TPM
MKS/TPM/RKFL/01-2008
TOTAL PRODUCTIVE MAINTENANCE ….
GOAL
Increase production while, at the same time, increasing employee morale and job satisfaction.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS
3MKS/TPM/RKFL/01-2008
TOTAL PRODUCTIVE MAINTENANCE ….
TPMWhy we need TPM ?The major objectives of the TPM are listed as
under :
1. Avoid wastage in quickly changing environment.
2. Reduce Cost of Manufacturing.3. Produce a low batch quantity at the
earliest possible time.4. Goods send to Customers must be “ non
– defective”
SRI SAIRAM INSTITUTE OF TECHNOLOGY & SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMSSIMS
4404/18/2304/18/23
IntroductionIntroductionTotal productive maintenanceTotal productive maintenance ( (TPMTPM) )
originated in Japan in 1971 as a method originated in Japan in 1971 as a method for improved machine availability for improved machine availability through better utilization of through better utilization of maintenance and production resources.maintenance and production resources.
TPM is a maintenance process TPM is a maintenance process developed for improving productivity by developed for improving productivity by making processes more reliable and less making processes more reliable and less wasteful.TPM is an extension of wasteful.TPM is an extension of TQM(Total Quality Management)TQM(Total Quality Management)
04/18/2304/18/23SRI SAIRAM INSTITUTE OF SRI SAIRAM INSTITUTE OF
TECHNOLOGY & SIMSTECHNOLOGY & SIMS 55
Why TPM ?Why TPM ?• TPM was introduced to achieve the following
objectives. The important ones are listed below.– Avoid wastage in a quickly changing
economic environment.– Producing goods without reducing product
quality.– Reduce cost.– Produce a low batch quantity at the earliest
possible time.– Goods send to the customers must be non
defective.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 6
What is TPM?
“Strategy of TPM is to change the attitude from “I use, You maintain” to “I use, I maintain”.
Think about how to Increase production and reduced cost by reducing or eliminating loss, and this is the TPM.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 7
Objectives of TPM• To improve equipment effectiveness
– TPM examines the effectiveness of facilities by identifying and examining all loses.
Example: Downtime loses, Speed loses, and defect loses.
• To achieve autonomous Maintenance– TPM allows the people who operate equipment to
take responsibility of the maintenance tasks.• To train all staff in relevant maintenance skills
– TPM places a heavy emphasis on appropriate and continuous training to all operating and maintenance staffs
04/18/2304/18/23SRI SAIRAM INSTITUTE OF SRI SAIRAM INSTITUTE OF
TECHNOLOGY & SIMSTECHNOLOGY & SIMS 88
Objectives of TPMObjectives of TPM
To plan maintenanceTo plan maintenance– TPM has a systematic approach to all TPM has a systematic approach to all
maintenance activities.maintenance activities. To achieve early equipment To achieve early equipment
managementmanagement– TPM aims to move towards zero TPM aims to move towards zero
maintenance through “Maintenance maintenance through “Maintenance Prevention”.Prevention”.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 9
MAINTENANCE
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS
10
MAINTENANCE….
MKS/TPM/RKFL/01-2008
MAINTENANCEThe Management, control,
execution and quality assurance of activities which ensure the achievement of optimum availability and performance of a plant in order to meet business objectives.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 11
Maintenance –
Objectives : • To enable product and service quality, and customer satisfaction
through healthy equipments
• Maximize useful life of the equipments
• Prevent unsafe working
• Minimize process variability
• Reduce the operational attributable to the equipments
• Minimize frequency and severity of equipment interruptions
• Maximize the productive capacity of the equipment resources
SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 1204/18/23
Why Maintenance is critical ?
Operational cost is one of the key differentiators
Machine would work only if people work
Ever increasing dependence on technology and machines due to higher levels of automation
Specialized technology calls for specialized maintenance skills
A good maintenance system can result into an effective inventory control for spare parts
Maintenance is no longer viewed as reaction to machine breakdowns, the role is to participate in quality and productivity enhancement
04/18/23SRI SAIRAM INSTITUTE OF
TECHNOLOGY & SIMS 13
Types (Phases) of Maintenance –
Breakdown Maintenance (Pre 1950s) – to set the machine right when in trouble
Preventive Maintenance (1950s) – establish a maintenance system to improve machine performance
Productive Maintenance (1960s) – recognizing importance of maintenance (1960s), reliability (1962), maintainability engineering (1962) and economic efficiency (engineering economy)
Total Productive Maintenance (1970s) – productive maintenance efficiency through a comprehensive system based on respect on individuals or total employee participation
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS
14
Maintenance Decisions –
• Centralized vs. Decentralized Departmentalization – general or specific skills, physical location, etc.
• In House vs. Outsourced System – cost factors, convenience, skill required, etc.
