WEST COVINA
BALDWIN PARK
Phase 2A Alignment
Iconic Freeway Structure
Phase 2A comprises three design-build project packages:Package 1 - Iconic Freeway StructurePackage 2 - Phase 2A Alignment (11.4 miles)Package 3 – Parking Structures
Phase 2A Packages
• Package 1: Iconic Freeway Structure over I-210 (approx. 584 linear feet)
• Package 2: Phase 2A Alignment, includes: Rail Track Alignment, Bridges, Crossings, Stations, Utilities, Systems, Signals (and related items), as well as a Maintenance & Operations Facility
• Package 3: Two multi-level parking structures in Arcadia and Azusa/Citrus
Milestones 7/09 12/09 1/10 3/10 6/10 9/10 4/11 12/13 12/14
Master Cooperative Agreement – Metro
Fund Transfer Agreement –Metro
Railroad Relocation Agreement – Metro & BNSF
M&O Facility Specific Plan Amended
M&O Property Acquisition
IFS Groundbreaking
Alignment Groundbreaking
M&O Facility Construction
Phase 2A ConstructionCompletion
Phase 2A Project Schedule
As of 2/05/10
Project schedules are based on timely completion of agreements between the Construction Authority and Metro.
Part 1 - 25 mos / Part 2 - 13 mos
14 Months
Package 1: Iconic Freeway Structure
Iconic Freeway Structure (IFS)
Package 1 – IFS Procurement Schedule
1/10 – 11/10
3/10
4/09
6/10
10/10
11/10
12/10 – 8/13
The IFS is on-schedule to break ground June 2010.
Milestones Aug 09 Dec 09 Mar 10 Jun 10 Sept 10 Dec 10 Mar 11 Jun 11 Sept 11 Dec 11 Mar 12 Jun 12
Design-Build Procurement: Package 1
Issue RFQ
Pre-Qualified List of DB Contractors Approved
Issue RFP
Proposals Due
Contract Award
Design and Construction
8/09 – 6/10
10/09
11/09
1/10
3/10
5/10
6/10 – 5/12
Package 2: Phase 2A Alignment
Pasadena
Duarte
Monrovia
Sierra Madre
Arcadia
Irwindale
Azusa
Glendora
Package 2 includes: Rail Track Alignment, Bridges, Crossings, Stations, Utilities, Systems, Signals, and Maintenance & Operations Facility.
Package 2 - Procurement Schedule
Milestones Aug 09 Dec 09 Mar 10 Jun 10 Sep 10 Dec 10 Mar 11 Jun 11 Sept 11 Dec 11 Sep 13 Dec 13
Design-Build Procurement: Package 2
Issue RFQ
SOQ Due
Issue RFP
Proposals Due
Contract Award
Design and Construction
Phase 2A Construction Completion
1/10 – 11/10
1/10
2/10
4/10
7/10
9/10
9/10 – 8/13
12/13
Package 2: Scope of Work
• Double LRT MainlineGradingRetaining/MSE & Sound WallsTrackwork/Special TrackworkI-210 Barrier Rail ReplacementGrade Crossings
• Freight Track RealignmentGradingRetaining & Sound WallsTrackwork/Special TrackworkGrade Crossings
Scope of Work (cont.)
