GSPublisherVersion 168.45.68.100
AMENDMENT DETAILSREV BY DATE
PROJECT NUMBER DRAWING NUMBER
DATE DRAWN SHEET SIZE
CHECK
DESIGNED
DRAWN
DRAWING TITLE
CLIENT DETAILS
PROJECT DETAILS
PROJECT STAGE
Planning Approval
New Home69 Forrest Street MountLawley Perth WA 6050
BJ & Swee Poortman
HH17-039
GH
GH
HH
24-Apr-18 A3
A.01.1
Perspectives
© COPYRIGHT HOWES & HOMES DESIGNSREPRODUCTION OF THE WHOLE OR PART OF THE DOCUMENT CONSTITUTES AND INFRINGESCOPYRIGHT. THE INFORMATION, IDEAS AND CONCEPTS CONTAINED IN THIS DOCUMENT IS /
ARE CONFIDENTIAL. THE RECIPIENT(S) OF THIS DOCUMENT IS / ARE PROHIBITED FROMDISCLOSING SUCH INFORMATION IDEAS AND CONCEPTS TO ANY PERSON WITHOUT PRIOR
WRITTEN CONSENT OF THE COPYRIGHT HOLDER.CONTRACTOR TO CHECK AND VERIFY ALL LEVELS, DATUMS & DIMENSIONS ON SITE ANDSHALL REPORT ANY DISCREPANCIES OR OMISSIONS TO THIS OFFICE PRIOR TO START OF
WORK & DURING THE CONSTRUCTION PHASE. THIS DRAWING IS TO BE READ ANDUNDERSTOOD IN CONJUNCTION WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND OR ANY
OTHER CONSULTANT/S DOCUMENTATION AS MAY BE APPLICABLE TO THE PROJECT PRIORTO START OF WORK & IT'S DURATION. MEASUREMENT SCALING OF THIS DRAWING SHALL
ONLY BE PERMITTED IN IT'S DIGITAL FORM.
2017
0424 420 [email protected]
PRELIMINARY DESIGN ISSUED01 GH 16.11.2017
REVISED PRELIMINARY DESIGN ISSUED02 GH 13.12.2017
03 GH 01.02.2018
PLANNING APPROVAL DRAWINGS ISSUED04 GH 16.02.2018
REVISED PRELIMINARY DESIGN ISSUED
REVISED PLANNING APPROVAL DRAWINGS ISSUED05 GH 21.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED06 GH 17.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED07 GH 20.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED08 GH 24.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED09 GH 24.04.2018
PLANNING APPROVAL SUBMISSION
PROPOSED RESIDENCE TO:LOT 1 / #69 FORREST STREET, MOUNT LAWLEY, WA 6050
GSPublisherVersion 168.45.68.100
NORTH
PRELIMINARY DESIGN ISSUED01 GH 16.11.2017
AMENDMENT DETAILSREV BY DATE
PROJECT NUMBER DRAWING NUMBER
DATE DRAWN SHEET SIZE
CHECK
DESIGNED
DRAWN
DRAWING TITLE
CLIENT DETAILS
PROJECT DETAILS
PROJECT STAGE
Planning Approval
New Home69 Forrest Street MountLawley Perth WA 6050
BJ & Swee Poortman
HH17-039
GH
GH
HH
24-Apr-18 A3
A.02.1
Location Plan
© COPYRIGHT HOWES & HOMES DESIGNSREPRODUCTION OF THE WHOLE OR PART OF THE DOCUMENT CONSTITUTES AND INFRINGESCOPYRIGHT. THE INFORMATION, IDEAS AND CONCEPTS CONTAINED IN THIS DOCUMENT IS /
ARE CONFIDENTIAL. THE RECIPIENT(S) OF THIS DOCUMENT IS / ARE PROHIBITED FROMDISCLOSING SUCH INFORMATION IDEAS AND CONCEPTS TO ANY PERSON WITHOUT PRIOR
WRITTEN CONSENT OF THE COPYRIGHT HOLDER.CONTRACTOR TO CHECK AND VERIFY ALL LEVELS, DATUMS & DIMENSIONS ON SITE ANDSHALL REPORT ANY DISCREPANCIES OR OMISSIONS TO THIS OFFICE PRIOR TO START OF
WORK & DURING THE CONSTRUCTION PHASE. THIS DRAWING IS TO BE READ ANDUNDERSTOOD IN CONJUNCTION WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND OR ANY
OTHER CONSULTANT/S DOCUMENTATION AS MAY BE APPLICABLE TO THE PROJECT PRIORTO START OF WORK & IT'S DURATION. MEASUREMENT SCALING OF THIS DRAWING SHALL
ONLY BE PERMITTED IN IT'S DIGITAL FORM.