• Standby Equipments – cost of maintenance (of the main as well as stand by), time for maintenance, need for reliability, etc.
• Repair vs. Replacement – cost factors, performance assurance, etc.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 15
The Evolution of Maintenance
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 16
Pillars of TPM
04/18/2304/18/23SRI SAIRAM INSTITUTE OF SRI SAIRAM INSTITUTE OF
TECHNOLOGY & SIMSTECHNOLOGY & SIMS 1717
Pillars of TPMPillars of TPM
PILLAR 1 - Autonomous PILLAR 1 - Autonomous MaintenanceMaintenance A collaborative team activity involving production, A collaborative team activity involving production,
maintenance, and engineeringmaintenance, and engineering Maintaining Basic conditions on shop floor & in Maintaining Basic conditions on shop floor & in
Machines.Machines. All over participation through TPM Circles.All over participation through TPM Circles.
Example: 5 S’, JH ZEN ( Autonomous maintenance ), etc.,Example: 5 S’, JH ZEN ( Autonomous maintenance ), etc., An approach thatAn approach that
Develops operating and maintenance skillsDevelops operating and maintenance skills Strengthens communication and cooperationStrengthens communication and cooperation
04/18/2304/18/23 SRI SAIRAM INSTITUTE OF SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMSTECHNOLOGY & SIMS
1818
Steps in JH ZEN :Steps in JH ZEN :
Conduct initial cleaning/inspectionConduct initial cleaning/inspection Eliminate sources of contaminationEliminate sources of contamination Establish provisional standardsEstablish provisional standards Develop general inspection trainingDevelop general inspection training Conduct general inspectionsConduct general inspections Improve workplace management and controlImprove workplace management and control Participate in advanced improvement Participate in advanced improvement
activitiesactivities
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 19
Steps in JISHU HOZEN:
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS
20
Pillars of TPM
• PILLAR 2 - Focused Improvement• Improvement on every one’s activity.• Improvement is to eliminate Production losses and
cost reduction.• Improvement in Reliability, Maintainability, and cost.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 21
Pillars of TPM• PILLAR 3 - Planned Maintenance
– Logical analysis “Real causes for real counter measures”.– Focus on Prevention.– It is aimed to have trouble free machines and equipments producing
defect free products for total customer satisfaction.Example: Preventive Maintenance, Breakdown Maintenance, etc.,
• Six steps in Planned maintenance :– Equipment evaluation and recoding present status.– Restore deterioration and improve weakness.– Building up information management system.– Prepare time based information system, select equipment, parts and
members and map out plan.– Prepare predictive maintenance system by introducing equipment
diagnostic techniques.– Evaluation of planned maintenance.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 22
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 23
Pillars of TPM
PILLAR 4 - Quality MaintenanceDeveloping perfect machine for perfect Quality.
Eliminating In – Process defects and custom complaints.
Policy :Defect free conditions and control of equipments.
QM activities to support quality assurance.
Focus of prevention of defects at source
Focus on POKA-YOKE. ( fool proof system )
In-line detection and segregation of defects.
Effective implementation of operator quality assurance.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 24
Pillars of TPM• PILLAR 5 - Education & Training
– Skills development for uniformity of work practices on machines.– Skills for Zero defects, Zero breakdowns & Zero accidents.– Multi Skilled employees in all departments
• Steps in Educating and training activities :– Setting policies and priorities and checking present status of education and
training.– Establish of training system for operation and maintenance skill up
gradation.– Training the employees for upgrading the operation and maintenance skills.– Preparation of training calendar.– Kick-off of the system for training.– Evaluation of activities and study of future approach.– A clear understanding of the criteria for judging normal and abnormal
conditions– The ability to quickly respond to any and all abnormalities
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 25
Pillars of TPM
• Four Levels of Skills– Level 1: Lack both theoretical and practical ability (needs to be
taught)– Level 2: Knows theory but not in practice– Level 3: Has mastered practice but not theory– Level 4: Mastered both practice and theory
04/18/2304/18/23 SRI SAIRAM INSTITUTE OF SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMSTECHNOLOGY & SIMS
2626
Pillars of TPMPillars of TPM PILLAR 6 - Development ManagementPILLAR 6 - Development Management
Developing machines for “high equipment effectiveness”.Developing machines for “high equipment effectiveness”. Quick process for developing new products.Quick process for developing new products.
