Page 1: HL7 Interface Lifecycle Management at Interconnected Health 2012

Interconnected Health 2012

HL7 Integration: From Trial and Error to Predictable Project Outcomes

April 2012

Page 2: HL7 Interface Lifecycle Management at Interconnected Health 2012

Agenda

• HL7 is flexible• Current approach: trial & error• Proposed new approach: Interface Lifecycle

Management

© Caristix 2012. All rights reserved.2

Page 3: HL7 Interface Lifecycle Management at Interconnected Health 2012

HL7 Specification

Product A

Deployed interface

Product BDeployed interface

HL7 v2.2HL7 v2.3.1HL7 v2.4HL7 v2.5.1HL7 v2.6HL7 v2.7

GAPS:WORK REQUIRED

HL7 is Flexible – No Plug & Play

3 © Caristix 2012. All rights reserved.

Page 4: HL7 Interface Lifecycle Management at Interconnected Health 2012

Gaps: A Few Examples

• Z-segments• User-defined Data Sets

© Caristix 2012. All rights reserved.4

Page 5: HL7 Interface Lifecycle Management at Interconnected Health 2012

Z-segments

© Caristix 2012. All rights reserved.5

MSH|^~\&|SPC|R|ENG|R|200609280101|43|ADT^A08|44859646|D|2.6|44859646||AL||EVN|A08|200609280101||PID||03777168|0001754426^^^R|9960^R17400|REGISTRATION^AMY^^||19601020|F||3|123 BOOGEY AVE^^NICECITY^MN^44444^US^C^25|25|(999)555-9999|(999)555-9999|ENGLISH^E^|M|BAP^^|0627330001^^^R|569-33-8744|NK1|1|REGISTRATION^PAT|B^^|123 BOOGEY AVE^^NICECITY^MN^44444^US|(999)555-6879NK1|2|N^A|T^^|^^^^^|PV1||O|MRIR^^^R^^^|3|||16515^SMITH^JANE^S^^^DO|^REGISTRATION^MIKE^J^^^||IMG||||1||EMP|16515^SMITH^JANE^S^^^DO|OPR^^R|0627330001^^^R|S|||||||||||||||||||R|||||200609280001|||0.00||PV2|||||N|||200609280800||||OPR RAT|||||||||*|||||""|||||||20060928||||||^MRIBRAIN W/O CONTRASTAL1|||^|||DG1|0|I9||HEADACHE||A||||||||DG1|99|I9||HEADACHE||WORKING||||||||GT1|1|9960|REGISTRATION^AMY^^||123 BOOGEY AVE^^NICECITY^MN^44444^US^C^25|(999)555-9999||19601020|F||A|569-33-8744|||1|ZZHEALTH^111|1087 DENNISON AVE^^NICECITY^MN^43201^US^^25|(999)555-9999||1IN1|1|100|800|SELF PAY|^^^^^^C^||||||ZZHEALTH^111^||||C^^|REGISTRATION^AMY^||19601020||||||||||||||||||||||||1|F|1087 DENNISON AVE^^NICECITY^MN^43201^US|IN2||569-33-8744||||||||||||||||||||||||||||ACC|200609241500|3|CLEVELAND AVE/FRANKLINUB1|1|||||||||45^15||||||05^20060924~^~^~^~^|||||||ZCA|||^^^ZCD||N|||^NEW LIFE^||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||^SURGERY CASE NUMBER~^EMSTAT NUMBERZCE|15^SECRETARY^|""|111^ZZHEALTH^|1087 DENNISON AVE^^NICECITY^MN^43201^US^^25||||1||ZCI|1|SELF PAY, NO INSURANCE||S|N|569-33-8744|N||P||||""||||""|||||||||||||||||1ZCV|||||FALL||PDR|0ZCM|N|||||||||*|||||||||||||^REGISTRATION^MIKE^J