2017
0424 420 [email protected]
REVISED PRELIMINARY DESIGN ISSUED02 GH 13.12.2017
03 GH 01.02.2018
PLANNING APPROVAL DRAWINGS ISSUED04 GH 16.02.2018
REVISED PRELIMINARY DESIGN ISSUED
REVISED PLANNING APPROVAL DRAWINGS ISSUED05 GH 21.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED06 GH 17.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED07 GH 20.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED08 GH 24.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED09 GH 24.04.2018
Not to Scale
GSPublisherVersion 168.45.68.100
NORTH
AMENDMENT DETAILSREV BY DATE
PROJECT NUMBER DRAWING NUMBER
DATE DRAWN SHEET SIZE
CHECK
DESIGNED
DRAWN
DRAWING TITLE
CLIENT DETAILS
PROJECT DETAILS
PROJECT STAGE
Planning Approval
New Home69 Forrest Street MountLawley Perth WA 6050
BJ & Swee Poortman
HH17-039
GH
GH
HH
24-Apr-18 A3
A.02.2Site Plan
© COPYRIGHT HOWES AND HOMES DESIGNSREPRODUCTION OF THE WHOLE OR PART OF THE DOCUMENT CONSTITUTES AND
INFRINGES COPYRIGHT. THE INFORMATION, IDEAS AND CONCEPTS CONTAINED IN THISDOCUMENT IS / ARE CONFIDENTIAL. THE RECIPIENT(S) OF THIS DOCUMENT IS / ARE
PROHIBITED FROM DISCLOSING SUCH INFORMATION IDEAS AND CONCEPTS TO ANYPERSON WITHOUT PRIOR WRITTEN CONSENT OF THE COPYRIGHT HOLDER.
CONTRACTOR TO CHECK AND VERIFY ALL LEVELS, DATUMS & DIMENSIONS ON SITE ANDSHALL REPORT ANY DISCREPANCIES OR OMISSIONS TO THIS OFFICE PRIOR TO START OF
WORK & DURING THE CONSTRUCTION PHASE. THIS DRAWING IS TO BE READ ANDUNDERSTOOD IN CONJUNCTION WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND ORANY OTHER CONSULTANT/S DOCUMENTATION AS MAY BE APPLICABLE TO THE PROJECT
PRIOR TO START OF WORK & IT'S DURATION. MEASUREMENT SCALING OF THISDRAWING SHALL ONLY BE PERMITTED IN IT'S DIGITAL FORM.
2017
PRELIMINARY DESIGN ISSUED01 GH 16.11.2017
REVISED PRELIMINARY DESIGN ISSUED02 GH 13.12.2017
REVISED PRELIMINARY DESIGN ISSUED03 GH 01.01.2018
PLANNING APPROVAL ISSUED04 GH 16.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED05 GH 21.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED06 GH 17.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED07 GH 20.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED08 GH 24.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED09 GH 24.04.2018
Concrete Path
Kerb
Kerb
FORREST STREET
TelstraPit
Wooden fence
BrickChimney
Parapet Wall
Parapet Wall
Fibro fence
ColorbondFence
ColorbondFence
Col
orbo
ndFe
nce
10.053
24.
