Investment projects on the territory of Aktobe
region, Republic of Kazakhstan
For potential investors, creditors, strategic
partners
Investment projects of mining, manufacturing and
oil industries
Project initiator: LLP "JP" Aktobe-Temir-VS "
The shareholders of the project initiator: Gemini
Mining B.V. (Virgin Islands)
Product: steel and cast iron
Raw material: mining rights to the field "Velihovskoe"
450 million. tons of proven iron ore reserves
Sales market: RK, (LLP "ARBZ") and export
The planned annual production: 1.0 mln. tons of steel /
cast iron
Project location: Kargaly district
The total cost of the project: 1.2 bln. USD
The amount of investment: 600 million. USD
Type of required investment: loan or equity financing,
leasing, off-take contract
The estimated duration of the project: 2018-2024
years
The current status of the project: developed
preliminary Feasibility Study
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected] 3
Possible state support:
1. Investment Preferences (exemption from customs
duties, land grants, preferential treatment of tax);
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4. Support of the project through the investor
services center ("one window").
Production of steel and cast iron
Project initiator: LLP «Aktobe steel production»
The shareholders of the project initiator:
-- 90.1% - resident of the Republic of Kazakhstan
-- 9.9% - JSC NC "SEC" Aktobe "
Product: production of concentrate from phosphorous iron ore to
produce cast iron
Raw material: iron ore deposit "Kok Bulak"
Sales market: The Russian Federation, China, Europe
The planned annual production: 8.0 mln. tons of iron ore
concentrate
The total cost of the project: 111 million. USD
The amount of investment: 78 mln. USD
Type of required investment: loan or equity financing, leasing,
off-take contract
The estimated duration of the project:
2017 - 2019 years
The current status of the project: Feasibility study and package
of documents are ready. In 2016 mining of iron ore begins
Production of iron ore concentrate
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
4
Possible state support:
1. Investment Preferences (exemption from customs duties,
land grants, preferential treatment of tax);
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services center
("one window").
Project initiator: LLP "Badamshinsky nickel plant"
The shareholders of the project initiator: resident of the
Republic of Kazakhstan
Product: nickel, cobalt, iron, manganese, chromium, copper,
aluminum, quartz sand
Raw material: Shirpakainskoe deposit of silicate nickel-cobalt ores
Sales market: Китай, Россия, Европа
The planned annual production:
1.nickel oxide concentrate - 3054 tons / year
2.cobalt oxide concentrate - 123 tons / year
Project location: Badamsha village
The total cost of the project: 125 million. USD
The amount of investment: 125 million. USD
Type of required investment: loan or equity financing, leasing,
off-take contract
The estimated duration of the project: 2016-2017 years
The current status of the project: documentation is ready, project
participants are determined
Production of nickel-cobalt concentrate
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
5
Possible state support:
1. Investment Preferences (exemption from customs duties,
land grants, preferential treatment of tax);;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services center
("one window").
Project initiator: LLP “Koytas "
Shareholders of the project initiator: JSC "Kazzinc"
Product: nickel, ferronickel
Raw material: Silicate nickel ore deposits c Kempirsai with
proven reserves of 12 million. tons with the prospect of up to
100 mln. Tons
Sales market: 100% export
The planned annual production:
500 thousand tons
Project location: Kargalinsky district
The total cost of the project: 70 mln. USD
The amount of investment: 70 mln. USD
The amount of investment: loan financing, leasing
The estimated duration of the project: 2015-2019 years
The current status of the project: the amount of nickel ores
are confirmed at 7 fields, feasibility study is ready
Organization of nickel production (ferronickel)
6
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Possible state support:
1. Investment Preferences (exemption from customs
duties, land grants, preferential treatment of tax);;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
Project initiator: LLP «KazCopper»
The shareholders of the project initiator: U.S. Megatech Inc.
(Great Britain)
Product: cathode copper containing 99.9%
Raw material:
1.The oxide ore (own field)
2.Sulfuric acid (Kazzinc)
3.Thinner SHELLSOL D90 (Shell Chemicals Europe BV)
4.The extractant LIX-984N (BASF SE (Germany))
5.Guar Guarfloc 66 (BASF Central Asia LLP)
6.Other reagents (RK)
Sales market: EU
The planned annual production: it is planned to increase the
production of copper cathode from 7 to 10 thousand tons
Project location: Aitikebi district
The total cost of the project: 30 mln. USD
The amount of investment: 30 mln. USD
Type of required investment: loan or equity financing, leasing,
off-take contract
The estimated duration of the project: 2016-2017 years
The current status of the project: currently we are producing 7
thousand. tons of copper cathode per year
Expansion of the copper cathode production
Possible state support:
1. Investment Preferences (exemption from customs
duties, land grants, preferential treatment of tax);;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
7
Project initiator: LLP "EKSPO enginring"
The shareholders of the project initiator: resident of the Republic
of Kazakhstan
Product:
1) ilmenite
2) rutile
3) zircon
Raw material: mining rights on "Shokash“ of titanium-zirconium
ores
(reserves - 10.3 mln. tons)
Sales market: Kazakhstan, the Russian Federation
The planned annual production: 0.7 million. M³ of ore
Project location: Martuk District
The total cost of the project: 40 mln. USD
The amount of investment: 40 mln. USD
Type of required investment: loan financing, leasing, off-take
contract
The estimated duration of the project: 2016-2017 years
The current status of the project: feasibility study is ready
Mining and processing of titanium-zirconium ores
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
8
Possible state support:
1. Exemption from customs duties and land grants;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
Project initiator: LLP "Voskhod-Chrome" (operating
company)
The shareholders of the project initiator: Yildirim group
(Turkey)
Product: chrome ore
Raw material: own chrome deposit
Sales market: CIS countries, export
The planned annual production: production expansion
up to 1 400 thousand tons
Project location: Chromtau district
The total cost of the project: 50 mln. USD
Type of required investment: loan and equity financing,
leasing, off-take contract
The estimated duration of the project: 2016-2017
years
The current status of the project: annual mining up to
1.0 mln. tons of ore
Expansion of chrome ore production
Possible state support:
1. Exemption from customs duties and land grants;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
9
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Project initiator: LLP "Kazakhstan Minerals Technology"
Акционер инициатора проекта: ILuka Resources Ltd (Australia)
Product: ore of titanium and zirconium
Raw material: "Aschisay" deposits of titanium and zirconium:
ore sand - 55,710 thousand m³
ilmenite - 1600 tons
rutile - 600 tons
Zircon - 400 tons
Sales market: Ust-Kamenogorsk Titanium-Magnesium plant,
Kazakhstan - 100%.
The planned annual production:
Concentrates of -
- Ilmenite (TiO2-54%) 141 442.7 tons
- Rutile (TiO2-94%) 25 579.9 tons
- Zirconium (Z2O2-65%) 58 924.5 tons
The total cost of the project: 17,4 mln. USD
The amount of investment: 17,4 mln. USD
Type of required investment: loan and equity financing
The estimated duration of the project: 2016-2018 years
Project location: Temir District, 120 km. from the city of Aktobe. 45
km from the nearest railroad station
The current status of the project: all design work on geological
exploration are completed, subsoil use contract until 2038
Mining of titanium-zirconium deposit "Aschisay"
10
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Possible state support:
1. Exemption from customs duties and land grants;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor
services center ("one window").
Project initiator: JSC "Koktas-Aktobe"
The shareholders of the project initiator: residents of the
Republic of Kazakhstan (JSC "Koktas-Aktobe")
Product: enriched kaolin
Raw material: own deposit of kaolin (more than 50 million. tons)
Sales market: Russia, China
The planned annual production: 50 thousand tons
Project location: Kandyagash district (1 hour drive from the city of
Aktobe)
The total cost of the project: 20 mln. USD
The amount of investment: 20 mln. USD
Type of required investment: loan or equity financing, leasing,
off-take contract
The estimated duration of the project: 2018 year
The current status of the project: feasibility study ready
Wet enrichment of kaolin
11
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Possible state support:
1. Investment Preferences (exemption from customs
duties, land grants, preferential treatment of tax);;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
Project initiator: ТОО «Chilisai Chemical»
Акционер инициатора проекта: Sunkar Resources Plc (Virgin
Islands)
Product: complex water-soluble nitrogen-phosphorus fertilizer -
diammonium phosphate (DAP), monoammonium phosphate
(MAP)
Raw material: own deposits of phosphorite and natural gas
Sales market: Kazakhstan, China, European countries
The planned annual production: 1.6 mln. tons of DAP / MAP
Project location: Mugalzhar District
The total cost of the project: 600 million. USD
The amount of investment: 600 million. USD
Type of required investment: loan or equity financing, leasing,
off-take contract
The estimated duration of the project:
Phase I in 2017 - 860 thousand tons of DAP / MAP;
Stage II in 2022 - 1 600 000 tons of DAP / MAP
The current status of the project: about 1.5 million US dollars
invested for research and development, feasibility study ready
(SNC-Lavalin).
