YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: Poster VHM Omkarehwar

Electrifying India

The excecution of the 520 MW hydroelectrical power plant Omkareshwar has set unmatched standards in India. Commissioned in a record time of 48 months, the project was awarded the prestigious Gold Shield for early commissioning by the Ministry of Power, Government of India. Voith combines experience with innovation in delive-ring hydropower projects in a sustainable way.

With more than 140 years experience in the field of hydropower and high annual spending for R&D, Voith is well equipped to deliver state of the art technology for hydropower projects around the globe.

Recent orders for hydropower projects in India include:

• Bhasmey 2 x 27 MW (Customer: Gati Infrastructure Bhasmey Power Pvt. Ltd.)• SingoliBhatwari 3 x 33 MW (Customer: L&T Uttaranchal Hydro Power Ltd.)• Sainj 2 x 50 MW (Customer: Himachal Pradesh

Power Corporation Ltd.)• Rongnichu 2 x 48 MW (Customer: Madhya Bharat

Power Corporation Ltd.)• Baglihar-II 3 X 150 MW (Customer: J&K State Power Development Corporation Ltd.)• Kakobola 3 x 3.5 MW (Customer: Angelique International Ltd.) • BhyunderGanga 2x12.15 MW (Customer: Super

Hydro Electric Pvt. Ltd.)• Dakter 1 2x1.8 MW (Customer: Phu Thinh Kon

Tum Joint Stock Company, Vietnam)

Voith Hydro Pvt. Ltd.A-20 & 21, Sector-59, Noida — 201 301 (UP/India)Tel. +91 120307 4242Fax +91 120307 4243email: [email protected]

www.voith.com

A Voith and Siemens Company

Related Documents