N3 VIRGINIA BYPASS
PHASE 2 CONSTRAINTS -
STAGE 1 - OPTION CORRIDORS
19408-BT-GN-XX-DR-C-04306
P01
S2
N.T.S
09/12/2019
UF
UF
RC
TCP01 04/03/2020 UF ISSUED FOR INFORMATION RC TC
Rev. Date
Description
Appr.Chk'dDrawn
Notes
File
N
am
e :
O:\1
9 P
ro
je
cts\1
94
08
- N
3 V
irg
in
ia
B
yp
ass\0
0.W
IP
\D
wg
\1
94
08
-B
T-G
N-X
X-D
R-C
-0
43
06
_S
ta
ge
1_
Op
tio
n_
Co
rrid
ors.d
wg
Unit 14C, N5 Business Park,
Moneen Rd,
Castlebar,
Co. Mayo,
Ireland
Phone: +353 94 906 8950
Email: [email protected]
DO NOT SCALE, use figured dimensions only.
All levels are referred to Ordnance Survey Datum, Malin Head.
This drawing is the property of Barry Transportation. It is a confidential
document and must not be copied, used, or its contents divulged without
prior written consent. This document should not be relied on or used in
circumstances other than those for which it was originally prepared. Barry
Transportation accepts no responsibility for this document to any other
party other than the party by whom it was commissioned.
©Ordnance Survey Ireland. All rights reserved
Licence No. 2020/OSi_NMA_027
Scale at A1:
Date:Reviewed:
Drawn:
Designed:
Approved:
Project Title: Status:
Drawing Title:
Rev:
Drawing No.
R178 BALIEBOROUGH
R 147 KELLS
R 194 GRANARD
R 195 OLDCASTLE
N3 DUBLIN
R 194 MOYNALTY
N3 CAVAN
N3
N3