Complex mineral fertilizers
Type - DAP / MAP
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
12
Possible state support:
1. Investment Preferences (exemption from customs
duties, land grants, preferential treatment of tax);;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
Recycling of stale slags refined ferrochrome
Project initiator: JSC "TNK" Kazchrome "
The shareholders of the project initiator: ERG (Eurasian
Group)
Product: stale slags, refined ferrochrome (an industrial by-
product)
Sales market: 95% for export - China, Japan, EU, US, South
Korea
The planned annual production:
1.Stockpiled slag - 500 thous. tons
2.Refined ferrochrome - 10 thous. tons
Project location: Aktobe
The total cost of the project: will be presented after the
completion of R & D, (design and estimate documentation)
Type of required investment: loan (100%) or equity
financing, leasing
The estimated duration of the project: 2015-2018 years
The current status of the project: laboratory studies are
conducted with positive results, the technology and
preliminary Feasibility Study is developed
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
13
Possible state support:
1. Investment Preferences (exemption from customs
duties, land grants, preferential treatment of tax);;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
Medium-carbon ferrochrome
Project initiator: JSC "TNK" Kazchrome "
The shareholders of the project initiator: ERG (Eurasian
Group)
Product: medium-carbon ferrochrome
Raw material: 1) high carbon ferrochrome liquid, 2) different
kinds of gases, and 3) a deoxidizer
Sales market/услуги: 95% for export - China, Japan, EU, US,
South Korea
The planned annual production: 65 thousand tons
Project location: Aktobe city
The total cost of the project: 110 mln. USD
The amount of investment: 28 mln. USD
Type of required investment: loan or equity financing, leasing
Период реализации проекта: 2015-2018 years
The current status of the project: technical and economic
evaluation of the two variants of medium-carbon ferrochrome
production technology is carried out
14
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Possible state support:
1. Investment Preferences (exemption from customs
duties, land grants, preferential treatment of tax);;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
Project initiator: LLP "Urikhtau Operating"
Акционер инициатора проекта: JSC "NC" KazMunayGas "
Product: oil, condensate, sales gas, liquefied petroleum gas
(propane-butane)
Raw material: production wells at the gas condensate field
Urikhtau
The planned annual production: oil production - 150.4
thousand tons, gas - 800 million m3, condensate - 510.3
thousand tons
Sales market: allegedly 88% for export, 12% of kazakh oil
refinery plants.
Project location: oil and gas deposit "Urikhtau" (250 km from
Aktobe)
The total cost of the project: need discussion with investor
Type of required investment: loan financing
The estimated duration of the project: design and
development of the deposit - through 2038. The design capacity
- 2019-2020 years
The current status of the project: the construction of
infrastructure, contract for combined exploration and production
of hydrocarbons in the field "Urikhtau“ until 05/12/2038
Exploration and production of hydrocarbons
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
15
Possible state support:
1. Simplification of foreign labor recruitment;
2. Concessional lending institutions development;
3.Support of the project through the investor services
center ("one window").
Project initiator: LLP «Vertex Holding»
The shareholders of the project initiator: resident of
the Republic of Kazakhstan
Product: iron ore concentrate
Raw material: own deposit Benkala
The planned annual production:
1.0 mln. tons of iron ore
600 ths. tons of iron ore concentrate
Project location: Aytekebi district
The total cost of the project: 4,3 mln. USD
The amount of investment: 2,5 mln. USD
Type of required investment: loan and equity financing,
leasing
The estimated duration of the project: 2017
The current status of the project: Feasibility studies is
ready. About 227 thousand tons of ore was mined up to
these days.
Construction of the infrastructure
Production of iron ore concentrate
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected] 16
Possible state support:
1. Simplification of foreign labor recruitment;
2. Concessional lending institutions development;
3.Support of the project through the investor services
center ("one window").
Initiator of the project: Research and Production
Association "Nitrohim Group" (current production)
Prospective participants in the project: LLP Paris CA-
KAZ (Switzerland), JSC "Chemoprojekt Nitrogen" (Czech
Republic) - co-investors, EPC contract
Product: nitric acid
Markets served: Domestic market - 50%, export - 50%
The planned annual production: of 480 th. Tons / year
(600 tons / hour)
Project location: Aktobe
The total cost of the project: 60 mln. USD
The amount of investment: 51 mln. USD
Type of required investments: debt and equity
financing, leasing, off-take contract
The estimated duration of the project: 2015-2019
The current status of the project: 15% of own
investment to the project is planned. Feasibility study is
developed.
Nitric acid production
Possible state support:
1. Exemption from customs duties and land grants;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Initiator of the project: Research and Production
Association "Nitrohim Group" (current production)
Participants of the project:
- JSC "Chemoprojekt Nitrogen" (Czech Republic) -
soinvestirovanie; "SAFIHEM project Group" (Czech
Republic) - the design and supply of equipment
Product description: ammonium nitrate
Sources of raw materials: nitric acid, natural gas
Markets served: Kazakhstan 50%, exports 50%
Estimated annual production: 500 thous. Tons per
year.
Project location: Alga District
Total cost of the project: 48 mln. USD
The amount of investment: 41 mln. USD
Type of required investments: debt and equity
financing, leasing, off-take contract
The estimated duration of the project: 2015-2019
The current status of the project: 15% of own
investment to the project is planned. Feasibility study is
developed.
Production of ammonium nitrate
Possible state support:
1. Exemption from customs duties and land grants;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Investment projects in energy, industry and
construction sectors
Utilization power plant
Project initiator: JSC "TNK" Kazchrome "
The shareholders of the project initiator: ERG (Eurasian
Group)
Product: electricity for operating needs of Aktobe ferroalloys
plant
Raw material: ferroalloy gas
Sales market: for operating needs of Aktobe ferroalloys plant
The planned annual production: 46,4 MW
Project location: Aktobe city
The total cost of the project: 110 mln. USD
The amount of investment: 110 mln. USD
Type of required investment: loan and equity financing,
leasing
The estimated duration of the project: 2016-2017 years
The current status of the project: Feasibility study of the
project is ready.
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
20
Possible state support:
1. Exemption from customs duties and land grants;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services center
("one window").
Project initiator: LLP «Arm Wind»
Product: electricity
The planned annual production: 200 thousand. MW / h
Project location: Badamsha district
The total cost of the project: 125 mln. USD
The amount of investment: 87,5 mln. USD
Type of required investment: loan and equity financing, leasing
The estimated duration of the project: the fourth quarter of 2017 (48
MW)
The current status of the project: an in-depth study of the region’s
potential by the project company DNV GL (Germany) is performed
(technical solution, location etc.) Feasibility study of the project is ready
Possible state support for wind farms:
1. Exemption from customs duties and land grants, the 15-year rate of 19
Tenge / 1 kWh;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services center ("one
window").
Wind farm
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
21
Project initiator: LLP "Kimpersay Energy»
Product: electricity
The planned annual production: 200 MW (expansion up to 300
MW)
Project location: Kimpersay district
The total cost of the project: 400 mln. USD
Type of required investment: loan and equity financing, leasing
The estimated duration of the project: 2016-2018 years
The current status of the project: completed geological
engineering works
Project initiator: «RenTeh BV» Dutch company
The shareholders of the project initiator:
1.«RenTeh BV» (initiator of the investor);
2.Energia (investor)
3.DB Technologies BV (equipment supplier)
Product: Recycling of solid waste, electricity
Raw material: MSW waste (200 000 tons) collected from
Aktobe city
Sales market: Aktobe city
The planned annual production:
processing 200,000 tons of solid waste from the biogas plant
capacity of 12 MW per hour
Project location: Aktobe city
The total cost of the project: 71 mln. USD
The amount of investment: 71 mln. USD
Type of required investment: loan and equity financing in the
national currency of Kazakhstan (Tenge)
The estimated duration of the project: 2016-2018 years
The current status of the project: a memorandum with the
akimat of Aktobe region is signed. 3 hectares of land plot rented,
Processing of municipal solid waste
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
22
Possible state support:
1. Exemption from customs duties and land grants;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
Project initiator: LLP "OksiBild"
Shareholders of the project initiator: resident of the
Republic of Kazakhstan
Product: plaster, plasterboard, gypsum dry mixtures
based on cement
Raw material: deposit of sand in Kargaly district.
The planned annual production: gypsum - 105 thous.
tons.
dry mix cement-based - 96 ths. tons.
drywall - 3.6 mln. m2
Sales market: Kazakhstan, the CIS countries
Project location: Aktobe city
The total cost of the project: 4,2 billion Tenge
The amount of investment: 2,9 billion Tenge
Type of required investment: loan and equity
financing, leasing
The estimated duration of the project: 2016-2017
years
The current status of the project: business plan is
developed. The supplier of the equipment PARGET
MAKINA (Turkey) and KNAUF (Germany)
Production of dry construction mixtures
23
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Possible state support:
1. Exemption from customs duties and land grants;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor
services center ("one window").
Project initiator: LLP «ASBI SAT GROUP» has a current
production
The shareholders of the project initiator: Plan S.r.l. (Italy)
Product: Reinforced concrete sleepers for railways
Raw material: Cement - Volsk (Russia)
Wire - Karaganda region
Rubble and sand - Aktobe region
The planned annual production: 550 thousand - 600 thousand
units.
Sales market: JSC "NC" Kazakhstan Temir Zholy"
Project location: Aktobe region
The total cost of the project: 8 mln. USD
The amount of investment: 2,5 mln. USD
Type of required investment: loan financing, leasing
The estimated duration of the project: 2015-2018 years
The current status of the project: existing enterprises. Signed
a contract for the supply of equipment
Production of concrete products
24
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Possible state support:
1. Simplification of foreign labor recruitment;
2. Concessional lending institutions development;
3.Support of the project through the investor services
center ("one window").