072
10.052
24.12
Lot 259Lot 33
TBM = Nail in BitRL = 25.95
25.5
26.10
26.0325.85
25.78
25.77
25.9425.84
25.8825.9326.01
26.0225.95
26.07
26.05
26.08
25.91
25.95
25.3525.3425.35
25.94
25.94
26.00
36.61 m2
9.74 m2
9.60 m2
2,012
1,512
30mm min.
4,00
0mm
1,100
3,50
0mm
1,274 4,500ProposedCrossover
780
2,130mm
93.46 m2
89.96 m2
10.08 m2
Combination M/Box
Top of new retaining wall (TOW) @ RL 26.00
Top of new retaining wall (TOW) @ RL 25.85
Bottom of new retaining wall (BOW) @ RL 25.35Bottom of new retaining wall (BOW) @ RL 25.37
Top of new retaining wall (TOW) @ RL 26.00
Top of new retaining wall (TOW) @ RL 25.85
Ground FloorFFL @ 26.10/ 0c
C'Yard
GarageFFL @ 26.10/ 0c
Patio
First FloorFFL @ 29.51
Balcony
LOT 1242m2
LOT 2265m2
T o B o u n d a r ymm
T o B o u n d a r ymm
T o B o u n d a r y
GF
to B
ound
ary
UF
to B
ound
ary
mmT o B o u n d a r y
FFL @ 29.40
Driveway
T o B o u n d a r y
L/Box
Tree
89°43'26"
90°16
'29"
89°59'56" 90°00
'9"
25.85
25.71
25.55
25.52
25.77
25.95
25.37
25.77
25.75
25.64
25.51
25.35
25.37
25.44
25.6325
.77
25.84
25.41
Site Planscale: 1:200
ZoningFloor plan AreaGF House areaGaragePatioCourtyard
UF House areaBalcony
Lot AreaBuilding AreaSite Coverage %Open Space%
SITE INFORMATIONR40
93.46m²36.61m²9.74m²9.60m²
89.86m²10.08m²
242m²130.07m²
53.80%46.20%
GSPublisherVersion 168.45.68.100
NORTH
AMENDMENT DETAILSREV BY DATE
PROJECT NUMBER DRAWING NUMBER
DATE DRAWN SHEET SIZE
CHECK
DESIGNED
DRAWN
DRAWING TITLE
CLIENT DETAILS
PROJECT DETAILS
PROJECT STAGE
Planning Approval
New Home69 Forrest Street MountLawley Perth WA 6050
BJ & Swee Poortman
HH17-039
GH
GH
HH
24-Apr-18 A3
A.03.1Shadow Diagram
© COPYRIGHT HOWES AND HOMES DESIGNSREPRODUCTION OF THE WHOLE OR PART OF THE DOCUMENT CONSTITUTES AND
INFRINGES COPYRIGHT. THE INFORMATION, IDEAS AND CONCEPTS CONTAINED IN THISDOCUMENT IS / ARE CONFIDENTIAL. THE RECIPIENT(S) OF THIS DOCUMENT IS / ARE
PROHIBITED FROM DISCLOSING SUCH INFORMATION IDEAS AND CONCEPTS TO ANYPERSON WITHOUT PRIOR WRITTEN CONSENT OF THE COPYRIGHT HOLDER.
CONTRACTOR TO CHECK AND VERIFY ALL LEVELS, DATUMS & DIMENSIONS ON SITE ANDSHALL REPORT ANY DISCREPANCIES OR OMISSIONS TO THIS OFFICE PRIOR TO START OF
WORK & DURING THE CONSTRUCTION PHASE. THIS DRAWING IS TO BE READ ANDUNDERSTOOD IN CONJUNCTION WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND ORANY OTHER CONSULTANT/S DOCUMENTATION AS MAY BE APPLICABLE TO THE PROJECT
PRIOR TO START OF WORK & IT'S DURATION. MEASUREMENT SCALING OF THISDRAWING SHALL ONLY BE PERMITTED IN IT'S DIGITAL FORM.