Example: KAIZENExample: KAIZEN
Kaizen Policy :Kaizen Policy : Practice concepts of zero losses in every sphere of activity.Practice concepts of zero losses in every sphere of activity. relentless pursuit to achieve cost reduction targets in all relentless pursuit to achieve cost reduction targets in all
resources.resources. Relentless pursuit to improve over all plant equipment Relentless pursuit to improve over all plant equipment
effectiveness.effectiveness. Extensive use of PM analysis as a tool for eliminating losses.Extensive use of PM analysis as a tool for eliminating losses. Focus of easy handling of operators.Focus of easy handling of operators.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS
27
Pillars of TPM
PILLAR 7 - Safety, Health & Environment Zero accidents and Zero hazards at
works. Zero Pollution at Plant and
Environment.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 28
Pillars of TPM• PILLAR 8 - Office TPM
– Office TPM must be followed to improve productivity, efficiency in the administrative functions and identify and eliminate losses. This includes analyzing processes and procedures towards increased office automation
– Plans & Guidelines:– Providing awareness about office TPM to all support departments– Helping them to identify P, Q, C, D, S, M in each function in relation to
plant performance– Identify the scope for improvement in each function– Collect relevant data– Help them to solve problems in their circles– Make up an activity board where progress is monitored on both sides -
results and actions along with Kaizens.– Fan out to cover all employees and circles in all functions.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 29
Pillars of TPM• P Q C D S M in Office TPM :
– P - Production output lost due to Material, Manpower productivity, Production output lost due to want of tools.
– Q - Mistakes in preparation of cheques, bills, invoices, payroll, Customer returns/warranty attributable to BOPs, Rejection/rework in BOP's/job work, Office area rework.
– C - Buying cost/unit produced, Cost of logistics - inbound/outbound, Cost of carrying inventory, Cost of communication, Demurrage costs.
– D - Logistics losses (Delay in loading/unloading)• Delay in delivery due to any of the support functions• Delay in payments to suppliers• Delay in information
– S - Safety in material handling/stores/logistics, Safety of soft and hard data.
– M - Number of Kaizens in office areas
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 30
Steps in introduction of TPM in a organization
Stage Step (Nakajima’s 12 Steps)
Preparation Stage Step 1:Announce top management’s decision to introduce TPM
Step 2:Introductory education campaign
Step 3:TPM Promotion
Step 4:Establish basic TPM policies and goals
Step 5: Preparation and Formulation of a master plan
Preliminary Implementation Stage Step 6:TPM kick-off
TPM Implementation Stage Step 7:Develop an equipment management program
Step 8:Develop a planned maintenance program
Step 9:Develop a autonomous maintenance program
Step 10:Increase skills of production and maintenance personnel
Step 11:Develop early equipment management program
Stabilisation Stage Step 12:Perfect TPM implementation and raise TPM levels
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 31
Implementation of TPM
04/18/2304/18/23SRI SAIRAM INSTITUTE OF SRI SAIRAM INSTITUTE OF
TECHNOLOGY & SIMSTECHNOLOGY & SIMS 3232
Steps in introduction of TPM Steps in introduction of TPM in a organizationin a organization
Step 1: Announce top Step 1: Announce top management’s decision to management’s decision to introduce TPMintroduce TPM– State TPM objectives in a company State TPM objectives in a company
newsletternewsletter– Place articles on TPM in the company Place articles on TPM in the company
newspapernewspaper
04/18/23SRI SAIRAM INSTITUTE OF
TECHNOLOGY & SIMS 33
Steps in introduction of TPM in a organization Step 2: Introductory education
campaign Seminars for managers Slide presentations for all employees
04/18/2304/18/23SRI SAIRAM INSTITUTE OF SRI SAIRAM INSTITUTE OF
TECHNOLOGY & SIMSTECHNOLOGY & SIMS 3434
Steps in introduction of TPM Steps in introduction of TPM in a organizationin a organization
Step 3:TPM PromotionStep 3:TPM Promotion– Special committees at every level to Special committees at every level to
promote TPMpromote TPM– Establish an organizational structure Establish an organizational structure – NewslettersNewsletters– ArticlesArticles– VideosVideos– PostersPosters
04/18/2304/18/23SRI SAIRAM INSTITUTE OF SRI SAIRAM INSTITUTE OF
TECHNOLOGY & SIMSTECHNOLOGY & SIMS 3535
Steps in introduction of TPM Steps in introduction of TPM in a organizationin a organization
Step 4: Establish basic TPM Step 4: Establish basic TPM policies and goalspolicies and goals Analyze existing conditionsAnalyze existing conditions Set goalsSet goals Goals that are Result oriented, Specific, Goals that are Result oriented, Specific,
Measurable, Attainable and Realistic Measurable, Attainable and Realistic PredictPredict TPM policies and goals should be very TPM policies and goals should be very
much clear to everyone involved in TPM much clear to everyone involved in TPM implementation results.implementation results.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 36
Steps in introduction of TPM in a organization
• Step 5: Preparation and Formulation of a master plan– A master plan lays out your goals, what you will do to
achieve them and when you will achieve them– Detailed plans for each pillar have to be prepared– This activity can be carried out by a consultant, plant
personnel, or both.– Consultant involvement typically begins with a plant
visit to observe production operations, learn about the equipment (type, function, condition, problems and losses etc.), study maintenance operations (structure, size and tasks etc.), gauge orderliness and cleanliness in the plant, and talk to employees to determine their motivation and attitude