Project initiator: TOO "Ainek"
The shareholders of the project initiator: LLP «Samruk-Kazyna
Invest"
Product: bottle (0,5 and 0,7 litters), jar (0.5 and 1 and 3 litters)
Raw material: Mugalzhar deposit of quartz sand, more than 600
million tons of tailings deposits of nickel-cobalt ores
The planned annual production: 91.8 thousand tons per year
Sales market: Kazakhstan, the Russian Federation
Project location: Aktobe city
The total cost of the project: 100 mln. USD
The amount of investment: 70 mln. USD
Type of required investment: loan or equity financing, leasing, off-
take contract
The estimated duration of the project: 2016-2018 years
The current status of the project: business plan and feasibility
study is ready project
Manufacturing of glass containers
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
25
Possible state support:
1. Investment Preferences (exemption from customs
duties, land grants, preferential treatment of tax);;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
Project initiator: LLP “Eco Trade Aktobe"
Product: Pulp and paper for corrugating, cardboard, corrugated
cardboard and packaging
Sales market: Russia and CIS countries
The planned annual production:
corrugated cardboard - 42 thous. tons
corrugated - 6 th. Tons
Project location: Chromtau district
The total cost of the project: 52,3 mln. USD
The amount of investment: до 50 mln. USD
Type of required investment: loan or equity financing, leasing
The current status of the project: feasibility study and business
plan is ready, technology is determined, contracts with partners from
China for the supply of equipment is signed, about 100 hectares of
land plot in the area Chromtau privately owned
Construction of the pulp and paper factory
26
Possible state support:
1. Investment Preferences (exemption from customs
duties, land grants, preferential treatment of tax);;
2. Simplification of foreign labor recruitment;
3. Concessional lending institutions development;
4.Support of the project through the investor services
center ("one window").
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Investment projects in the service and
infrastructure sectors
Project initiator: TOO "Dastan" is operating company
with construction and hotel businesses
Brief description of the hotel: 4-star hotel rooms,
restaurant, gym, conference hall and a SPA
The planned annual capacity: 32 thousand beds
Project location: Aktobe city
The total cost of the project: 20 mln. USD
The amount of investment: 14 mln. USD
Type of required investment: loan and equity financing,
leasing
The estimated duration of the project: 2016
The current status of the project: operating business.
Possible state support:
1.Support of the project through the investor services
center ("one window").
Hotel
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
28
Hotel "Sheraton"
Project initiator: LLP “Accept Contraction»
The shareholders of the project initiator: resident of the
Republic of Kazakhstan
Brief description of the hotel: floors - 9; rooms - 177; total
area - 21 600 m2; services - restaurants, bars, rental of
conference rooms, spa, fitness center, swimming pool, night
club
The planned annual capacity: 65 thousand beds
Project location: Aktobe city
The total cost of the project: 9 bln. Tenge
The amount of investment: 9 bln. Tenge
Offer for investors: up to 100% shares of the hotel, long-
term lease
The current status of the complex: имеется соглашение с
компанией Starwood (владелец сетей гостиниц
«Sheraton»), готовность объекта - 95%, остались
отделочные работы
Possible state support:
1. Support of the project through the investor services
center ("one window").
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
29
Trade and entertainment complex
Project initiator: LLP «Center Grand»
The shareholders of the project initiator: resident of the
Republic of Kazakhstan
Brief description of the complex: TEC "Zhibek Zholy" 8
storey building with retail and entertainment area
Planned annual occupancy: rental premises - 4700 sq.m.
Project location: Aktobe city
The total cost of the project: 1 276 mln. Tenge
The amount of investment: 957 mln. Tenge
Offer for investors: loan and equity financing, leasing
The current status of the complex: at the design stage, we
have privately owned land
Possible state support:
1. Support of the project through the investor services
center ("one window").
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
30
Project initiator: LLP «Center Grand»
The shareholders of the project initiator: resident of
the Republic of Kazakhstan
Product: construction of residential area - 53 block
sections
The planned annual production:
The total built-up area - 164 of 180 m2
The area of commercial premises – 3463 m2
Project location: в центре города Актобе, р-н обл
ГАИ
The total cost of the project: 14,7 млрд. тенге
The amount of investment: 11,1 млрд. тенге
Type of required investment: borrowed funds
The estimated duration of the project: 2016-2017
years
The current status of the project: на стадии
проектирования
Housing area
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
31
Possible state support:
1. Support of the project through the investor services
center ("one window").
Project initiator: LLP "Akpan" has an operating
recreation center
Brief description of the center: 33 hectares of privately
owned land plot, a restaurant with 300 seats, a hotel
complex with 50 rooms, a mini zoo, a leisure complex,
beach etc.
The planned annual amount of visitors: 60 thousand
people
Project location: Aktobe city
The total cost of the project: 6,7 mln. USD
The total cost of the project: 5,1 mln. USD
Type of required investment: loan and equity financing,
leasing
The estimated duration of the project: 2016
The current status of the project: an operating
recreation center
Recreation center «Green Land»
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Possible state support:
1. Support of the project through the investor
services center ("one window").
32
Project initiator: akimat of Aktobe region
The essence of the project: construction of 140 km. gas pipeline
Место реализации: Aytekebi district
Prospective participants in the project: JSC "KazTransGas"
(investor)
Capacity: пропускная способность газопровода 20 000 м3 /час
The total cost of the project: not determined
The estimated duration of the project: 2016-2018 years
Sales market: settlements, 2 industrial enterprises - JSC
«KazCopper», LLP «Vertex Holding»
Type of required investment: project financing
Possible state support:
1. Simplification of foreign labor recruitment;
2. Concessional lending institutions development;
3.Support of the project through the investor services center ("one
window").
Construction of gas pipeline
33
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Investment projects in agribusiness sector
34
Project initiator: LLP "APK Zapad"
Product: chilled and frozen broiler meat
Sales market: western region of the Republic of Kazakhstan, Aktobe
region
The planned annual production: 5 000 tons
Project location: Alga district
The total cost of the project: 3,5 bln. Tenge
The amount of investment: 2,5 bln. Tenge
Type of required investment: loan financing, leasing
The estimated duration of the project: 2016
The current status of the project: we have 240 ha. of privately
owned land plot
Poultry meat (broiler)
35
Possible state support:
1. Subsidies for the production of poultry meat in
the amount of 17% to 21% of the price per kg;
2. Subsidizing part of the expenditures for animal
feed - up to 45%;
3. Subsidizing part of the costs for purchasing the
breeding eggs and chicks - up to 50% of the price,
or not more than 303 Tenge for chicken;
4. Concessional lending institutions development;
5.Support of the project through the investor
services center ("one window").
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Project initiator: "Zhantizer“ farm
Product: chilled and frozen lamb meat
Sales market: western region of the Republic of Kazakhstan,
Aktobe region, Russia
The planned annual production: 5 thousand tons
Project location: Chromtau
The total cost of the project: 10,8 mln. USD
The amount of investment: 10,8 mln. USD
Type of required investment: loan or equity financing, leasing
The estimated duration of the project: 2016
Current situation in this business: there are no lamb
processing factories in Aktobe region. The demand of the
region in meat of lamb is 10 000 tons per year, the amount of
sheep in the region is more than 1.2 million
The construction of slaughterhouse for deep processing of meat lamb
36
Possible state support:
1. Subsidies for the production of more than
$ 1.5 for 1 kg;
2. Subsidizing up to 50% of the costs for animal
feed;
3. Subsidizing part of the costs for the purchase
of breeding sheep from abroad;
4. Concessional lending from development
institutions;
5. Support of the project through the investor
services center ("one window").
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Agribusiness projects
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
37
Project initiator: "Zhana-turmys“ farm
Required facilities:
1. Dairy farm for 600 heads with the processing capacity of (50 ha.
of privately owned land plot)
2. feedlots and meat processing plant - 12.9 mln. USD
3. Feed mill - 4.4 million. USD (raw materials - wheat 4-5 grades,
barley etc.)
4. Logistics center - 7.4 million USD (15 ha. Of privately owned
land plot)
5. Small cattle and horse breeding - 2.2 mln. USD
6. roadside service - 0.7 mln. USD
7. crushed stone plant\
Project location: Kosistek district (65 km. From Aktobe city),
The total cost of the project: 37 mln. USD
The amount of investment: 37 mln. USD
Type of required investment: loan and equity financing, leasing
The current status of the project: operating farm with more
than13 thousand ha. Privately owned land,
Possible state support:
1. Subsidies for production costs on purchase of animal feed and
breeding of biological assets;
2. Concessional lending by institutions of development;
3.Support of the project through the investor services center ("one
window").
Project initiator: LLP «Milk-A History," operating
production
Product: Fermented milk Product «Tandem", "Baked
milk", "Kefir", "varenets", "Kefir", "Snow", "butter", "curd"
Sales market: Kazakhstan, the Russian Federation
The planned annual production:
Tandem 0.5 liters. - 1.08 million units.
Tandem 1 liter. - 2.645 million units.
Tandem 1.5 liters. - 3.96 million units
Project location: Aktobe city
The total cost of the project and the amount of
investment: 80 thousand. euros for the modernization
of existing production
Type of required investment: loan financing
The estimated duration of the project: 2016
Production expansion of dairy products
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
38
Possible state support:
1. Subsidies for 1 kg. of sold product more
than $ 0.16;
2. Subsidizing up to 45% of the costs for
animal feed;
3. Subsidizing up to 50% of the costs for
purchasing of breeding stock ;
4. Concessional lending from institutions of
development;
5.Support of the project through the investor
services center ("one window").
Project initiator: TOO "Tandem“ operating meat plant
Product: boiled-smoked products, delicacy of lamb, beef and horse
meat standard "Halal"
Sales market: Kazakhstan and Russia
The planned annual production:
1.According to a slaughterhouse 1.0 thous. tons
2.On the basis of fattening 0,633 th. tons
Project location: Aktobe city
The total cost of the project: 8,6 mln. USD
The amount of investment: 8,6 mln. USD
Type of required investment: loan or sale up to 70% of the share
capital to complete the project with the feedlots
The current status of the project:
Stage 1 - construction of slaughterhouse is completed – we are
offering the investor to refinance debt of the company in the amount of
1 mln. USD, with the assignment of up to 70% in the authorized
capital
Stage 2 - developing a business plan for the fattening of 2000 heads
of cattle and 1,000 head of breeding stock with acreage to an existing
meat processing plant - 3.5 mln. USD.