2017
PRELIMINARY DESIGN ISSUED01 GH 16.11.2017
REVISED PRELIMINARY DESIGN ISSUED02 GH 13.12.2017
REVISED PRELIMINARY DESIGN ISSUED03 GH 01.01.2018
PLANNING APPROVAL ISSUED04 GH 16.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED05 GH 21.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED06 GH 17.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED07 GH 20.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED08 GH 24.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED09 GH 24.04.2018
36.61 m2
9.74 m2
9.60 m2
93.46 m2
35.78 m2
21st June 12pmOvershadowing Calcs:35.78/265 = 13.50%
LOT 2265m2
Shadow Diagram 12pmscale: 1:200
PATHOF SUN
GSPublisherVersion 168.45.68.100
NORTH
AMENDMENT DETAILSREV BY DATE
PROJECT NUMBER DRAWING NUMBER
DATE DRAWN SHEET SIZE
CHECK
DESIGNED
DRAWN
DRAWING TITLE
CLIENT DETAILS
PROJECT DETAILS
PROJECT STAGE
Planning Approval
New Home69 Forrest Street MountLawley Perth WA 6050
BJ & Swee Poortman
HH17-039
GH
GH
HH
24-Apr-18 A3
A.04.1Ground Floor plan
© COPYRIGHT HOWES AND HOMES DESIGNSREPRODUCTION OF THE WHOLE OR PART OF THE DOCUMENT CONSTITUTES AND
INFRINGES COPYRIGHT. THE INFORMATION, IDEAS AND CONCEPTS CONTAINED IN THISDOCUMENT IS / ARE CONFIDENTIAL. THE RECIPIENT(S) OF THIS DOCUMENT IS / ARE
PROHIBITED FROM DISCLOSING SUCH INFORMATION IDEAS AND CONCEPTS TO ANYPERSON WITHOUT PRIOR WRITTEN CONSENT OF THE COPYRIGHT HOLDER.
CONTRACTOR TO CHECK AND VERIFY ALL LEVELS, DATUMS & DIMENSIONS ON SITE ANDSHALL REPORT ANY DISCREPANCIES OR OMISSIONS TO THIS OFFICE PRIOR TO START OF
WORK & DURING THE CONSTRUCTION PHASE. THIS DRAWING IS TO BE READ ANDUNDERSTOOD IN CONJUNCTION WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND ORANY OTHER CONSULTANT/S DOCUMENTATION AS MAY BE APPLICABLE TO THE PROJECT
PRIOR TO START OF WORK & IT'S DURATION. MEASUREMENT SCALING OF THISDRAWING SHALL ONLY BE PERMITTED IN IT'S DIGITAL FORM.
2017
PRELIMINARY DESIGN ISSUED01 GH 16.11.2017
REVISED PRELIMINARY DESIGN ISSUED02 GH 13.12.2017
REVISED PRELIMINARY DESIGN ISSUED03 GH 01.01.2018
PLANNING APPROVAL ISSUED04 GH 16.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED05 GH 21.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED06 GH 17.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED07 GH 20.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED08 GH 24.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED09 GH 24.04.2018
2400
x301
0 SD
2400x 850 A
600x 900 A
2400
x301
0 SD
600x 900 F
1600
x301
0 A
2400
x 73
0 F
943
x265
0 A
943x1810 F
1457x 610 F 1457x 610 F
820
1210
920
920
S/D
920
920
1,50
04,
550
8,12
44,
846
2,520 5,990
4,00
09,
470
4,57
03,
940
1,04
0
1,512 510 2,000 6,000
Garage
L'dry
Living
Bath
Patio
W/M
EntryPorch
C'yard
Rec
ycle
d br
ick
wal
l @ 1
800h
AG
L
Lounge
Exposed Agg.Sh
elvi
ng
L/Box
Stairs
Dining
DrivewayExposed Agg.
Exposed Agg.
