YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: installing bamboo and timber benchtops · 2015-12-11 · 600mm 600mm 100mm 100mm Space evenly between outer Min hole holes diameter 35mm Hole set back from cut edge 20mm 10mm Determine

60

0m

m

600mm

100mm

100mm

Space evenly between outer holesMin hole

diameter35mm

Hole set back from cut edge 20mm

10mm

Determine cutting location of the blade

?

step 4Finish off your Kaboodle Kitchen by installing your benchtop.

installing bamboo and timber benchtops

Things you need to know

• Colourvariationsmayoccurwithourbambooandsolid

timbersastheyareallnaturalproducts.Thisispartofthe

naturalbeauty.

• Pleasecheckthecolourandfinishofyourbenchtopbefore

youstartcuttingyournewworkspace.Benchtopscannotbe

returnedorexchangedoncetheyhavebeencut,modified

orinstalled.

• Bothrawsurfacesandanyexposededgesorcutouts

ofthebenchtopmustbesandedandsealedpriortouse.

Applicationofcoatingshouldbeappliedaccordingto

themanufacturer’sinstructions.

• Waterandsubstancesshouldbecleanedfromthebenchtop

assoonaspossible.Anyspillagesmaycausediscolouration

• Neverplacehotitemsdirectlyontoyourbenchtopasthis

willcausedamagetothesurface.

• Nevercutdirectlyontoyourbenchtopasthiscouldcreate

finescratches.

• AlwaysremembertousePersonalProtectionEquipment

whencuttingandinstallingyourbenchtops.

• Thesearenaturalproductsanditisnormalforthem

tobowupwardontheedgesalittle,ifstoredoveraperiod

oftime.Simplyturnthebenchtopoverandlayonitsface

untilitisflatoncemore.

• Allsurfacesmustbesealedwithatleast2coatsofyour

choiceofsealerbeforeuse.

C

14mmwoodscrews

B

28mmwoodscrews

A

Hardware needed

90°anglebracket

Note:Fixinghardwarerequiredisprovidedwiththecabinets.

Clamps(quickrelease)

Caulkinggun

Jigsaw

Benchtopjoiners

Utilityknife

10mmchisel

30-40mmboreorspadebit

Circularsaw

Pencil

Rubbermallet

TapeMeasure

Lowadhesionmaskingtape

Personalprotectionequipment(ppe)

10mmopenendspanner

Cordlessdrillwith:

• Number2screwtip

• 4mmdrillbit

• Number12countersinkingdrillbit

Spiritlevel(900mmrecommended)

Tools you will need ToinstallyourKaboodlebenchtops,youwillneedthefollowingtools.

Exteriorwoodglue(PVA)

Finetoothwoodsaw

preparing for benchtop joins

1.

Ontheundersideofthebenchtop,measureandmarkastraightline20mminfromtheedgeofthebenchtop.Thislineindicatestheedgepositionoftheboreholesforthejoiners.

Measureandmark100mmfromtheedgeofeachbenchtop.Measurethespacebetweenthetwomarksanddivideby2togiveyouthepositionofthemiddlebenchtopjoiner.

Sealing the Benchtop: Beforestartingensureallsurfacesaresandedandsealedimmediatelyafteropeningthepackaging.Resealanyareacutwithatleast2coatsofsealerpayingspecialattentiontotheendgrainsincutouts.

Note: Beforestartingtoinstallyourbenchtopitisnecessarytodecideonwhichsideofyourbenchtopwillbefacingupwards.Eachsidewillhavedifferentnaturalcharacteristicsandfeatures.

Important:Itisrecommendedthatyouusetheassistanceofasecondpersontosecurethebenchtopandhelpsupporttheoffcutduringthecuttingprocess.AlwaysusePPEwhenemployingpowertoolsanden-sureallsafetyprecautionshavebeentaken.

Setthedepthofthecircularsawbladetoapproximately10mmdeeperthanthethick-nessofthebenchtop.Theblademustbeatarightangletothebaseplate.Thiswillpro-videaverticalcut.

Cutthebenchtopwiththecir-cularsawmakingsureyoukeepthebaseofthesawagainstthestraightedge.

2.1. 3.

Measurewhereyouwillbecuttingandscribethebenchtopwithasharpknife.Thiswillreducechippingwhencutting.