Expansion of plant for the production of sausages
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
39
Possible state support:
1. Concessional lending institutions development;
2.Support of the project through the investor services
center ("one window").
Project initiator: LLP "Aktepa" existing farm
Product: beef supreme and first category
Sales market: meat processing plant located in the 700 m. from the
farm
The planned annual production: in 2016 it is planned to produce 7
000 tons of beef
Project location: Alga district, 55.9 thousand ha. of rented land for 49
years
The total cost of the project: 1,9 billion Tenge
Type of required investment: loan (100%) financing
Possible state support:
1. Subsidies for the production of more than $ 1.5 per 1 kg .;
2. Subsidizing part of the costs of animal feed - up to 50% for breeding
cattle - more than 30 US dollars per cattle;
3. Subsidizing part of the costs for the purchase of breeding cattle
from abroad;
4. Concessional lending from institutions of development;
5.Support of the project through the investor services center ("one
window").
Breeding cattle beef
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
40
Project initiator: LLP «Sambrero»
Product: up to 2 000 m2 for small wholesale warehouse for fruits
and vegetables
Sales market: Aktobe city
The planned annual production: 24 million Tenge
Project location: Aktobe city
The total cost of the project и The amount of investment: 150
million Tenge
Type of required investment: loan and equity financing, leasing
The current status of the project: on the stage of developing
design documents
Construction of vegetable stores
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
41
Possible state support:
1. Up to 30% subsidies for the construction costs;
2. Concessional lending from institutions of development;
3.Support of the project through the investor services
center ("one window").
Project initiator: "A.S.Ar.Az.G“ farm
Product: semi-finished leather chrome tanning «Wet-blue»
The planned annual production: processing of hides of
cattle 2 160 tons or 3,5 mln. USD
Project location: Martuk district
The total cost of the project и The amount of
investment:150 mln. Tenge
Type of required investment: loan financing
The estimated duration of the project: 2016
The current status of the project: small scale operating
production
Possible state support:
1._subsidies for the construction costs
2. Concessional lending institutions development;
3.Support of the project through the investor services center ("one
window").
Expansion of the plant for processing cattle hides
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
42
Project initiator: LLP "Ramadan" current production
Product: all grades flour, pasta, cereals, bakery, confectionery,
Doughnuts products, eggs, chicken, minced chicken operating production
Sales market: the western region of Kazakhstan. To cooperate on the
supply of flour to Turkmenistan, Uzbekistan, Tajikistan, Kyrgyzstan and
Afghanistan
The planned annual production:
1. Mill -150 tons per day
2. Mini-mill capacity - 40 tons
3. Bakery - 30 tons per day. It allows you to provide about 70% of the
needs of the city in bakery products
4. Doughnuts Capacityyu 1 ton of products per day.
5. Poultry farm contains more than 450 thousand poultry. Every year it
produces more than 100 million. eggs
Project location: Aktobe city
The total cost of the project: need discussion with investor
Type of required investment: long-term lease, a strategic partner
The current status of the project: operating production facility - 12
thousand ha. of arable land
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Expansion of bakery production
43
Possible state support:
1._ Subsidizing for production costs, purchase of animal feed,
breeding of biological assets;
2. Concessional lending institutions development;
3.Support of the project through the investor services center
("one window").
Projects under the scheme of
Public-Private Partnership
Project Initiator: akimat of Aktobe region
Project: a kindergarten in the district Zarechny-2
Capacity: 150 seats
The total cost of the project: 359 million. Tenge
Project implementation period: 2016
Project: a kindergarten in the district Zarechny-3
Capacity: 150 seats
The total cost of the project: 291 million. Tenge
Project implementation period: 2016
Project: Kindergarten in district Batis
Capacity: 320 seats
The total cost of the project: 587 million. Tenge
Project implementation period: 2016-2017 years
Project: a kindergarten in the village Clear
Capacity: 320 seats
The total cost of the project: 562 million. Tenge
Project implementation period: 2016-2017 years
PPP - kindergartens in the city of Aktobe
45
Possible state support:
- subsidizing the interest rate of bank loan;
- guaranteed state order;
- Co-financing of concession projects (25%).
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Project Initiator: akimat of Aktobe region
Project: preschool institution in g.Alga
Capacity: 320 seats
The total cost of the project: 521 million. Tenge
Project implementation period: 2016-2017 years
Project: preschool institution in district Shubarkuduk
Capacity: 280 seats
The total cost of the project: 496 million. Tenge
Project implementation period: 2016-2017 years
Project: preschool institution in district Emba
Capacity: 320 seats
The total cost of the project: 531 million. Tenge
Project implementation period: 2016-2017 years
PPP – preschool kindergartens
46
Possible state support:
- subsidizing the interest rate of bank loan;
- guaranteed state order;
- Co-financing of concession projects (25%).
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Project Initiator: akimat of Aktobe region
Project: Construction of urban clinics in the residential
area "Nur-Aktobe"
Capacity: 500 visits per shift
The total cost of the project: 1457 million Tenge
Project implementation period: 2016-2017years
Project: Construction of urban clinics in the residential
area Batys-2
Capacity: 500 visits per shift
The total cost of the project: 1 661 million Tenge
Project implementation period: 2016-2017 years
PPP - clinics
47
Possible state support:
- subsidizing the interest rate of bank loan;
- guaranteed state order;
- Co-financing of concession projects (25%).
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Project initiator: akimat of Aktobe region
Проект: modernization of wastewater treatment plants
(WWTP)
Location: Aktobe city
Capacity: 100 thousand. M3 / day
The total cost of the project : 17 bln. Tenge
The estimated duration of the project: 2016-2018 years
The current status of the project: complex wastewater
treatment plant was put into operation in 1981. The
capacity of facilities - 103 thous. m³ / day. The actual
average flow of sewage - 65 thous. M³ / day
PPP - modernization of sewage treatment plants
48
Possible state support:
- compensation the investment and
operating costs;
- return expenditure within the investment of
own funds of the concessionaire (15% of
the investment);
- guarantee the acquisition of services at a
certain price.
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Project initiator: akimat of Aktobe region
Project: Installation and operation of LED lamps in the streets of the
city of Aktobe
Capacity: network length of 223 km, 7098 lamps
The total cost of the project: up to 900.0 mln. Tenge
The estimated duration of the project: 2016
Possible state support:
- compensation the investment and operating costs;
- return expenditure within the investment of own funds of the
concessionaire (15% of the investment);
- guarantee the acquisition of services at a certain price.
PPP - the modernization of street lighting
49
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Enterprises for Privatization
Project initiator: Akimat of the Aktobe region
The shareholders of the project initiator:
JSC "Alatau Zharyk Kompaniyasy"
(100% subsidiary of JSC "Samruk-Energo")
The essence of the project: the transfer to the trust
management of JSC "Aktobe CHP". Implementation of
up to 50% of shares
Capacity: thermal energy - 878 Gcal / h; electric
power - 88 MW
Рынок сбыта: Aktobe city
The total cost of the project: during 2013 the share
capital was 3.8 bln. Tenge with the profit of 1.0 bln.
Tenge.
Необходимые инвестиции: requires assessment
Сырье: associated petroleum gas from Aktobe region
Место реализации: Aktobe city
Type of required investment: the redemption of up
to 100% of the share capital.
Possible state support:
1.Guaranteed sales of thermal energy;
2.Management fee, reimbursement of operating
expenses, and others.
Concession JSC "Aktobe CHP"
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
51
Project initiator: LLP "Passenger motor company"
The shareholders of the project initiator: akimat of the
region
The volume of services rendered: more than 30% of
passenger transportation Aktobe
Project location: Aktobe city
The carrying value of the property: 5 bln. Tenge
Type of required investment: asset management
company, the investment in a fleet of buses, upgrading
facilities and more.
The estimated duration of the project: 2016
The current status of the project: we have 97 buses. In
order to encourage the transfer of buses on gas in 2016
two methane stations will be opened in the city
Possible state support:
1. Public-private partnership;
2. Preferential lease financing purchases of buses;
3. Keeping the state's share to 50% of the equity of
the project initiator.
Urban passenger transport
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
52
Not operating enterprises
offered for redemption or sharing
Owner: JSC "Ceramics"
Products that can be produced at the plant: Ceramic tiles
Land plot: 13.7 hectares
Production area: shopping area - 0.13 ha
Production and storage facilities - 37 500 sq.m.
Infrastructure: railroad branch with access roads and ramps,
gas, electricity, sewerage and water supply
Raw material: they have their own deposit
Project location: Khromtau (95 km from the city of Aktobe)
Sales market: Kazakhstan and Russia
Potential annual production:
1.0 mln. M2 of ceramic tiles
The main suppliers of the equipment:
Italian company «SACMI», «SMAC».
The offer to the investor: the full sale of the enterprise or co-
production
Ceramic tile
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
54
Owner: Group of Companies "RIFMA Group”
Products that can be sold in the enterprise: full-featured FMCG-
hypermarket or supermarket variant on the 1st floor and boutique
area.
Land plot: 0,5 ha.
Production area: shopping area - 4500 square meters. Industrial
space - 800 square meters.
Warehouses - 800 m².
Infrastructure: parking for 70 cars, gas, electricity, sewerage and
water supply, telephone and Internet.