Up1 2 3 4 5 6 7 8 9 101112131415 16
17Store under
Wal
l hun
g fe
atur
e sl
ider
Extents of First Floor over
Extents of First Floor over
P/D& DP
18
CH 3000FFL @ 26.10 / 0c
Concrete
Existing Tree
HRV
CH 2700Dr
Ext
ents
of F
irst F
loor
ove
r
Box
Gut
ter
DP
DP
T.O
.W. L
ow R
etai
ning
wal
l
Cup'ds
HRV
CrossoverExposed Agg.
Low Retaining wall
FFL @ 26.00 / -1c
FFL @ 26.00 / -1c
CombinationM/Box
Kitchen
FR
CH 3000FFL @ 26.10 / 0c
Concrete
Bul
khea
d @
270
0
Exposed Agg.FFL @ 26.00 / -1c
Ground Floor Planscale: 1:100
1
43
2
WALL SCHEDULE134mm External Fibre Cement SIP
104mm Internal Fibre Cement SIP
264mm External wall:
- 104mm Fibre Cement SIP (Internal)
- 50mm air gap
- 110mm single leaf recycled bwk. (External)
110mm double leaf recycled bwk.
Single leaf Non-combustable wall
Low wall
GSPublisherVersion 168.45.68.100
NORTH
AMENDMENT DETAILSREV BY DATE
PROJECT NUMBER DRAWING NUMBER
DATE DRAWN SHEET SIZE
CHECK
DESIGNED
DRAWN
DRAWING TITLE
CLIENT DETAILS
PROJECT DETAILS
PROJECT STAGE
Planning Approval
New Home69 Forrest Street MountLawley Perth WA 6050
BJ & Swee Poortman
HH17-039
GH
GH
HH
24-Apr-18 A3
A.04.2First Floor Plan
© COPYRIGHT HOWES AND HOMES DESIGNSREPRODUCTION OF THE WHOLE OR PART OF THE DOCUMENT CONSTITUTES AND
INFRINGES COPYRIGHT. THE INFORMATION, IDEAS AND CONCEPTS CONTAINED IN THISDOCUMENT IS / ARE CONFIDENTIAL. THE RECIPIENT(S) OF THIS DOCUMENT IS / ARE
PROHIBITED FROM DISCLOSING SUCH INFORMATION IDEAS AND CONCEPTS TO ANYPERSON WITHOUT PRIOR WRITTEN CONSENT OF THE COPYRIGHT HOLDER.
CONTRACTOR TO CHECK AND VERIFY ALL LEVELS, DATUMS & DIMENSIONS ON SITE ANDSHALL REPORT ANY DISCREPANCIES OR OMISSIONS TO THIS OFFICE PRIOR TO START OF
WORK & DURING THE CONSTRUCTION PHASE. THIS DRAWING IS TO BE READ ANDUNDERSTOOD IN CONJUNCTION WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND ORANY OTHER CONSULTANT/S DOCUMENTATION AS MAY BE APPLICABLE TO THE PROJECT
PRIOR TO START OF WORK & IT'S DURATION. MEASUREMENT SCALING OF THISDRAWING SHALL ONLY BE PERMITTED IN IT'S DIGITAL FORM.
