1.0 SCOPE
This specification shall govern the design, materials procurement, installation and
inspection requirements of Cathodic protection system for the steel pipe used as onshore
pipelines. The Work includes the furnishing all labor, materials, tools and equipment
and the performance of all operations, and incidentals necessary for the design and
installation of the system.
As used in this specification, the following definitions shall apply :
COMPANY - UNOCAL INDONESIA COMPANY
CONTRACTOR - PT. ASRI UTAMA TECHNICAL SERVICES
Cathodic Protection System Designer/Installer
CONTRACTOR shall obtain COMPANY written approval for any deviations fromthe requirements of this specification, applicable standards and referenced drawings.
This document is not intended to be all inclusive, and the use of the guidelines set forth
does not relieve the CONTRACTOR of his responsibility to complete the WORK.
2 0 CODES AND STANDARD
8/3/2019 PtPSI Onshore Pipeline Impressed Current
http://slidepdf.com/reader/full/ptpsi-onshore-pipeline-impressed-current 2/11
2 0 CODES AND STANDARD
3.2 Design Criteria
(a) The proposed of the Cathodic protection system is to protect the steel pipe
from external corrosion due to electrolyte and oxygen present surrounding
the pipe for a period of not less than 20 years.
(b) The Cathodic protection system for this steel pipe shall be an impressed
current type with a deep ground bed anode which
should be compatible with
existing C.P systems and with existing buried structures along the pipe route.
(c) The impressed current shall capable to supply current and DC Voltage
required by the pipe to maintain the potential of the pipe to the soil more
negative than - 850 mV versus copper/copper sulphate (Cu/Cu SO4)
reference cell.
(d) Facilities shall be included to monitor the effective operation of the system.
3.3 Impressed Current Cathodic Protection System
(a) Pipeline to be protected :
Total length : Refer to the drawing attached in the bid
document/contract
Material : API5L X52
8/3/2019 PtPSI Onshore Pipeline Impressed Current
http://slidepdf.com/reader/full/ptpsi-onshore-pipeline-impressed-current 3/11
(c) Anode ( + ) Junction Box :
Enclosure : Cast Aluminum enclosure , with IP 55 minimum rating.
Common DC Bus : Shall be designed to carry 100 Amperes of DC current
continuous , material Copper with Insulation post that
may with stand 2 KV DC test for 2 minutes.
The Terminal lug shall be minimum No: 50 sqmm
Branch Circuits : shall be designed to accommodat
e 10 circuits maximum ,
complete with 50mV/50A DC Shunt for each
circuit and No: 8AWG ( or 10 sqmm ) terminalLugs or equal.
(d) Cathode ( Negative ) Junction Box :
Enclosure : Cast Aluminum enclosure , with IP 55 minimum rating.
Common DC Bus : Shall be designed to carry 100 Amperes of DC current
continuous , material Copper with Insulation post that
may with stand 2 KV DC test for 2 minutes.
The Terminal lug shall be minimum No: 50 sqmm
Branch Circuits : shall be designed to accommodate maximum 5 circuits
complete with 50mV/50A DC Shunt for each
circuit and No: 1/0AWG ( or 50 sqmm ) terminal
Lugs or equal.
( ) DC C bl
8/3/2019 PtPSI Onshore Pipeline Impressed Current
http://slidepdf.com/reader/full/ptpsi-onshore-pipeline-impressed-current 4/11
(g) Transformer Rectifier
Type : Outdoor Type , oil filled with Shell Diala B
transformer Oil , Caltex BSI or equal.
Input voltage : 240 VAC/50 Hz , single phase or otherwise stated in the
detailed Engineering Drawing.
Output voltage : DC , adjustable voltage (coarse and fine)
Current interuptor : Adjustable time set-up
Metering : Analog Ampere meter and Analog DC Voltmeter
Lightning Protection : Both the DC side and the AC side of the Transformer
Rectifier shall be equipped with Surge / Lighting
Protection Overvoltage with minimum capacity as
follows :
- DC side : 100 KA
- AC side : 25 KA.