Project location: in the center of Aktobe city
Sales market: local population
Major equipment suppliers: Modern-Expo (shelving and cash
register equipment), Iceberg (refrigeration)
Offers for investors: For sale fully equipped buildings FMCG
hypermarket with total area of 6492 m2 (2009 GP), long-term
rental, or financing of working capital network of hypermarkets
"Olzhay" - 3 million. $
Hypermarket
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
55
Project initiator: JSC "Investment Fund of
Kazakhstan"
Products that can be manufactured at the company:
ячеистый бетон
Land plot: 8,8 ha
Production area: privately owned land
Infrastructure: railroad branch with access roads and
ramps, gas, electricity, sewerage, water supply
Project location: Aktobe city, р-н Промзона
Sales market: РК, РФ Potential annual production: 170 thousand. M3 of
AAC
Shareholders of the company:
JSC "Investment Fund of Kazakhstan" - 48%
LLP "Zhiger" - 52%
Major equipment suppliers: The company «MASA -
HENKE» (Germany)
The total cost of the project: 30 mln. $
Offers for investors: complete sale of the enterprise or
a co-production
Cellular concrete blocks
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
56
Owner: JSC "NC" SEC "Aktobe"
Land plot: 0,56 ha
Production area: there is an additional workshop with
metal-cutting equipment, 6 valve blocks
Production area - 4500 m2.
Own private warehouses
Infrastructure: There is infrastructure to the border of
the land.
Project location: Aktobe city
Offers for investors: buy / lease of land and industrial
facilities
Owner: LLP “Akruno”
Land plot: long-term lease of land of 7 hectares.
Completeness of the facility: 100% (7 thousand m2)
Encumbrances (mortgage): NO
Production area: 7 thousand m2
Infrastructure: rail road branch, gas, electricity,
sewerage, water supply
Project location: Aktobe, industrial zone
Sales market: internal market
Major equipment suppliers: equipment is absent
Offers for investors: rent, joint venture, equity
Industrial premises
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
57
Knitted products
Owner: TOO "Edemi"
Products that can be manufactured at the company:
jerseys (T-shirts, sports suits, underwear knitted underwear,
etc.)
Land plot: 3,5 ga
Production area: building 149m x 24m, the area of 17
thousand m2. Operating since 1966
Infrastructure: railroad branch, medium-pressure gas is
introduced into the territory of the production base, electricity
and sewer urban water in sufficient quantities
Raw material: must be purchased outside of the Republic of
Kazakhstan.
Project location: Aktobe city
Sales market: internal market
Major equipment suppliers: Spain, Czech Republic, Japan,
USA
Offers for investors: long-term lease or a joint production
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
58
Project initiator: JSC "Kazkommertsbank"
Company: LLP "Hobas Pipes Kazakhstan" Since 2010,
the plant is not operating.
Products that can be manufactured at the company:
Multifunctional pipe diameter of 30-140 cm and fittings
made of fiberglass reinforced polyester (CC GRP -
Centrifugal cast glassfiber reinforced polyster, technology
HOBAS Engeeniring Austria)
Innovation, unique enterprise: the pipe from DN200 to
DN 1400 mm
Project Capacity output: 120 km of pipes of different
diameters in a year.
Available equipment: feeder with 2 interchangeable
trunks (A11 and A21).
Land plot: 2 plots of land with total area of 3.1932 ha
(2.4899 ha and 0.7033 ha), the form of ownership - private
Completeness of the facility: 100%
Production area: 7 753.2 sq.m.
Infrastructure: · Communication - central (city), an
autonomous gas heating system, PABX system, fire
alarm, video surveillance, computer network.
The industrial complex has all the necessary
infrastructure, including transport (access to roads and
railways).
The area is fenced and asphalted
Raw material: polyester resin, reinforcement of
chopped glass fibers, silica sand and calcium carbonate
(ground crystalline marble).
Encumbrances (mortgage): No
Notes: The plant is disconnected from all
communications (except for electricity).
Offers for investors: total sales
Production of pipes
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
59
Infrastructure: · There w / e access roads, power lines
from the transformer substation, gas boiler with hot
water and steam boilers, borehole with a tank of 500 m3
of water.
Raw material: gravel, CBC - Aktobe city
cement fittings - Karaganda
Encumbrances (mortgage): YES
Offers for investors: credit for 5 years, other variants
Owner: LLP "JBI-30"
Company: LLP "JBI-30"
Products that can be manufactured at the company:
JBI-Fundam pillows, blocks, lintels, panels: floors, road /
air field / channel electric poles, blocks and bricks SCC,
block plans to release sulfatostokogo of cement from 400
to 800, lime.
Innovation, unique businesses: sulphate resistant
cement brands from M400 to M800 on the basis of
industrial production waste
Available equipment: For the production of concrete
products have 100% of the equipment according to the
technological process
Land plot: 10 ha, long-term lease
Completeness of the facility: 100%
Production area: 4000 m2, built in 1985-1992,
satisfactory condition
Production of construction materials
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
60
Owner: LLP "Aktaza"
Company: LLP "Aktaza"
Cost of the project: 4,0 mln. USD
Land plot: 2,5 ha. on the rights of private property
Completeness of the facility: 100%
Production area:
production plant - 2500 m2
ABK - 3000 m2
Warehouses - 800 m2
Infrastructure: · gas, electricity (60kW), sewerage, water
tehniicheskaya (well)
Offers for investors: total sales
Production premises
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
61
Meat and milk factory
Owner: TOO "Algabas"
Products that can be manufactured at the company:
ice cream and frozen foods
Land plot: 2,0 ha of privately owned land plot
Production area: 2000 m2, built in 1980-2000
Infrastructure: gas, water, electricity, sewerage
Raw material, materials, components: agricultural-
forming region
Project location: Aktobe city
Sales market: domestic market
Offers for investors:
- total sales
- Joint ownership
- long term rental
- Other
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
62
Investment project
small and medium business
Project initiator: LLP “Spectehnika"
The shareholders of the project initiator: LLP
"Spectehnika"
Product:
1. Grader 2. Shovels, rubber-tired
All these types of equipment has concluded an agreement on
the transfer of technical conditions of the copyright holders. In
Aktobe region is no analog output.
Sales market: government agencies, mining companies and
enterprises of Aktobe region, the share of exports is 15%
The planned annual production output: 50 units per year
Project location: industrial zone "Aktobe"
The total cost of the project: 1,3 mln. USD
The amount of investment: 1,3 mln. USD
Type of required investment: loan and equity financing,
leasing
The estimated duration of the project: 2016
Assembling special equipment
with the production of component parts
The current status of the project: operating
business
Possible state support:
1. Land plot with finished industrial infrastructure in
the industrial zone "Aktobe";
2. Subsidizing the interest rate on the loan;
3. Support of the project through the investor
services center ("one window").
64
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Project initiator: LLP «TALAN Technology»
The shareholders of the project initiator: resident of the
RK
Product: collapsible floor coverings
Sales market: Kazakhstan
The planned annual production output: 60 thousand sq.
Meters of tiles
Project location: industrial zone "Aktobe"
The total cost of the project: 3,2 mln. USD
The amount of investment: 3,2 mln. USD
Type of required investment: loan and equity financing,
leasing, leasing
The estimated duration of the project: 2016
The current status of the project: at the stage of obtaining
permits for construction, installation and start of construction
is expected in late 2015
Manufacture of rubber products and coatings
65
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Possible state support:
1. Land plot with finished industrial infrastructure in
the industrial zone "Aktobe";
2. Subsidizing the interest rate on the loan;
3. Support of the project through the investor
services center ("one window").
Project initiator: LLP "Akras Metal"
Shareholders of the initiator of the project: resident of the
RK
Product: Welded circular cross section and profile
Markets for products: RK
Estimated annual production: 35 thousand. Tonnes
Project location: Aktobe
The total cost of the project: 400 mln. Tenge (1.3 million.
Dollars. USA)
Minimum investment: 400 mln. Tenge (1.3 million.
Dollars. USA)
Type the necessary investment: a concessional loan, a
strategic partner
The estimated duration of the project: The project is
ready, it required working capital
Current Status: The project is working on their own and
credit means of Halyk Bank of Kazakhstan 50/50%
Manufacture of steel tubes
66
Центр обслуживания инвесторов: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Possible state support:
1. Land plot with industrial infrastructure in the
industrial zone "Aktobe";
2. Subsidizing the interest rate on the loan;
3. Support of the project through the investor
services center ("one window").
Project initiator: LLP «Alem Power»
The shareholders of the project initiator: resident of the
RK
Product: Lithium-ion batteries, stationary and portable
generators with integrated drive
Sales market: the CIS countries and abroad
The planned annual production of products: the lithium-
ion battery 190 000 pcs.,
Generators: 120 000 units.
Project location: industrial zone "Aktobe"
The total cost of the project: 8,1 mln. USD
The amount of investment: 3,2 mln. USD
Type of required investment: loan and equity financing,
leasing, leasing
The estimated duration of the project: 2016
The current status of the project: completed R & D,
produced prototypes., Developed a business plan
Lithium Batteries
67
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Possible state support:
1. Land plot with industrial infrastructure in the
industrial zone "Aktobe";
2. Subsidizing the interest rate on the loan;
3. Support of the project through the investor
services center ("one window").
Project initiator: LLP "Tengri AB"
The shareholders of the project initiator: resident of the
RK
Product: restoration of cultivated oil
Sales market: Aktobe region
Planned annual processing volume: up to 1 000 tons
Project location: industrial zone "Aktobe"
The total cost of the project: 1,8 mln. USD
The amount of investment: 1,8 mln. USD
Type of required investment: loan and equity financing,
leasing, leasing
The estimated duration of the project: 2016
The current status of the project: a feasibility study on the
development stage, the project is innovative
Regeneration of waste oils
68
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Possible state support:
1. Land plot with industrial infrastructure in the
industrial zone "Aktobe";
2. Subsidizing the interest rate on the loan;
3. Support of the project through the investor
services center ("one window").
