Page 1: LLOG Delta House Water Package Case Study - H2O Inc.€¦ · CASE STUDY H2O INC. 841 VINCENT RD. LAFAYETTE, LA 70508 (P) 337.857.7203 DIVISION POTABLE WATER TREATMENT PROJECT NAME

CASESTUDY

H2OINC.841VINCENTRD.LAFAYETTE,LA70508(P)337.857.7203www.h2oinc.com

DIVISION

POTABLEWATERTREATMENT

PROJECTNAME

DELTAHOUSE

OWNER

LLOGEXPLORATION

ABOUTTHISPROJECT:POTABLEWATERSYSTEM LOCATION:GULFOFMEXICO

PROJECTFACTS

TheDeltaHousesemi-submersibleFloatingProductionSystemachievedfirstoilproductionin2015.ItisinstalledinMississippiCanyon254andsitsinwaterdepthof4,500feet.H2Owasawardedthecompletepotablewatersystemincludingthewatermaker,storagetankandpressuresetpackages.

CHALLENGE

Initially,thescopewasintendedasthreeseparatepackagesinstalledinvariouslocationsthroughouttheplatform:a5,000gallonperdayreverseosmosisdesalinationplanttosupplyenoughwaterfor50people,a2,500gallondaytankanda2X50gallonsperminutepressuresetskid.Thecustomerwasinterestedinwaystosavespaceandreducecostsfortheproject.

SOLUTION

H2Oofferedtopackagetheentirepotablewatersystemfortheplatformonasingleskid.Thesingleskidresultedinsmallerfootprintandeasierinstallationasitwasnowasingleliftitem.Additionally,thecustomersavedconsiderablecostsinthreeprimaryareas:

1) Engineering:• withthesameengineeringteamreviewingthespecificationsandsubmittingdocumentationforall

threepackages,H2Owasabletoreduce30%ofengineeringhoursrequired2) Controlsystem:

• withasinglesupplier,onlyonePLCwasrequiredtocontrolallthreepackagesasopposedtohavingaseparatePLCperpackage

3) Fieldinstallation:• alloftheinterconnectingplumbingandwiringbetweenthethreepackageswasconductedpriorto

delivery.Hence,havingthreepackagesonasingleskidminimizedfieldplumbingandcabling.

Page 2: LLOG Delta House Water Package Case Study - H2O Inc.€¦ · CASE STUDY H2O INC. 841 VINCENT RD. LAFAYETTE, LA 70508 (P) 337.857.7203 DIVISION POTABLE WATER TREATMENT PROJECT NAME

2

H2OINC.841VINCENTRD.LAFAYETTE,LA70508(P)337.857.7203www.h2oinc.com

RESULT

LLOGwasabletoachievedesiredcostreduction,whilesavingspaceandminimizingtheamountoffieldworktypicallyrequiredtointerconnectthesepackages.H2Owasabletodesign,test,documentanddeliverthisentirecustompotablewatersysteminlessthan20weeks.