Page 1: Mary Taylor, Lt. Governor - Ohiochagrin.epa.ohio.gov/edoc/images/DSWNOV20130625/1GC... · John R. Kasich Governor Mary Taylor, Lt. Governor Scott J. Nally, Director June 24, 2013

John R. Kasich GovernorMary Taylor, Lt. GovernorScott J. Nally, Director

June 24, 2013

Mr. Randy TerryLiberty Land Company, LLC6306 Princeton Glendale RoadLiberty Township, OH 45011

RE: Carriage Hill Section 6; NPDES Permit #10004588*AGCompliance Inspection Findings

Dear Mr. Terry:

On Thursday, June 20, 2013, I inspected the Carriage Hill Section 6 site in Liberty Township, Ohio todetermine compliance with the site's NPDES construction site storm water discharge permit. JaredWilson was present during the inspection

Based on my observations, there were no obvious violations of the project's storm water dischargepermit. I did review the sites storm water pollution prevention plan (SWP3) before my inspection. Theinspection logs I requested to see during my inspection were not presented. Records of weeklyinspections of the erosion control BMPs are required to be kept on site.

All best management practices seem to be working efficiently at this point. Just as a recommendation,proper maintenance of silt fence and removal of accumulated sediment will reduce the maintenance ofstorm sewers and other underground piping systems that lead to the sediment ponds.

Please provide a copy of the site's SWP3 to this office for review, along with copies of sediment controlinspection logs kept since the project started. This information must be provided within 14 days of thereceipt of this letter.

If you have any questions regarding the NPDES permit, you may contact me at (937) 204-1002 or viaemail Iames.schwieterman(epa.ohio.qov.

Sincerely,

James SchwietermanStorm Water GroupDivision of Surface Water

J S/tb

Enclosed: Inspection Sheet

cc: Jared WilsonRodney Rose

Southwest District Office • 401 East Fifth Street s Dayton, OH 45402-2911wwwepa.ohio.gov . (937) 285-6357 (937) 285-6249 (fax)

Page 2: Mary Taylor, Lt. Governor - Ohiochagrin.epa.ohio.gov/edoc/images/DSWNOV20130625/1GC... · John R. Kasich Governor Mary Taylor, Lt. Governor Scott J. Nally, Director June 24, 2013

Ohio EPA DSW Storm Water Section, Construction Site Visit Information Form

Inspector initials: Z3 —S Visit date: (,I20 I13/ Permit # iLGC /\6

Site Name: Ccrcijc. i1cII &CM C

Site Address: _SKD 1cr,1i' cf ce--ck tk' ' 1 Ck LVfj

People Contacted On Site:.

Phone: E-mail: -J5/3 - 3 -

1. Did you see the following on site?

ITEM YES NO Not Requested Comments

Coverage Letter

SWP3/____ _______- lt&1

Inspection Records

Contractor& Subs __.7v

signature document

2. Acreage Disturbed: 5

3. Site Status: Clearing/grubbing

(treetsi

4. Are BMPs needed:

5. Are BMPs effective? All

rjng cmsewersin

Utilities installed Final Grade Final stabilization

Some None No BMPs

Explain:/1 F ,41riW (at/j ;1bv'(4•; 9N e e,chj

6-1 What post construction controls are shown on the SWP3? %?,t'P\ Stx.ç'

7. Were Photos taken & saved? 8. Was an NOV issued?

Additional notes/comments:OC\ L'\ JceJ (i4

Li T3

(t1U- 5 '.t' . (\k. Okl'\ Lec ki

oc '/9 Jc\-I 'L 6A a