work experience
work experience1
qpk design
1991
Entrance / Egress Corridor
Egress Corridor
1991 D A
T E
R E V I S I O N
S
P R
O J E C
T N O
.
SUCH ALTERATIO
N, AN
D A SPECIFIC D
ESCRIPTION
OF TH
E ALTERATION
.NOTATIO
N 'ALTERED BY' FOLLO
WED BY HIS SIGNATURE AND THE DATE O
FIF ALTERED, THE ALTERING ARCHITECT SHALL AFFIX HIS SEAL AND
THEDIRECTION OF A LICENSED ARCHITECT, TO ALTER THIS DOCUM
ENT IN ANY WAY.
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE
1991
1ST FLOOR PLAN
BASEMENT FLOOR PLAN
Salin
a Stre
et
Bank
Alle
y
Basement - No Storage Use
UP
UP
UP DN
UP DN
RETAIL SPACE TENANT PARKING
(7) CARS1
2
3 4 5 6 7
(1,190 SF)
(3,480 SF)
3-5'' Concrete Overlay Slab
(6,338 SF)
(5,647 SF)
N
RETAIL AND HOUSING
317 - 319 SOUTH SALINA STREET
CONCEPT DEVELOPMENT
SK-3
April 4 2006
DW
2ND - 5TH FLOOR PLAN
Kitchen
Study
Living Area
Closet
Bath
Closet
Dining
DN
UP
DN
UP
UNIT 'A' TYPICAL UNIT 'B' TYPICAL
Study/Bedroom
DW
Kitchen
Living Area
DiningBedroom
(5,266 SF)
1100 SF 1175 SF
8 TYPE 'A' UNITS
8 TYPE 'B' UNITS
DW
Kitchen
Living Area
DW
Living Area
Bedroom
Study
Study
Closet
Bath
Roof
Bel
ow
199119911991 SK-1
Electrical MEP
C.I.P Foundation
C.I.P Foundation
Raised Pit10'' C.I.P Walls to First Floor
Check Wall Type, Thicknessand Condition
- Where are Utility Entrances?
- Sprinkler Headand Equiptment
Check Fire Rating ofColumn Enclosures
Floor of Bldg Above
C.I.P Foundation
Acheiving Pitch for Draining and Floor Drains is Necessary.
Existing Wood Framing. Requires Engineering.
2 HR Construction
Mailboxes
2 HR Ceiling Required
Toilet Room
2 Story Space PotentialConnect to Basementvia Internal Stair?
Tenant Fit Up
2 HR Construction
2 HR Ceiling Required
Curb
Side
wal
k with
Bas
emen
t Bel
ow
Hist
oric
Rest
orat
ion
Stor
e Fr
ont?
Cem
ent B
oard
, Wai
nsco
tt an
d Bu
lkhe
ad
Slope
Slop
eSl
ope
Slope
Drain
New Concrete Apron
Motorized OverheadDoor. 10'X10'
New Concrete
Apron
Louver
Need Spot Elevationof Bank Alley to 1stFloor Elevation
Existing (3) Wythe Brick Partywall12'' Nominal Width
Existing (3) Wythe Brick Partywall
12'' Nominal Width
- Joist Direction: Assumed Running N-S
Need Floor to Floor Heights
Bath
Dining
WD
WD
Bath
Unit Electrical Panel Location?
Suspended Lay in Celing
Re-Circulation Hood Only
Supply BelowSAN. to Wet Wall
9 1/4" Wet Wall
Bedroom
BedroomSAN.
Plumbing and Supply Riser Furnace
Hot Water Heater
(1) Stair (either) to Roof TopPenthouse (Equiptment Maintenance)
Sprinkler Riser
Penthouse for Overrun SpaceHouse BeamHatch = 3% Shaft Area
Electrical RisersCur. M.J. Air Chase
Floor Panel
WD
WD
FurnaceHot Water Heater
Accoustical Wall (Typ.)
KitchenDining
Exhaust
SAN.Exhaust
9'-0"
10'-6" or 11'-0"Check Ceiling Height
Floors 2 and 3
Roof Plan- RTU's
- Vents- Hatches- Curb- Roof Equiptment- Railing Enclosure
Garage Air Handling Equiptment
Hydraulic Elevator MachineRoom
- MDC Would Like to PursueCentral Domestic H.W Tankwith Recirculating Distribution
Scale: 1/8" = 1'-0"
Scale: 1/8" = 1'-0"
Scale: 1/8" = 1'-0"
work experience2
AUsTin design
work experience3
MeRRiLL BARn