Project initiator: LLP "Aktobe Topsy"
The shareholders of the project initiator: resident of the
RK
Product: stekloobmyvayuschee agent, antifreeze agents
Sales market: Aktobe region
Planned annual processing volume: up to 3 000 tons
Project location: industrial zone "Aktobe"
The total cost of the project: 1 mln. USD
The amount of investment: 1 mln. USD
Type of required investment: loan and equity financing,
leasing, leasing
The estimated duration of the project: 2016
The current status of the project: a feasibility study on the
development stage
Antifreeze, chemical reagents
69
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Possible state support:
1. Land plot with industrial infrastructure in the
industrial zone "Aktobe";
2. Subsidizing the interest rate on the loan;
3. Support of the project through the investor
services center ("one window").
Project initiator: LLP "Ulan Kompaniyasy"
The shareholders of the project initiator:
LLP "Adilet Gasyr"
LLP "SRI" Batysekoproekt "
Product: metal, concrete products, concrete, asphalt,
bridge cranes
Raw material: metal - Kazakhstan, cement - Russia,
bulk materials - Local
Sales market: the Republic of Kazakhstan, the Russian
Federation
The planned annual production:
Metal - 500 thous. tons
Reinforced concrete - 100 thousand cubic meters.
Ready-mixed concrete - 438 thousand cubic meters.
Asphalt concrete - 219 thousand. tons
Project location: industrial zone "Aktobe"
The total cost of the project: 2 284 mln. Tenge
The amount of investment: 2 284 mln. Tenge
Type of required investment: loan or equity financing,
leasing
The estimated duration of the project: 2016
The current status of the project: equipment was
purchased for 0.5 bln. Tenge,
Provided state support:
1. The infrastructure of the industrial zone
2. Credit Program "Ondiris-2"
3. Support of the project through the investor
services center ("one window").
Possible state support:
1. Land plot with industrial infrastructure in the
industrial zone "Aktobe";
2. Subsidizing the interest rate on the loan;
3. Support of the project through the investor
services center ("one window").
Construction materials and overhead cranes
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
70
Project initiator: LLP «HSE Consulting Group»
(operating production)
The shareholders of the project initiator: residents of
the Republic of Kazakhstan
Product: parts of sectional centrifugal pumps,
asynchronous motors, drive sucker rod pumps
Raw material: metal rolling of the Republic of
Kazakhstan
Sales market: oil and gas, industrial, agricultural sectors
The planned annual production:
100 thousand units of products
Project location: rented plant in Aktobe city with all the
infrastructure
The total cost of the project: 400 thous. USD
Type of required investment: loan, equity participation
The estimated duration of the project: 12 months
The current status of the project: the main hall with a
small range of products is put into operation. Major
equipment suppliers Company «DEG»
The modernization of metal products plant
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
71
Possible state support:
1. Subsidizing the interest rate on the loan;
2. Support of the project through the investor services
center ("one window").
Project initiator: LLP "JBI-30" (current production)
The shareholders of the project initiator: resident of the
Republic of Kazakhstan
Product: sulphate cement brand of M400 to M800 on the basis
of industrial waste production (blast furnace slag)
Raw material: slag disposal Karaganda metallurgical plant, lime
plants of Aktobe region
The planned annual production:
25,920 tons of cement
5200 tons of lime
Sales market: the Republic of Kazakhstan, the CIS countries
Project location: Shalkar city
The total cost of the project: 595 million Tenge
Type of required investment: loan and equity financing,
leasing, leasing, refinancing the existing loan
The estimated duration of the project: 2016
The current status of the project: all required infrustructure is
built
Cement and lime production
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
72
Possible state support:
1.Support of the project through the investor
services center ("one window").
Project initiator: IE "Nurgaliyev KE" operating
enterprises
Product: bricks, concrete blocks, paving stones
The planned annual production:
From 500 thousand. units up to 6 million. units
Project location: the city Alga
The total cost of the project: 292 million. Tenge
Type of required investment: loan or equity
financing, leasing
The current status of the project: operating
enterprises with all necessary infrastructure
Manufacture of bricks
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
73
Possible state support:
1. Support of the project through the investor services
center ("one window").
Project initiator: LLP «Accent Logistics»
Product: Reconstruction of transport logistic center to
shopping area
Area: 5017 m2
Project location: Aktobe city
The total cost of the project: 341 million. Tenge
The amount of investment: 256 million. Tenge
Type of required investment: loan financing
The estimated duration of the project: II quarter of 2016
The current status of the project: operating TLC with indoor
railroad deadlock 434 m., parking for 500 cars, the complex
includes three terminals of "A" grade with area of -16 700 sq
m, with a capacity of -20 500 pallets
Reconstruction of transport logistic center
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
74
Owner: LLP "MTS Tractor"
Product: Tractor "Uralets" (160, 180, 220), mini
tractor «JINMA» (164, 200, 204, 240, 244, 354),
mounted potato, Potato-row sprayer, plow and other
depleted.
The planned annual production: 500 pieces of
equipment
Project location: Aktobe city
The total cost of the project: 0,7 mln. USD
The amount of investment: 0,7 mln. USD
Type of required investment: loan and equity
financing, leasing, leasing
The estimated duration of the project:
II quarter of 2016
The current status of the project: the design phase
We have 0.56 hectares of land plot, additional
workshop with metal-cutting equipment, 6 valve
blocks
Production area - 4500 m2 (private warehouses)
Metal fabrication and assembly of mini tractors
75
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Project initiator: LLP "Center-BVR" LLP "Samruk Service 2011"
The shareholders of the project initiator: resident of the Republic of
Kazakhstan
Product: patronize emulsion explosives.
Replaces TNT (explosives safer option).
Raw material: ammonium nitrate LLP "KazAzot" diesel of
"KazMunay-Gas", emulsifier - Corporation «Lubrizol» France
Sales market: Kazakhstan
The planned annual production: 5 th. Tons
Project location: Khromtau (80 km to the Aktobe city)
The total cost of the project and The amount of investment: 600
million. Tenge
Type of required investment: loan or equity financing
The current status of the project: feasibility study and detailed
design of auxiliary facilities ready
Possible state support:
1.Support of the project through the investor services center ("one
window").
Emulsion explosives
76
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Project initiator: LLP "Center-BVR" LLP "Samruk Service 2011"
Shareholders of the project initiator:
TOO Paris CA-KAZ (Switzerland)
TOO NPP explosion Institute of Technology
Product: Emulsion matrix is a viscous plastic mass
Raw material: ammonium nitrate from LLP "KazAzot"
diesel from JSC "KazMunay-Gas"
emulsifier from Corporation «Lubrizol» France
Sales market: Kazakhstan
The planned annual production: 15 000 - 20 000 tonnes
Project location: Khromtau (80 km to the Aktobe city)
The total cost of the project and The amount of investment: 1,7 mln.
USD.
Type of required investment: debt or equity financing
Commissioning - 2016
The current status of the project: feasibility study and detailed
design of auxiliary facilities ready
Possible state support:
1.Support of the project through the investor services center ("one
window").
Basic components for emulsion explosives
77
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Household chemicals
Project initiator: LLP "Burtas"
current production
The shareholders of the project initiator: resident of
the Republic of Kazakhstan
Product: hydroxide and sodium hypochlorite (most
frequently used chemical elements)
Raw material: salt - Araltuz (Kyzylorda region)
Russolo (Russia)
Sales market:
Petrochemicals - deposits of Aktobe region
household chemicals - RK
The planned annual production:
3000 tons of sodium hydroxide
3000 tons of sodium gopohlorida
Project location: n. Sazdy (80 km. From the Aktobe city)
The total cost of the project and amount of
investment: 400 thousand. USD
Type of required investment: loan (100%) or
equity financing
The estimated duration of the project: 12
months
The current status of the project: operating at
low power
78
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Prospective projects
Project initiator: Akimat of the Aktobe region
Products: soda ash
Capacity: up to 400 000 tons per year.
Raw material base: there is rock salt, limestone, gas, electricity, water
Import - ammonia, sodium
Market: сhemical and oil and gas companies of Aktobe region annually consume
up to 140 000 tons of these products.