Turnthebenchtopoversotheundersideisfacingupwardsandagainscribeusingasharpknife.

Clampastraightedgeparalleltothemarkedline.Todothisyouwillneedtodeterminethecorrectpositionofthestraightedgedependingonthemodelandmakeofthechosencircularsaw.

cutting the benchtop

Note: Workrequiredtostraighten/levelwallsshouldbecompletedbeforethekitchenhasbeeninstalled.However,oncebenchtopsarejoined,thebackedgescanbeplanedortrimmedslightlytosuit.Tiles/splashbacksandsiliconewillhidesmallgapsandinconsistenciesbetweenwallsandbenchtops.

Cuttingmustbedonewithanew,ornewlysharpenedcarbide-tippedblade,suitableforhardwoodtimbers

Workoutthedistancefromtheedgeofthebaseplatetothebladeofthetool.

Thismeasurementneedstobethesameasthedistancethatyouplacethestraightedge(orguide)fromthecutline.

Tip. Whenclampingontothebenchtopensuretheclampshavesoftjawsorsuitableprotectionisplacedonthesurfaceofthebenchtoptoavoiddamage.

Note:Itisrecommendedthatthesawbladeentersfromthefrontedgeofthebenchtop(thesidethatwillbemostvisibleonceinstalled).

p. 1Ver.15

Page 2: installing bamboo and timber benchtops · 2015-12-11 · 600mm 600mm 100mm 100mm Space evenly between outer Min hole holes diameter 35mm Hole set back from cut edge 20mm 10mm Determine

5mm

5mm

20mm

20mm

5mm5mm

finishing your benchtop

1.3.

Usingafinetoothwoodsawandachisel,createa10mmwidechanneltojoineachopposinghole.Thechannelmustbethesamedepthastheboreholes.

A

hard

ware

key

ste

p 4 CB

14mmwoodscrews

90°anglebracket

28mmwoodscrews

installing timber benchtops

Finallookoncecutout

2.

installing benchtops

Measureandmarkthecutoutsfortheappliancesorsinkusingthemanufacturersproductspecifications.

Tip. Applylowadhesivemask-ingtapearoundtheoutsideofthecutouttoreducebenchtopsplintering.

Theundersideofthebenchtopandanycutoutsneedtobefullysealedusingyourchosencoating.Thisisbestdonebeforeinstallingthebenchtopintoyourkitchen.

Fixthebenchtoptothebackofthecabinetusingthe90degreeanglebracketsand14mmscrews.Fixthesupportrailusingthe28mmscrewsthroughintothebenchtop.

Itisrecommendedtodrillanelongatedholeonthesupportrail.Thiscanbeachievedbydrilling2x5mmholessidebysideandusingthedrillinaswayingmotiontojointheholes.Thiswillallowfornaturalexpansionandcontractionofthetimber.

1. 2. 3.

OncethePVAgluehasdried,carefullysandthewholebenchtopusing120gritsandpapertoremoveanygluemarksorunevensurfaces.Finishwithlightlysandingusinga240gritsandpaper.

Coatyourbenchtopwithyourdesiredsealantmakingsuretoreadthemanufacturer’sinstructionsoncorrectapplicationanddryingtimes.

Rememberthatthewholebenchtop,includinganycutouts,mustbecoated.

Applyatleasttwofinishingtopcoatstoyourbecnhtop.

Finishbyapplyingabeadofsiliconebetweenthesplashbackandthebenchtop.

Hint:Youmayneedtopullthebenchtopforwardslightlytoworkonthefrontjoiner.Pushitbackintopositionwhenworkingontheremainingjoiners.Ifthisisnotpossible,drilla50mmholethroughthetoprailofthecabinettoallowaccesstothejoiners.

Biscuits:Whenjoiningbenchtopsyoumaywishtoconsideraddingbiscuits,astheycanassistwiththealigningandreinforcingofthebenchtops.

ToolsNeeded:biscuitjoiner,saw,measuringtape,square,woodglue,spreadingstick

joining to cabinets

Note: Ensureshelvesareinsertedintocornercabinetspriortoinstallingbenchtops.

Note: Sandinanevenmotiontoavoidoversanding.

1.2.