(h) Current Span Test Station :
Type :
Minimum span :
Requirement :
Wire size :
Four (4) wires per pipeline (see Attachment 2)
200 feet
Two (at both side of rectifier connection)
12 AWG ( or 4 sqmm minimal , single conductor,
d t l d d i l ti ith
8/3/2019 PtPSI Onshore Pipeline Impressed Current
http://slidepdf.com/reader/full/ptpsi-onshore-pipeline-impressed-current 5/11
4.2 Inspection and Approval
During installation of the system, all aspects of the installation process shall be made
available for inspection by COMPANY or its Representative. Any
equipment assembly not meeting the requirements of a this specification or
referenced documents may be rejected. Rejected assemblies are to be
dismantled and reassembled in compliance with the requirements of this
specification at CONTRACTOR expense.
5.0 INSTALLATION OF THE ELECTRICAL CONNECTIONS AND MONITORING
POINTS
5.1 Test Point Station :
One (1) electrical lead wire minimum shall be used for testing , and shall be installed
at every 500 m of pipeline. The size of the lead shall be at least 6 AWG or 25 sqmm
( single standed copper wire with HMWPE , N2XY_CV_XLPE/PVC insulationor equal The installation is to be typically as is shown at Attachment 3.
5.2 Current Spa
n Test Station :
Four (4) electrical lead wires used for corrosion control or current span measurement
shall be installed at each section of the pipeline at the location within COMPANY’s
Ri ht f W ( ROW ) Th i f l d i h ll b t l t 12 AWG 4
8/3/2019 PtPSI Onshore Pipeline Impressed Current
http://slidepdf.com/reader/full/ptpsi-onshore-pipeline-impressed-current 6/11
Cap Brand or equal epoxy encapsulation kit.
5.4 Corrosion Coat Repair
After the leads have been installed, the weld area shall be thoroughly cleaned with a
wire brush. All steel surfaces, including the pipe, bonding plates, etc., exposed for
welding purposes shall be repaired in accordance with General Specification for
Pipeline Corrosion Coating. Damage to the pipe corrosion coat for any reason shall
be repaired in accordance with COMPANY General Specification for Pipeline
Corrosion Coating.
5.5 Inspection and Approval
During installation of the current span and test point leads, all aspects of the
installation process shall be made available for inspection by COMPANY or its
Representative. Any lead assembly not meeting the requirements of this
specification or referenced documents may be rejected. Rejected assemblies are to
be dismantled and reassembled in compliance with the requirements of this
specification at CONTRACTOR expense.
6.0 INSPECTION OF THE CATHODIC PROTECTION SYSTEM
U l ti f th i l i th th di t ti t h ll b i t d d
8/3/2019 PtPSI Onshore Pipeline Impressed Current
http://slidepdf.com/reader/full/ptpsi-onshore-pipeline-impressed-current 7/11
8/3/2019 PtPSI Onshore Pipeline Impressed Current
http://slidepdf.com/reader/full/ptpsi-onshore-pipeline-impressed-current 8/11
UI-GS-OPLCP
2 of 5 Rev. B
8/3/2019 PtPSI Onshore Pipeline Impressed Current
http://slidepdf.com/reader/full/ptpsi-onshore-pipeline-impressed-current 9/11
UI-GS-OPLCP
3 of 5 Rev. B
8/3/2019 PtPSI Onshore Pipeline Impressed Current
http://slidepdf.com/reader/full/ptpsi-onshore-pipeline-impressed-current 10/11
UI-GS-OPLCP
4 of 5 Rev. B
8/3/2019 PtPSI Onshore Pipeline Impressed Current
http://slidepdf.com/reader/full/ptpsi-onshore-pipeline-impressed-current 11/11
UI-GS-OPLCP
5 of 5 Rev. B