Advantages: availability of raw materials, low gas prices, convenient transport
logistics in the region, the absence of analogous production in Kazakhstan
Possible measures of state support: provision of land, co-financing of equity
capital
Production of soda ash
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
80
1. Name of the project: «Construction of a mining and processing plant for the
extraction and processing of lime first grade»
2. Raw material base: available
3. Potential market: in Kazakhstan today is not mined lime first grade are
expected to import replacement products
4. Production Release: lime with high activity, receiving concomitant calcium
carbonate
5. Current situation: has explored a rich deposit of lime with high added value
6. Advantages: no similar production, it would be the first mining company
7. Possible measures of state support: investment subsidy - up to 30%
return of investment for construction, installation and equipment, free attraction
of foreign labor, co-financed the project, support of the project through the
Investors Service Centre ("single window"), the direct negotiations for the right
of subsoil use (without competition), building infrastructure
Production of lime
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
81
1. Project: «Production of ceramic tiles»
2. Raw material: availability of raw materials for the production of ceramic tiles
(clay, quartz, carbonate deposits)
3. Potential demand market: Aktobe region, Kazakhstan, Russia
4. Product: ceramic tiles
5. Current situation: there is a ready industrial infrastructure, a rich deposit
explored by clay, quartz, feldspar and carbonate
6. Advantages: optimal location of Aktobe region, the development of transport
and logistics network (road and railway)
7. Possible measures of state support: providing the company with industrial
infrastructure, co-financing the project, support of the project through the
Investor Service Center ("single window"), the direct negotiations for the right
of subsoil use (without auction)
Production of ceramic tiles
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
82
Recycling tires for the production of crumb rubber
1. Project: «Construction of the plant for processing used tires and other rubber
products and the production of rubber crumb»
2. Raw material: raw material in the production of crumb rubber is worn out car tires
with metal and textile cord, tire diameter up to 1.2 m., the waste rubber products
3. Potential demand market: developers; manufacturers of sports flooring;
manufacturers pavements based modifier with crumb rubber; manufacturers of rubber
products, companies serving the oil industry
4. Product: processing up to 3,000 tonsof tires per year and produce up to 1,800 tons
of crumb rubber. 8349 million. tenge (330 thousand. USD) - the acquisition of the line
and deployment costs of production
5. Current situation: ready industrial infrastructure, a rich deposit explored by clay,
quartz, feldspar and carbonate
6. Advantages: a large number of vehicles
7. Possible measures of state support: co-financing of the project, investment
preferences, support for the project through the investor service center ("single
window“)
83 Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
1. Project: «Construction of CHP» «Construction of gas turbine power plant»
2. Raw material:
- natural gas,
- lignite (calorie to 7000 Kcal/kg and ash content of 21%-38%, proven reserves
of 2,5 bln. tons)
3. Potential demand market: the population and enterprises of Aktobe
4. Product: thermal energy and electricity
5. Demand:
- shortage of electricity up to 300 MW
- construction in Aktobe 13 districts with the heat load within 650 Gcal/h
6. Possible measures of state support: heat energy consumption guarantee,
investment preferences, support for the project through the investor service
center ("one window“)
Production of electricity and heat
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
84
Renewable energy
1. Project: «Establishment the centers of wind energy and solar energy»
2. Raw material: the large average annual duration of sunshine in comparison
with other regions (about 2 000-3 000 hours), constant windy flows
3. Potential demand market: Aktobe and Aktobe region
4. Product: electricity generated from renewable energy sources
5. Current situation: the market of renewable energy is studied in detail, there
are vacant land to accommodate renewable energy
6. Advantages: increased consumption of electricity, fixed tariff approved by
the Government of Kazakhstan, the long term operation of the equipment, the
green economy
7. Possible measures of state support: provision of land, enabling
connection to the power grid, co-financing the project, support for the project
through the investor service center ("single window")
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
85
1. Project: «Construction of transport and logistic centers»
2. Места размещения бизнеса: Aktobe, along the international highway "Western
Europe-Western China "
3. Potential demand market: Aktobe and Orenburg region (Russia)
4. Size of the potential market: more than 10 thous. cars and trucks per day
5. Current situation: the length of the highway through on territory of the country is
2787 km, the length of the Aktobe region is 628 km. Highway "WE-WC" functions
6. Advantages: international highway, a huge potential to increase the flow of cars
and trucks
7. Possible measures of state support: interest rate subsidies, settlement
infrastructure, service support for project
Construction of transport and logistic centers
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
86
1. Project: «Construction of the campsites, service centers
along the highway “Western Europe - Western China“ and
other international highways»
2. Business placements: - international highway "Western
Europe-Western China" (the length by Aktobe region - 628
km.)
a) from Martuk District to Khromtau District - 5 facilities
(category A or B);
b) Irgiz region - 4 projects (category B or C).
c) Aktobe, Atyrau (from 2016) Category A - hotel, restaurant/café, around the clock bar, shop, public restrooms warm, gas
station, parking lot paved, car service, tourist bureaus, medical center
Category B - bed and breakfast, restaurant/cafe, shop, public restrooms warm, public showers,
gas station, parking lot paved, car service, tourist information point, a medical center
Category C - store point of public power, public toilets are warm, public showers, gas station,
parking lot paved, workshop or overpass
- international route "Shymkent-Samara" (684 km.);
-republican highway "Aktobe - Atyrau" (319 km.).
- 3. Size of the potential market: more than 10 thous. cars
and trucks per day;
4. Current situation: the length of the highway through on
territory of the country is 2787 km, the length of the Aktobe
region is 628 km. Highway "WE-WC" functions
5. Advantages: international highway, a huge potential to
increase the flow of cars and trucks
Construction campsites
along the highway "Western Europe - Western China"
Possible measures of state support:
1. Provision of land
2. Camsites of the category «A» settlement
infrastructure
3. Co-financing of the project category «A»
4. Subsidized interest rate of bank loan
5. Loans guaranteed
6. Support the project through the investor service
center («single window»)
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
87
1. Project: «The construction of hotel complexes in the city of Aktobe with
recreational and entertainment complex for middle and upper price segment»
2. Business placements: Aktobe city
3. Potential customers: business leaders and business people from Kazakhstan,
Russia, Turkey, China, Europe and the US
4. The potential size of the market in Aktobe: the average occupancy rate of hotel
rooms is about 30-35%
5. Current situation: the number of non-resident visitors arriving in Kazakhstan is
growing by an average of 20% annually, since 2010, 2013 y. figure increased by
almost 70%, reaching 6,8 million people, Kazakhstan`s key visitors - businessmen,
investors and business people
6. Advantages: the prospect growth of Aktobe agglomeration (the center of the
western part of Kazakhstan) to 1,3 million. man until 2020, industrial and
manufacturing center of Kazakhstan, the presence of large companies with foreign
capital (year-round flow of foreigners and business customers)
Hotels 4*-5*
7. Possible measures of state support: providing the land for free charge, subsidization of interest rate, settlement
infrastructure, service support for project etc.
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
88
1. Project: «The center of deep processing of wool and leather the small cattle
and cattle»
2. Raw material: 1 140 thous. sheeps;
443 thous. cattles;
164 thous. goats (on 01.08.15y.)
3. Potential demand market: Aktobe and western regions, the nearby cities of
Russia
4. Потенциальный объем рынка в РК: more than 6 bln. tenge (equivalent
20 million.USD)
5. Current situation: Aktobe region and in the nearby regions of Kazakhstan
no have production of light industry, cattle hides and wool of small cattles are
not processed in a sufficient amount, also the region continental climate in
hides of cattle is a thick, small cattle wool generally rude, which great value in
Italy and China
6. Advantages: no enterprises for processing of wool and hides in the region
and a reliable raw material base (livestock and food supply), a wide range of
products
Deep processing of wool and leather the small cattle and cattle
7. Possible measures of state support: subsidization of lending rate, support for the project through the investor
service centre ("single window"), building infrastructure etc.
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
89
1. Project: «Creating of universal meat plant for deep processing of meat cattle and
small cattle»
2. Raw material: 1 140 thous. sheeps;
443 thous. cattles;
164 thous. goats (on 01.08.15y.)
3. Potential demand market: Aktobe region, western and northern regions, the
nearby cities of Russia
4. Size of the potential market: Kazakhstan produces more than 970 tho. tons of
meat, that shows a man of 57 kg., at a rate of 67 kg of meat person/year currently.
The potential volume of the meat market of Kazakhstan is 170 tho. tons of meat per
year, also Russian market
5. Current situation: in region process more than 63,9 thous. tons of meat, and no
focus on deep processing of meat cattle and small cattle in the territory of Aktobe
region and in the nearby western regions of Kazakhstan, the potential market is
guaranteed (the population of Russia), and there are 3 large and 5 medium feedlots
with a total capacity of 17 000 skotomest
6. Advantages: non-availability of large meat plants in the western region, a reliable
raw material base (livestock), optimal access to the Russian market (7 Russia cities
millionaires in a radius of 1 000 km.) in road/rail transport
Center for deep processing of meat cattle and small cattle
7. Possible measures of state support: subsidization of lending rate and meat production by the program "Agribusiness
2020", support for the project through the investor service centre("single window"), building infrastructure etc.
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
90
1. Project: «Construction of poultry meat»
2. Raw material: region has sufficient agricultural land to grow feed for the birds
(grain forage, wheat, barley), number of birds is 1 296 tho. (01.08.15y)
3. Potential demand market: Aktobe region, western and northern regions, the
nearby cities of Russia
4. Size of the potential market: consumption of poultry meat in Kazakhstan is more
than 278,6 thous. tons per year, where about 51% is imported (the main
suppliers: Brazil, USA, Ukraine), the demand for poultry meat (import
substitution) in Kazakhstan more than 143 thousand. tonnes. per year
5. Current situation: the main producers of poultry meat located in - Almaty, East-
Kazakhstan and Karaganda region, the western region of the country is partly a
net importer
6. Advantages: the western region of Kazakhstan not have chicken meat plants, an
additional raw materials base, optimal access to the Russian market (7 cities
millionaires Russia is in a radius of 1 000 km.) by road/rail transports
7. Possible measures of state support: investment preferences, subsidies for
operating and capital expenditures, service support of the project, infrastructure
building, etc
Construction of poultry meat
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
91
1. Project: «Creation of the center for preparation of feed for poultry»
2. Raw material: region has sufficient agricultural land to grow feed for the birds
(grain forage, wheat, barley), the sown area of 513 hectares (321 hectares of crops,
oilseeds - 34 thousand hectares and others)
3. Potential demand market: RK
4. Size of the potential market: annual demand for grain forage: wheat - 573 ths.
tons, barley - 58 thousand. tons, corn - 64 ths. tons
5. Current situation: field fodder production for birds in general is absent, private
households share in animals and birds about 90%, forage production is based mainly
on hay for the winter with natural grasslands and pastures located near villages
6. Advantages: absence of feed for poultry databases, undeveloped pastures
7. Possible measures of state support: subsidize credit rates; costs of drip
irrigation, cultivation and production of feed grain on the program "Agribusiness
2020", the provision of farmland, support for the project through the investor service
center ("one window"), infrastructure building etc.
