YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: ProNova Drilling Performance Services Brochure V3 02
Page 2: ProNova Drilling Performance Services Brochure V3 02
Page 3: ProNova Drilling Performance Services Brochure V3 02
Page 4: ProNova Drilling Performance Services Brochure V3 02
Page 5: ProNova Drilling Performance Services Brochure V3 02
Page 6: ProNova Drilling Performance Services Brochure V3 02
Page 7: ProNova Drilling Performance Services Brochure V3 02
Page 8: ProNova Drilling Performance Services Brochure V3 02

1

Time from stop making hole until resume making hole

8 ½” Hole Phase

KPI: Weight-to-Weight Connection Time

Crew A8

3.0 4.0

minutes

Crew B8

25

Crew C

30

Crew D

A B C D E

Operations Count 28 36 60 93 81

Average Operation Duration [min] 9.0 6.6 5.8 7.7 8.5

Target Operation Duration [min] 5.0 5.0 5.0 5.0 5.0

Potential Saving [min] 111 56 49 255 284

Potential Saving [%]

44.3%

23.7%

14.0%

35.4%

41.2%

20

Crew E

Page 9: ProNova Drilling Performance Services Brochure V3 02

Statistical Analysis Overview

Savings Potential Summary

Time analysed by proNova 61 days

Total Savings Potential (incl. 10% of Drilling Stand Time) 7.6 days

KPI

Slip to Slip Time Moving Time

Weight to Weight Drilling Stand*

Tripping Casing/Liner Tripping Casing/Liner

Phase All 16“ 12 ¼“ 8 ½“ All 16“ 12 ¼“ 8 ½“ 16“ 12 ¼“ 8 ½“ 16“ 12 ¼“ 8 ½“

Lower Cut-Off [min] 0.5 0.5 0.5 0.5 0.25 0.5 0.5 0.5 10 10 10 0 0 0

Upper Cut-Off [min] 10 30 30 30 10 30 30 30 90 90 90 300 300 300

Benchmark [min] 1.15 3.86 1.82 5.12 0.55 1.57 1.04 1.03 25.32 12.78 19.92 42.07 31.10 91.71

Savings Potential [h] 60.1 5.7 14.9 1.4 36.7 5.6 6.3 0.9 23.0 10.1 9.1 55.2* 12.2* 21.8*

Savings Potential [%] 60.73 37.06 71.91 37.68 66.98 59.49 63.20 68.73 37.66 42.25 35.05 47.94* 25.83* 22.26*

* only 10% are included fortotal savings potential

Page 10: ProNova Drilling Performance Services Brochure V3 02

Automatic Daily Breakdown per Hour