2017
PRELIMINARY DESIGN ISSUED01 GH 16.11.2017
REVISED PRELIMINARY DESIGN ISSUED02 GH 13.12.2017
REVISED PRELIMINARY DESIGN ISSUED03 GH 01.01.2018
PLANNING APPROVAL ISSUED04 GH 16.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED05 GH 21.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED06 GH 17.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED07 GH 20.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED08 GH 24.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED09 GH 24.04.2018
1900x 730 A 1900x 730 A1900x 730 F
600
x301
0 A
600
x 90
0 F
600
x120
0 A
2143x3010 SD
600
x 90
0 A
600
x301
0 A
2400
x301
0 SD
600
x301
0 A
900w
DH
O
920w
DH
O
DHO
900w DHO
4,00
010
,674
1,543 6,410 2,100
9,97
04,
704
1,542 2,520 4,490 1,500
14,6
74O
/A
8,510O/A
Entertainment
Office
WIREns
Balcony
MasterBedroom
Dn
5 6 7 8 9 101112131415 1617
18
Juliet Balcony
HR
V
FFL @ 29.51410mm Sipformflooring system
Extents of Ground Floor below
Ground Floor Roof below
Gro
und
Floo
r Roo
f bel
ow
Raked ceiling
Eaves Gutter
Ext
ents
of G
roun
d Fl
oor b
elow
Box
Gut
ter
RWH + DP
RWH + DP
DP
Arch
itect
ural
scr
eeni
ng @
165
0 ab
ove
FFL
7.5m C
one o
f visio
n
6m Cone of vision
4.5m Cone of vision 4.5m C
one o
f visi
on
Raked ceiling
Raked ceiling
FFL @ 29.40300mm Sipformflooring system
Eaves Gutter
1600x 730 F 1600x 730 F
KING
First Floor Planscale: 1:100
WALL SCHEDULE138mm External Weathertex SIP
104mm Internal Fibre Cement SIP
Low wall
1
43
2
GSPublisherVersion 168.45.68.100
AMENDMENT DETAILSREV BY DATE
PROJECT NUMBER DRAWING NUMBER
DATE DRAWN SHEET SIZE
CHECK
DESIGNED
DRAWN
DRAWING TITLE
CLIENT DETAILS
PROJECT DETAILS
PROJECT STAGE
Planning Approval
New Home69 Forrest Street MountLawley Perth WA 6050
BJ & Swee Poortman
HH17-039
GH
GH
HH
24-Apr-18 A3
A.05.1Elevations
© COPYRIGHT HOWES AND HOMES DESIGNSREPRODUCTION OF THE WHOLE OR PART OF THE DOCUMENT CONSTITUTES AND
INFRINGES COPYRIGHT. THE INFORMATION, IDEAS AND CONCEPTS CONTAINED IN THISDOCUMENT IS / ARE CONFIDENTIAL. THE RECIPIENT(S) OF THIS DOCUMENT IS / ARE
PROHIBITED FROM DISCLOSING SUCH INFORMATION IDEAS AND CONCEPTS TO ANYPERSON WITHOUT PRIOR WRITTEN CONSENT OF THE COPYRIGHT HOLDER.
CONTRACTOR TO CHECK AND VERIFY ALL LEVELS, DATUMS & DIMENSIONS ON SITE ANDSHALL REPORT ANY DISCREPANCIES OR OMISSIONS TO THIS OFFICE PRIOR TO START OF
WORK & DURING THE CONSTRUCTION PHASE. THIS DRAWING IS TO BE READ ANDUNDERSTOOD IN CONJUNCTION WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND ORANY OTHER CONSULTANT/S DOCUMENTATION AS MAY BE APPLICABLE TO THE PROJECT
PRIOR TO START OF WORK & IT'S DURATION. MEASUREMENT SCALING OF THISDRAWING SHALL ONLY BE PERMITTED IN IT'S DIGITAL FORM.
