Magicsoft Asia night
PROJECT : Confirmed
WORK AT HEIGHT ON SUSPENDED SCAFFOLD (GONDOLA) PERMIT Permit No. : AAG-PTW-WH_GND-18-00007
Part 1: Application Validity Period (Date & Time of work) : From: 10/08/2018 (Date) 19:00 (Time) To: 11/08/2018 (Date) 07:00 (Time)
Contractor : Magicsoft Asia LP No. : test
Description of work : test LP Expiry Date : 02/01/2019
Daily Check By Work Supervisor-In-Charge and/or Safety Assessor (Yes, No, “NA“ for Not Applicable)
Minimum Safety Requirements
Approved Risk Assessments available NA
Safe Work Procedures available Yes
Job Specific Fall Prevention Plan available Yes
PTW/ Location Plan displayed at place of work Yes
Workers are briefed on the hazards & corresponding control measures Yes
Workers are medically fit to work/ not feeling unwell/ not overworked Yes
Workers are reminded to do Last Minute Risk Assessment (LMRA) before start work Yes
Adequate safe means of access/ egress provided. Yes
Adequate lighting provided at workplaces & along access/ egress Yes
Safety harness with double lanyard & shock absorber provided Yes
Monthly Inspection & colour coding of PPE implemented Yes
LP certificate valid for 6 months Yes
Buddy system implemented ie. at least 2 workers/ team Yes
PE design calculations & drawing available/ displayed Yes
PE certificate of supervision available/ displayed Yes
Competent operator appointed & name list with photo displayed Yes
Pre-operation check carried out by authorised operator Yes
Independent lifeline provided Yes
Comply with safe working load; no overloading of platform Yes
Barricades and signages provided below; area clear of incompatible works Yes
Good housekeeping maintained - no storage of unused materials/ debris on platform Yes
Competent Personnel appointed to carry out installation etc Yes
Competent Supervisor appointed & present during installation etc Yes
Inspection of work area after inclement weather - safe to work after inclement weather Yes
Others :
Part 2: Check & Endorsement
a) I have read & understood this permit & agree to work in accordance with the provisions of the RA/ SWP/ Method Statement & the safety requirements stated in this permit.
b) I have checked the site & satisfied that reasonably practicable steps will or have been taken to safeguard the safety & health of the persons working & in the vicinity
a. Applicant/ Work Supervisor (Work atHeight Supervisor)
Name Applicant
Signature
Time 11:58
b. Safety Assessor (Shimizu) (WSHO/ WAHAssessor)
Name Safety Assessor
Signature
Time 12:27
c. Shimizu Engineer/ Supervisor In-Charge(Work at Height Supervisor)
Name Engineer
Signature
Time 12:27
Part 3: Issued By
a) I am satisfied that proper evaluation of risk & hazards involved based on available information b) I am satisfied that no incompatible works will be carried out e.g no concurrent activities@ same elevation, etc
c) I am satisfied that all reasonably practicable measures will or have been implemented & enforced d) The working personnel are informed of the hazards & protection counter measures to betaken
Site Overall In-Charge (SC PM / WAHManager/ Manger with CSCPM Certificate)
Name PM
Signature
Time 12:27
Part 4: Notice of Revocation or Closure
a) Work has been terminated/ completed b) Housekeeping has been carried out c) Work area is safe for other personnel
Applicant/ Work Supervisor (Work atHeight Supervisor)
Name Applicant
Signature
Time 12:27
Part 5: Confirmation of Revocation or Closure
a) Work has been terminated/ completed b) Housekeeping has been carried out c) Work area is safe for other personnel
Site Overall In-Charge (SC PM / WAHManager/ Manger with CSCPM Certificate)
Name PM
Signature
Time 12:28
Photo Attachment
Adequate safe means of access/ egress provided. Competent operator appointed & name list with photo displayed
Barricades and signages provided below; area clear of incompatibleworks
Good housekeeping maintained - no storage of unused materials/debris on platform