Page 6: HL7 Interface Lifecycle Management at Interconnected Health 2012

User-defined Data Sets

© Caristix 2012. All rights reserved.6

Page 7: HL7 Interface Lifecycle Management at Interconnected Health 2012

User-defined Data Sets

© Caristix 2012. All rights reserved.7

Page 8: HL7 Interface Lifecycle Management at Interconnected Health 2012

User Defined Data Sets

© Caristix 2012. All rights reserved.8

MSH|^~\&|SPC|R|ENG|R|200609280101|43|ADT^A08|44859646|D|2.6|44859646||AL||EVN|A08|200609280101||PID||03777168|0001754426^^^R|9960^R17400|REGISTRATION^AMY^^||19601020|F||3|123 BOOGEY AVE^^NICECITY^MN^44444^US^C^25|25|(999)555-9999|(999)555-9999|ENGLISH^E^|M|BAP^^|0627330001^^^R|569-33-8744|NK1|1|REGISTRATION^PAT|B^^|123 BOOGEY AVE^^NICECITY^MN^44444^US|(999)555-6879NK1|2|N^A|T^^|^^^^^|PV1||O|MRIR^^^R^^^|3|||16515^SMITH^JANE^S^^^DO|^REGISTRATION^MIKE^J^^^||IMG||||1||EMP|16515^SMITH^JANE^S^^^DO|OPR^^R|0627330001^^^R|S|||||||||||||||||||R|||||200609280001|||0.00||PV2|||||N|||200609280800||||OPR RAT|||||||||*|||||""|||||||20060928||||||^MRIBRAIN W/O CONTRASTAL1|||^|||DG1|0|I9||HEADACHE||A||||||||DG1|99|I9||HEADACHE||WORKING||||||||GT1|1|9960|REGISTRATION^AMY^^||123 BOOGEY AVE^^NICECITY^MN^44444^US^C^25|(999)555-9999||19601020|F||A|569-33-8744|||1|ZZHEALTH^111|1087 DENNISON AVE^^NICECITY^MN^43201^US^^25|(999)555-9999||1IN1|1|100|800|SELF PAY|^^^^^^C^||||||ZZHEALTH^111^||||C^^|REGISTRATION^AMY^||19601020||||||||||||||||||||||||1|F|1087 DENNISON AVE^^NICECITY^MN^43201^US|IN2||569-33-8744||||||||||||||||||||||||||||ACC|200609241500|3|CLEVELAND AVE/FRANKLINUB1|1|||||||||45^15||||||05^20060924~^~^~^~^|||||||ZCA|||^^^ZCD||N|||^NEW LIFE^||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||^SURGERY CASE NUMBER~^EMSTAT NUMBERZCE|15^SECRETARY^|""|111^ZZHEALTH^|1087 DENNISON AVE^^NICECITY^MN^43201^US^^25||||1||ZCI|1|SELF PAY, NO INSURANCE||S|N|569-33-8744|N||P||||""||||""|||||||||||||||||1ZCV|||||FALL||PDR|0ZCM|N|||||||||*|||||||||||||^REGISTRATION^MIKE^J

HL7 v2.6 suggests “2106-3”

Page 9: HL7 Interface Lifecycle Management at Interconnected Health 2012

A Few Numbers

• 60% of hospitals deal with 100+ systems.• 64% of hospitals increasing HL7 integration

over 12 months.

• In HL7 v2.6:– 370 trigger events– >500 data elements per message– >500 suggested code sets

© Caristix 2012. All rights reserved.9

Sources: HIMSS 2008 survey, Core Health Technologies 2011 survey. HL7 International.

Page 10: HL7 Interface Lifecycle Management at Interconnected Health 2012

Current Approach

Requirements based on:• Manual analysis (pipe counting)• Small data samples• Incomplete and/or outdated

documentation:– Interface specifications– Ecosystem data flow

© Caristix 2012. All rights reserved.10

Page 11: HL7 Interface Lifecycle Management at Interconnected Health 2012

Current Approach: Results

• Low-fidelity, low-trust requirements:– “What is connected here?”– “Which data structures?”– “What is optional in which scenario?”– “Which data sets? From when?”– Are the semantics consistent?”

© Caristix 2012. All rights reserved.

11

Page 12: HL7 Interface Lifecycle Management at Interconnected Health 2012

Current Approach: Results

“Let’s start with a best-guess interface and fix issues when they pop up.”

The Trial & Error loop starts...

© Caristix 2012. All rights reserved.

12

Page 13: HL7 Interface Lifecycle Management at Interconnected Health 2012

Trial & Error Outcomes

• Cannot predict effort, timeline and costs• Cannot evaluate risk• Continue iterating after go-live• Hard to capture and reuse issue discovery

– With Colleagues– With Providers/Client teams

© Caristix 2012. All rights reserved.13

Page 14: HL7 Interface Lifecycle Management at Interconnected Health 2012

Proposed New Approach

© Caristix 2012. All rights reserved.14

Interface Lifecycle Management

Page 15: HL7 Interface Lifecycle Management at Interconnected Health 2012

Interface Lifecycle Management

© Caristix 2012. All rights reserved.15

• Understand gaps early• Work with real-life messages• Predictable• Focus on automation

Page 16: HL7 Interface Lifecycle Management at Interconnected Health 2012

Scoping

• Automate as much as possible• Analyze real life data• Compare sending vs. receiving systems• Gaps found = Tasks

© Caristix 2012. All rights reserved.16

Page 17: HL7 Interface Lifecycle Management at Interconnected Health 2012

Configuration

• Configure your integration engine– Filtering– Transformation– Mapping

• Consider automation based on gaps

© Caristix 2012. All rights reserved.17

Page 18: HL7 Interface Lifecycle Management at Interconnected Health 2012

Validation

• Build reusable and repeatable test scenarios based on gaps

• Automate test scenarios• Run tests in test environment• Include real life data (de-identify if needed)• Refine test scenarios

© Caristix 2012. All rights reserved.18

Page 19: HL7 Interface Lifecycle Management at Interconnected Health 2012

Monitoring

• Keep tracking any gaps that may appear• Refine scoping results, configuration and test

scenarios

© Caristix 2012. All rights reserved.19

Page 20: HL7 Interface Lifecycle Management at Interconnected Health 2012

Evidence-based Decision-making

30-60% Time Savings

© Caristix 2012. All rights reserved.20

Kic

k-O

ff

Ite

r 1

Ite

r 2

Ite

r 3

Ite

r 4

Go

Liv

e

Ite

r 6

Ite

r 7

Ite

r 8

Ite

r 9

Ite

r 1

0

0%

20%

40%

60%

80%

100%

Kic

k-O

ff

Ite

r 1

Ite

r 2

Ite

r 3

Go

Liv

e

Ite

r 5

0%

20%

40%

60%

80%

100%

Known vs. Unknown Gaps through Interfacing Project

Current Approach Proposal

Page 21: HL7 Interface Lifecycle Management at Interconnected Health 2012

Contact Information

Jean-Luc MorinVP R&D, Caristix

[email protected]

April 2012


Related Documents