Usinga35mmhingeborebit,drilltoadepthof25mm.Theedgeoftheborebitshouldjusttouchthe20mmlinepreviouslymarked.

Caring for your kaboodle benchtop

Lookingafteryourbenchtopsisreallyeasyandwiththerightcareandmaintenancetheywilllastyouformanyyears.Justfollowthesesimplestepsandifyouneedanymoreinformationyoucancontactusus:Australia:1800 666 078MondaytoFridaybetween8:00amand6:00pmAEST.NewZealand:0800 522 663MondaytoFridaybetween8:00amand5:00pmNZSToremail: [email protected].

Timberbenchtopsareveryeasytokeepcleanandshouldberegularlywipedwithadampclothorspongeusingwarmsoapywateroranallpurpose,non-abrasivecleaningproduct.Neveruseasaturatedclothorsponge,harshchemicalsorthinnerbasedcleanersonyourtimberbenchtop.Avoidsharpobjectsthatmaycut,scratchorgaugethetimberbenchtop.Nevercutdirectlyonthebenchtoporputanyhotpotsorpansdirectlyonthesurface.Thefirstthingyouneedtodowithyourtimberbenchtopissealitwithasuitablefoodpreparationsealantfollowingthemanufacturer’sapplicationinstructions.Don’tforgettosealthewholebenchtopincludingaroundanycutoutsforyoursinkorcooktop.Oncethebenchtopiscoateditiswaterresistantbutnotwaterproof,soalwaystrytoattendtospillsassoonaspossible.Ifatimberbenchtopisdamaged,itcanbesandedandre-coatedwithyourselectedsealant.

Callcustomerserviceon: Australia: 1800 666 078 MondaytoFridaybetween8.00amand6.00pmAEST

NewZealand: 0800 522 663 MondaytoFridaybetween8.00amand5.00pmNZSToremail: [email protected]

Weofferadedicatedcustomerservicelineforadviceoranyquestionsyoumayhaveonkaboodleproducts.

step 1

step 2

step 3

step 4Your Kaboodle kitchen is now complete!

Your Kaboodle cabinet is now complete.

You’ve finished adding your parts and accessories.

You’ve added your doors and panels.

Thebiscuitjoinerisdesignedforcuttingandjoining.Itprovidesanaccurate,effectivemeansofjoiningnaturalwoodormanufacturedbenchtops.Forproperusage,pleaserefertothemanufacturer’sinstructions.

Ifyourbenchtopshavebeenpurchasedwithpre-cutbiscuitslotspleaseskiptostep4.

1.Marklocationofthebiscuitstobegluedbetweenbenchtops.Ensuremarkingsallowforevenspacingbetweenbiscuits.Asageneralrule,biscuitsshouldbeequallyspacedbetweenboreholes,withthefirstbiscuitslotinsertedbetweenthefrontedgeofthebenchtopandthefirstborehole.

2.Cutbiscuitslotswiththebiscuitjoiner(refertomanufacturer’sinstructions).Ensurethebenchtopisproperlysecured,asconsiderableforceisrequiredtopushthebladeintothebenchtop.

3.Removeanysawdustanddebrisfrombiscuitslots.

4.Aftercuttingthebiscuitslots,itisbesttotrialjoinbiscuitstoensureproperfitbeforegluing.

Placethebenchtopsintopositionwiththetopsidesfacingupward.Liberallyapplyexteriorwoodworkingglue(PVA)tobothfacesofthejoin,ensuringthatbothjoinfacesarecompletelycoveredwithglue.Donotusesilicone.

Pushthe2piecestogether,andstartingfromthefrontofthebenchtopinsertthejoinersintotheholesasshowninthediagram.Alignthetopandfrontedgeofthebenchtoptoensurethatitisevenandflush.Gentlytightenthejoinersuntiltheyholdintopositionwitha10mmopenendspanner.

Tightenthebenchtopjoinersinsuccessionsotheyaresecurewhilstensuringthetopofthebenchtopremainsflush.Youmayneedtogentlytapthetopwitharubbermallettoachieveaflushjoin.

Removeanyexcessgluewithadampcloth.

Note: Donotovertightenbenchjoiners.Overtighteningmaycausethebenchtoptocrack.

p. 2Ver.15


Related Documents