2017
PRELIMINARY DESIGN ISSUED01 GH 16.11.2017
REVISED PRELIMINARY DESIGN ISSUED02 GH 13.12.2017
REVISED PRELIMINARY DESIGN ISSUED03 GH 01.01.2018
PLANNING APPROVAL ISSUED04 GH 16.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED05 GH 21.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED06 GH 17.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED07 GH 20.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED08 GH 24.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED09 GH 24.04.2018
3,00
041
02,
700
3,61
1Av
erag
e w
all h
eigh
t abo
ve N
GL
3,71
3M
axim
um w
all h
eigh
t abo
ve N
GL
4,10
4M
axim
um w
all h
eigh
t abo
ve N
GL
4,04
5Av
erag
e w
all h
eigh
t abo
ve N
GLCH
CH Boun
dary
FFL @ 26.10 / 0c
FFL @ 29.51
NGL
NGL
Proposed GL
7m max. wall height
Parapet wall Parapet wall
1800 1800
3,00
041
02,
700
Vertical 'woodland grey'mechanically adjustable louvres
Remote Garage door 'woodland grey'
Steel wire balustrade as per NCC req's
Treated timber oak columns and beams
Boun
dary
FFL @ 26.10 / 0c
CH
FFL @ 29.51
CH
Boun
dary
Existing Tree onCrossover
7m max. wall height
ELEVATIONS
Broken white finish
Obscure glazing
Recycled Face brickwork
Weathertex - Paperbark
Glazing
Timber - Oak
Elevation 2scale: 1:100
Elevation 1scale: 1:100
GSPublisherVersion 168.45.68.100
AMENDMENT DETAILSREV BY DATE
PROJECT NUMBER DRAWING NUMBER
DATE DRAWN SHEET SIZE
CHECK
DESIGNED
DRAWN
DRAWING TITLE
CLIENT DETAILS
PROJECT DETAILS
PROJECT STAGE
Planning Approval
New Home69 Forrest Street MountLawley Perth WA 6050
BJ & Swee Poortman
HH17-039
GH
GH
HH
24-Apr-18 A3
A.05.2Elevations
© COPYRIGHT HOWES AND HOMES DESIGNSREPRODUCTION OF THE WHOLE OR PART OF THE DOCUMENT CONSTITUTES AND
INFRINGES COPYRIGHT. THE INFORMATION, IDEAS AND CONCEPTS CONTAINED IN THISDOCUMENT IS / ARE CONFIDENTIAL. THE RECIPIENT(S) OF THIS DOCUMENT IS / ARE
PROHIBITED FROM DISCLOSING SUCH INFORMATION IDEAS AND CONCEPTS TO ANYPERSON WITHOUT PRIOR WRITTEN CONSENT OF THE COPYRIGHT HOLDER.
CONTRACTOR TO CHECK AND VERIFY ALL LEVELS, DATUMS & DIMENSIONS ON SITE ANDSHALL REPORT ANY DISCREPANCIES OR OMISSIONS TO THIS OFFICE PRIOR TO START OF
WORK & DURING THE CONSTRUCTION PHASE. THIS DRAWING IS TO BE READ ANDUNDERSTOOD IN CONJUNCTION WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND ORANY OTHER CONSULTANT/S DOCUMENTATION AS MAY BE APPLICABLE TO THE PROJECT
PRIOR TO START OF WORK & IT'S DURATION. MEASUREMENT SCALING OF THISDRAWING SHALL ONLY BE PERMITTED IN IT'S DIGITAL FORM.
2017
PRELIMINARY DESIGN ISSUED01 GH 16.11.2017
REVISED PRELIMINARY DESIGN ISSUED02 GH 13.12.2017
REVISED PRELIMINARY DESIGN ISSUED03 GH 01.01.2018
PLANNING APPROVAL ISSUED04 GH 16.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED05 GH 21.02.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED06 GH 17.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED07 GH 20.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED08 GH 24.04.2018
REVISED PLANNING APPROVAL DRAWINGS ISSUED09 GH 24.04.2018
3,00
042
02,
700
1,60
0
Fixed architectural screening meshbetween feature beams - Must bea minimum of 75% obscure as perCouncil guidelines
CH
CHBoun
dary
FFL @ 26.10 / 0c
FFL @ 29.51
NGL
7m max. wall height
1800 1800
3,00
042
02,
700
Boun
dary
CH
CH
Boun
dary
FFL @ 26.10 / 0c
FFL @ 29.51
NGL
Proposed GL
7m max. wall heightfrom building line
ELEVATIONS
Broken white finish
Obscure glazing
Recycled Face brickwork
Weathertex - Paperbark
Glazing
Timber - Oak
Elevation 4scale: 1:100
Elevation 3scale: 1:100