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 37
Program Development Master Plan
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS
38
Steps in introduction of TPM in a organization
Step 6: TPM kick-off The main kick-off to TPM should take
the form of a formal presentation (feasible study Report)with all the employees attending
This opportunity can be used to gain the full support of the employees
Invite external customers, affiliated and subcontracting companies
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 39
Steps in introduction of TPM in a organization• Step 7: Develop an equipment management program
– The tools of total quality management and continuous improvement are applied to the management and improvement of equipment
– Form project teams– Select model equipment
- Identify equipment problems- Analyze equipment problems- Develop solutions and proposals for improvement
– Typical membership of a team- Five to seven operators- A maintenance person- A technical expert
– Tools- Pareto- Cause & effect- Root cause- Methods analysis
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 40
Steps in introduction of TPM in a organization
• Step 8: Develop a planned maintenance program– Set up plans and schedules to carry out work on
equipment before it breaks down, in order to extend the life of the equipment
– Include periodic and predictive maintenance– Include management of spare parts and tools
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 41
Steps in introduction of TPM in a organization
• Step 9: Develop a autonomous maintenance program– A handing-over of maintenance tasks from
specialized maintenance personnel to production operators
– Tasks to hand over- Cleaning- Lubricating- Inspecting- Set-up and adjustment
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 42
A Chart for Autonomous Maintenance
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 43
Steps in introduction of TPM in a organization
• Step 10: Increase skills of production and maintenance personnel– The training sessions must be planned shortly after
the kick-off presentation– 2 major components
- soft skills training- technical training
– Train leaders together– Have leaders share information with group
members
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 44
Training Skill Development Matrix
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 45
Steps in introduction of TPM in a organization• Step 11: Develop early equipment management program
– The principle of designing for maintenance prevention can be applied to new products, and to new and existing machines
– New products must be designed so that they can be easily produced on new or existing machines
– New machines must be designed for easier operations, changeover and maintenance
– Existing machines:- analyze historical records for - trends of types of failures - frequency of component failures - root causes of failures- determine how to eliminate the problem and reduce maintenance through an equipment design change or by changing the process
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 46
Steps in introduction of TPM in a organization
• Step 12: Perfect TPM implementation and raise TPM levels– Evaluate for the PM Award: The Japanese Institute for Productive
Maintenance runs the annual PM Excellence Award. They provide a checklist for companies applying for the award
– Set higher goals
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 47
6 Big Loses
Six Big Loss Category
Loss Category Examples Comment
Breakdowns Down Time Loss Tooling FailuresUnplanned MaintenanceGeneral BreakdownsEquipment Failure
There is flexibility on where to set the threshold between a Breakdown (Down Time Loss) and a Small Stop (Speed Loss).
Setup and Adjustments
Down Time Loss Setup/ChangeoverMaterial ShortagesOperator ShortagesMajor AdjustmentsWarm-Up Time
This loss is often addressed through setup time reduction programs.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 48
6 Big LosesSix Big Loss Category
Loss Category Examples Comment
Small Stops Speed Loss Obstructed Product FlowComponent JamsMisfeedsSensor BlockedDelivery BlockedCleaning/Checking
Typically only includes stops that are under five minutes and that do not require maintenance personnel.
Reduced Speed
Speed Loss Rough RunningUnder Nameplate CapacityUnder Design CapacityEquipment WearOperator Inefficiency
Anything that keeps the process from running at its theoretical maximum speed (a.k.a. Ideal Run Rate or Nameplate Capacity).
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 49
6 Big Loses
Six Big Loss Category
Loss Category Examples Comment
Startup Rejects
Quality Loss ScrapReworkIn-Process DamageIn-Process ExpirationIncorrect Assembly
Rejects during warm-up, startup or other early production. May be due to improper setup, warm-up period, etc.
Production Rejects
Quality Loss ScrapReworkIn-Process DamageIn-Process ExpirationIncorrect Assembly
Rejects during steady-state production.
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 50
Benefits of TPM• The properly implemented TPM has made excellent progress
in a number of areas. These include;• Increased equipment productivity• Improved equipment reliability• Reduced equipment downtime• Increased plant capacity• Extended machine line• Lower maintenance and production costs• Approaching zero equipment-caused defects• Improved team work between operators and maintenance
people• Enhanced job satisfaction• Improved return on investment• Improved safety
04/18/23 SRI SAIRAM INSTITUTE OF TECHNOLOGY & SIMS 51
Thank you
Collected byDr. K. BARANIDHARAN
Asst. Prof in Management StudiesSri Sairam Institute of Technology
Chennai