Creation of the center for preparation of feed for poultry
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
92
1. Project: «Creation of dairy farms on deep processing of milk»
2. Raw material: 443 thos. cattle
3. Potential demand market: regions needs in dairy products is more than 215
thousand. tons per year, to ensure its own production amounts to 43%, and
own dairy products are not provided with the western regions of Kazakhstan
4. Current situation: more than 80% of milk produced in Kazakhstan -
production of private farms, Kazakhstan`s need in milk and dairy products is
more than 5 753 thous. tons per year, where the share of imports is 78%, local
production is only 22%
5. Advantages: sufficient food supply, pasture and the number of cattles,
convenient transport logistics
6. Possible measures of state support: subsidizing the cost of processing
enterprises to purchase raw materials. "Agribusiness 2020" - subsidizing the
difference between the price at which manufacturers can profitably sell raw milk
and the price at which processors can be profitable to buy. From the RB will be
allocated 60 billion. KZT up to 2020y.
Centres for deep processing of milk
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
93
Growing sturgeon
1. Project: «Growing of sturgeon in the installation of a
closed water supply» - sturgeon: 60 tons/year, caviar: 2 tons /
year at approximately cost of 3.5 mln. USD
2. Raw material: the cheapest gas in the necessary volume,
availability heat from urban CHP, operating production
facilities (ARBZ - 35Gkall)
3. Potential demand market: RK, Russia
4. Size of the potential market: population need in the meat
of fish per person is 14,6 kg or approximately 272 th. tons per
year, imports more than 30 mln. USD (frozen and canned fish
)
5. Current situation: Aktobe region imported to 80% of the
breed fish
6. Advantages: the absence of a local producer, the
presence of heat and water, government support, the transit
potential of the region, etc.
7. Possible measures of state support: investment
preferences, subsidies for operating and capital expenditures,
service support of the project, etc.
94
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
1. Project: «Construction of the greenhouse complex for year-round cultivation of
flowers (creating a winter garden)»
2. Raw material: the cheapest gas in the necessary volume, availability heat from
urban CHP, operating production facilities (ARBZ - 35Gkall)
3. Potential demand market: Aktobe and western regions of the country (Atyrau,
Aktau), the cities of Russia (7 cities millionaires Russia is in a radius of 1 000 km)
4. Size of the potential market: flower market`s volume is more than 100 mln. USD
per year, and kazakhstan flower companies provide market only 30-35%, shortage
covers imports (about 65-70 mln. USD per year)
5. Current situation: the city and the whole region don’t have flower greenhouses.
The main buyers of flowers in the country are residents of Almaty and Astana, which
account for about 70-80% of total sales, in the long term growth is expected in
Aktobe, Atyrau and Aktau
6. Advantages: the gas in necessary volume at reduced prices (compared with other
regions), free heat from the CHPs, most average duration of sunshine days per year
in the country (about 2 000-3 000 hours)
7. Possible measures of state support: provision of land in the form of in-kind
grant. Interest rate subsidies, fertilizers up to 50% reimbursement of costs for
equipment, subsidies for the cultivation of land, service support of the project.
Subsidized by using drip irrigation or rain, etc
The greenhouse complex on the cultivation of vegetables and fruits
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
95
1. Project: «Construction of the greenhouse complex for year-round cultivation of
tomatoes, cucumbers, fruit»
2. Raw material: the cheapest gas in the necessary volume, availability heat from
urban CHP, operating production facilities (ARBZ - 35Gkall)
3. Potential demand market: Aktobe region and western regions of the country
(Atyrau, Aktau, Uralsk)
4. Size of the potential market: in country volume imports of vegetables in 2014
amounted to 500,7 ths. tons, or in terms of money 246 mln. USD, also the provision
of our own vegetables is about 30%
5. Current situation: areas with a minimum gross collection of vegetables and
potatoes are Mangistau, Atyrau, Aktobe region. Greenhouses area in Aktobe is 9.7
hectares
6. Advantages: the gas in necessary volume at reduced prices (compared with other
regions), free heat from the CHPs, most average duration of sunshine days per year
in the country (about 2 000-3 000 hours)
The greenhouse complex on the cultivation of vegetables and fruits
7. Possible measures of state support: provision of land in the form of in-kind grant.
Interest rate subsidies, fertilizers up to 50% reimbursement of costs for equipment,
subsidies for the cultivation of land, service support of the project. Subsidized by using drip
irrigation or rain, etc
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
96
Production of canned
fruits and vegetables 1. Project: «Production of canned fruits and vegetables by
technological preparation of raw materials, bookmarks in a
container and its seal with the subsequent heat treatment»
2. Raw material: Aktobe regions resource potential is up to 1
mln. tons of fruits and vegetables per year
3. Potential demand market: Aktobe region and western regions
of the country (Atyrau, Aktau, Uralsk)
4. Size of the potential market: the share of imports in
Kazakhstan is more than 45% of the total market share, which
indicates good prospects for the development of domestic
production
5. Investment offer: with an investment of 10 mln. USD
(approximately) – possible capacity of production to 50 000
tonsof finished products/year
6. Advantages: the transit potential of the region, own production
deficiency in the western regions of the country, population
growth
7. Possible measures of state support: provision of land in the
form of in-kind grant. Interest rate subsidies, reimbursement of
costs for equipment, support of the project through the investor
service center ("single window"), investment preferences and
etc.
97
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Production of fruit and vegetable juices 1. Project: «Processing vegetables and fruit juice
concentrates and pouring juice» (pumpkin, carrots, tomatoes,
apples, pears, etc.)
2. Raw material: Aktobe regions resource potential is up to 1
mln. tons of fruits and vegetables per year
3. Potential demand market: Aktobe region and western
regions of the country (Atyrau, Aktau, Uralsk)
4. Size of the potential market: the share of imports in
Kazakhstan amounts to 40% of the total market share, which
indicates good prospects for the development of domestic
production
5. Investment offer: with an investment of 15 million. USD
(approximately) – possible capacity of production to 20 000
tons of concentrates of carrot, pumpkin, tomato, apple juice,
a variety of natural juices and juice drinks
6. Advantages: the transit potential of the region, own
production deficiency in the western regions of the country,
population growth
7. Possible measures of state support: provision of land in
the form of in-kind grant. Interest rate subsidies,
reimbursement of costs for equipment, support of the project
through the investor service center ("single window"),
investment preferences and etc.
98
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Construction of vegetable stores
1. Project: «Construction of modern vegetable stores, ensure
reliability and a long shelf life fresh vegetables»
2. Raw material: Aktobe regions resource potential is up to 1 mln.
tons of fruits and vegetables per year
3. Potential demand market: population and processors of
Kazakhstan and neighboring countries
4. Size of the potential market: imports of vegetables in the country
is over 501 ths. tons per year, which require modern and upgraded
storage in winter and summer
5. Current situation: Kazakhstan has more than 395 vegetable
stores, the total storage capacity of which is 267 tho.. tons, but due to
lack of storage capacity, Kazakhstan imports fruits and vegetables
during the winter and spring, and vegetable stores are mostly located
in the southern regions of the country
6. Advantages: extensive state support (subsidies CAPEX costs up
to 30%), lack of competition and the storage not only in Aktobe
region, but also in other Western regions of the country
7. Possible measures of state support: provision of land in the
form of in-kind grant. Interest rate subsidies, reimbursement of costs
for equipment, support of the project through the investor service
center ("single window"), investment preferences and etc.
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
99
Production of baby food
1. Project: «Production of baby food in eco friendly
containers»
2. Raw material: Aktobe regions resource potential is up to 1
mln. tons of fruits and vegetables per year
3. Potential demand market: Kazakhstan and CIS countries
4. Size of the potential market: the baby food market
capacity is more than 30 mln. USD pear year. Demand of
Kazakhstan in baby food completely covered by imports from
foreign countries
5. Investment offer: with an investment of 15 million. USD
(approximately) – possible capacity of production - 17 800
tons of raw material processing or 12 283 tons of final
products per year
6. Advantages: the transit potential of the region, own
production deficiency in the country, population growth
7. Possible measures of state support: provision of land in
the form of in-kind grant. Interest rate subsidies,
reimbursement of costs for equipment, support of the project
through the Investor Service Center ("single window"),
investment preferences and etc.
100
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]
Production of dried &
deep frozen fruits and vegetables 1. Project: «Production of deepfreezing dried fruits & vegetables»
(dried fruits, candied fruits, range of dried vegetables, cutting frozen
vegetables, berries and frozen fruit, etc.)
2. Raw material: Aktobe regions resource potential per year is up to 1
mln. tons of fruits and vegetables.
Potential suppliers of raw materials are also the South-Kazakhstan
region, as well as the next CIS countries: Kyrgyzstan, Uzbekistan and
Tajikistan
3. Potential demand market: Aktobe and western regions Kazakhstan
(Atyrau, Aktau, Uralsk)
4. Size of the potential market: Kazakhstan and CIS countries
5. Investment proposal: with an investment of 10 million. USD
(approximately) the possible production capacity to 40 000 tons of
range final products per year
6. Advantages: the transit potential of the region, deficiency in the
production of western regions, population growth. Most of these
products come from southern regions of Kazakhstan
7. Possible measures of state support: provision of land in the form
of land grant. Interest rate subsidies, fertilizers up to 50%
reimbursement of costs for equipment, subsidies for the cultivation of
land, service support of the project. Subsidized by using drip irrigation
or rain, etc.
101
Investor service center: 8-701-036-40-40, 8-777-036-40-40, 8-705-820-07-17, e-mail: [email protected]