• Bridges (15)Completely New BridgesSeismic Upgrades on Ex. SubstructuresMix of Rehab/New Superstructures
• Stations (6)FoundationPlatform StructuresPlatform FinishesCanopiesWalkwaysEquipment & Facilities
• Landscaping/Irrigation
Scope of Work (cont.)• Maintenance &Operations
Facility (M&O)Storage for 84 LR vehiclesRepair Shop BuildingPaint Shop BuildingLRT Carwash Cleaning PlatformMOW BuildingTPSSOffice / Shops space
• Systems (Mainline + M&O)Traction PowerOCSCommunications (LRT & Freight)Signals (LRT & Freight)Corrosion Control
-20-
Funding & Financing
Measure R Funding Availability Schedule
Funding
• Measure R – Commits a minimum of $735 million
for Foothill Extension– Extends the line from Pasadena to
Claremont
• Metro’s Long Range Transportation Plan– Allocates $810 million for Foothill
Extension (2010 – 2019) *– Seeks additional funding sources– Commits to operating Phases 2A &
2B, upon construction completion
• Fund Transfer & Master Cooperative Agreements – Being Negotiated
* Allocation amount approximate, due to fluctuation in Measure R revenue estimates
Financing Phase 2A: Optimizing Measure R
• Measure R provides a dedicated funding stream, starting in 2010
• The Construction Authority plans to optimize those funds and deliver Phase 2A four years ahead of schedule
• The Authority is developing a public-private partnership to accelerate construction ahead of funding
• The public-private partnership will defer payments to design-builder, with interest, pending receipt of Measure R funds
• This plan will allow construction of Phase 2A to be completed in 2013
Measure R Construction-Related Funding (Fiscal Years 2010-2019)
-24-
$
Cost to Construct Major Elements
Phase Cost Estimate (ROM)Package 2
Alignment $320 millionM&O Facility $120 million*
Package 2 Total $440 million**(ROM) = Rough Order of Magnitude
* Authority to pay one-third; Metro to pay two-thirds
** Total Project Budget Estimate = $650 million (includes: construction, right-of-way, vehicles, financing, capital improvements, administrative costs(Authority and Metro), mitigation, etc.)
Financing Package 2: Measure R Funding vs. Anticipated Expenses*
Funding Gap
$
* Authority’s portion of anticipated construction-related expenses (Alignment + 1/3 of M&O Facility)
Measure R FundingAnticipated Expenses
-27-
Procurement & Evaluation
Procurement & Evaluation
Two-Step Procurement1. Request for Qualifications → Shortlist2. Request for Proposals → Competitive Range (if
applicable) → AwardRFQ Evaluation Committees
• Four committees: Technical, Legal, Financial, and Staff Recommendation Committee– Technical, Legal, and Financial Committees evaluate SOQs– Staff Recommendation Committee summarizes results for CEO
and report to Board of Directors• Committees comprise representatives from Metro,
Caltrans, Corridor Cities, and Authority
RFQ Short-listing Process
Evaluation Criteria• Related Project Experience (8 sub-criteria)• Staffing and Organization (6 sub-criteria)• Legal Qualifications (4 sub-criteria)• Financial Qualifications (4 sub-criteria)
Adjectival Ratings• Exceptional, Good, Acceptable, Unacceptable
(Evaluators assess if SOQ meets or exceeds stated objectives / requirements)
• Must receive at least “Acceptable” for all sub-criteria• Must receive at least “Good” for one Evaluation Criteria
Next StepsStep 1: RFQ
Issue RFQ January 28, 2010
Statement of Qualifications Due February 26, 2010
Shortlisted Proposers Announced March 24, 2010
Step 2: RFP
Issue Industry Review Draft RFP March 1, 2010
Peer Review March, 2010
Issue RFP April 21, 2010
Pre-Proposal Conference May 2010
Proposal Due July 12, 2010
Board Authorized Contract Execution September 22, 2010
Voters approve Prop C adding an additional one-half cent sales
tax for countywide transit projects
1990 Atchison Topeka – Santa Fe Right-of-Way Acquired;
Construction begins on Phase I
1994
MTA Suspends Project
due to budget concerns
1998
Construction Authority
formed by SB 1847State legislature
1999
Construction Authorityresumes Construction on Phase I;Groundbreaking for the ChinatownAerial Structure is held June 2000
2000
MTA Board Changesname from
Blue Line to Gold Line
2001
Metro Gold Line Phase 1 (Union Station to Pasadena) Opens
Phase 2A Breaks Ground;
Phase 2B Alternatives Analysis & Draft
EIR/S
2010
Phase 2A Alternatives Analysis Completed
and Draft EIR/S Approved
CPUC Applications/
FTA Cost Verification
Preliminary engineering
scheduled to be completed
2013
Phase 2A Construction Completion
Project Definition Report Adopted
The Journey Continues
Measure R Approved
$735 m (min.);LRTP Adopted
2017
Phase 2B Construction Completed
to Montclair)
20032004
2005
20062007
2008-9
2021
Phase 2C Construction Completed (to
Ontario Airport)
-32-