Prequalification-2013 r10 (07.03.13) 1
GULF LABORATORIES CO. W LL
GULF GEOTECHNICAL SERVICES & MATERIAL TESTING LLC
Prequalification
Gulf Laboratories Co. W.L.L P.O. Box 4024, Doha, Qatar Tel : +974 44607034 / 44607036 Fax : +974 44607628 e-mail : [email protected]
Gulf Geotechnical Services & Material Testing LLC PO Box 515, PC 132 Al Khoudh, Oman Tel : +968 24542255 / 24542552 Fax : +968 24545441 e-mail : [email protected]
Website: www.gulflaboratories.com
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 2
Contents Page No.
COMPANY DETAILS ................................... .................................................................... 3
KEY PERSONNEL ..................................... ...................................................................... 4
EQUIPMENT AND RESOURCES - QATAR ................... .................................................. 5
EQUIPMENT AND RESOURCES - OMAN .................... .................................................. 8
SERVICES – QATAR AND OMAN ......................... .........................................................10
APPENDICES
APPENDIX A CERTIFICATATIONS & ACCREDITATIONS
APPENDIX B ORGANIZATION CHART
APPENDIX C COMPANY EXPERIENCE
APPENDIX D FIELD & LABORATORY TESTING
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 3
Company Details
QATAR
Name of Company : Gulf Laboratories Co. W.L.L
Head Office Address : P.O. Box 4024, Doha, Qatar
Commercial Reg. # : 14419
Nature of Business : Ground Investigations and Materials and Environmental Testing
Established : Mid-1970’s
Owners : Mannai Corporation – Doha
Employees : 201
Office/Laboratory Location : Jct of Street # 2 and Al Kassarat Street
Salwa Industrial Area
Workshop Location : Street 41, Salwa Industrial Area
Petroleum Testing Lab : Ground Floor, Building B2, Manweir Facility
Location Phase 1, Site No. : CB-50, Support Services Area
Ras Laffan Industrial City, Qatar
Tel: (+974) 4433 5313 / 5327 / 5328
MOE Approval Certificate Nos.
Geotechnical / Soil Investigation : No. SI 59
Material Testing Laboratory : No. ML 215
SULTANATE OF OMAN
Name of Company : Gulf Geotechnical Services & Material Testing LLC
Head Office Address : PO Box 515, PC 132 Al Khoudh, Sultanate of Oman
Commercial Reg. # : 1041094
Nature of Business : Geotechnical Investigations and Materials Testing
Established : 2008
Owners : Mannai Corporation & Gulf Laboratories Co. WLL
Employees : 24
Office Location : 273 Al Tameer St., South Mawaaleh
Laboratory Location : Plot 602, Way 4731, Off Al Tameer St., South Mawaaleh
We are certified to ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007 and are accredited to ISO 17025:2005.
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 4
Key Personnel
General Manager : Andrew Slate, BSc, CGeol, EurGeol
Deputy General Manager : Dr. Richard Ellis, Ph.D.
Drilling & Geotechn. Manager : K.P.Abdul Majeed, BSc, MSc
Geotechnical Operations Manager (Oman): Wael Mohd Saleh, BSc, MSc
Laboratory Operations Manager : Thomas Varghese, BSc
Laboratory Operations Manager (Oman) : Marc Penlington, HNC Civil Engg
Senior Geotechnical Staff : M.N. Sananth, MTech
Chief Chemist & Head of : K.M. Arunan, BSc, CChem, CSci, FRSC
Chemical Laboratory
Senior Geologists : Abdul Rahman, BSc, MSc
Durga Bashyal, BSc, MSc
Bal Dhoj Karki, BSc, MSc
Elizabeth Raji John, MSc, BSc
Abdulsadeq Shaaban
Geologists / Engineers Sujin Jayadevan, BSc, MSc
Abdul Jawad, BSc, MSc
Vineeth Nair, BSc, MSc
Gulzar Ansari, BSc, MSc
Nabeel Chakkattayil, BSc., MSc
Suhail Mohammed, BSc., MSc
Senior Chemists/Chemists : 8 nos.
Laboratory Staff : 107 nos.
Physical Lab Supervisor : Nestor Maniti, BS
Chemical Lab Supervisor : Sajeev Yohannan, BSc, MSc
Specialist – Petroleum Chemist : Allan Albino, BS Chem
QHSE Sr. Supervisor : Francis Rey Mercado, BS Chem
QHSE Sr. Officer : Marina Sales, BS ME
Sr. QC Engineer : Allan Nabong, BS CE
HSE Officer/s : Robert Castillo, BS ChE
Mohammad Faisal, BA
Drilling Supervisors : K. Kalimuthu, Orlando Boledo
Drillers & Drilling Assistants : 50 nos.
Other Support Staff : 36 nos.
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 5
Equipment and Resources - Qatar
Drilling Rigs – 6 no. Dual Purpose Truck Mounted Hands England HE-35, Hands England HE-36
Boyles BBS 25, Dando Geotech
2 no. Pilcon Traveller T30 Rigs
Drilling Rigs – 9 no. Dual Purpose Crawler Mounted 1 no. Beretta T44 Rigs, 4 Hanjin P4000SD Rigs. 4no. DESCO SP5500S
Drilling Rigs – Water Well / Geothermal Drilling Ri g 1no. DESCO SP5500S
Drilling Rigs – Cable Percussion Pilcon Wayfarer Light Cable Percussion Rig
Other Plant & Test Equipment Pagani 200T Cone Penetration Rig with Piezocone
Jack-up Drilling Barge “Nautilus” (12m x 6m)
Air Compressors – 250 to 750cfm, Water Bowsers and Water Tanker
Pressuremeter test equipment,
Drilling parameter measurement systems
Ground Penetrating Radar with DGPS
Pile Integrity Testing Equipment
Soil Resistivity Testing Equipment
Thermal Resistivity Testing Equipment
Submersible Pumps, V-Notch Weir Tanks, Pressure Transducer and Dataloggers
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 6
Soil and Aggregate Testing Laboratory
Automatic soil compactor
CBR machine
Slake Durability test machine
Water permeability of concrete testing unit
Sieve set
Electronic balances
Drying Ovens
Asphalt Testing Laboratory Ignition Oven for Binder content
Automatic Marshal Compactor
Marshal Testing machine Cement Testing Laboratory Blaine Air permeability apparatus
Mortar Mixer
Jolting apparatus
Curing Cabinet Chemical laboratory BOD Incubators
Muffle Furnaces
Microwave Digester
HACH spectrometers
Ultra Pure water system
Distillation Apparatuses for Ammonia, TKN and Cyanide
Rotary Evaporator for Oil & Grease test
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 7
Environmental Testing Laboratory
Gas Chromatograph Mass Spectrometer (GCMS)
ICP OES
TOC Analyser
Noise monitoring unit
Microbiological and Drinking Water Testing Laborato ry Bacteria culture Incubator
Microscope
Colony counter
Geotechnical Testing Laboratory Automatic Consolidated Oedometer with data processing system
Digital Shear Testing – Fully Automatic with data processing system
Triaxial system with electric load cell and electronic axial strain transducers
On-site Materials Testing Laboratories Nuclear gauges for In-situ density testing
Concrete & Asphalt core drilling
Plate bearing test equipments
In-situ CBR testing equipments
Petroleum Testing Laboratory (Ras Laffan Annex) Insulating Liquids (transformer oils) and Lube Oils condition monitoring
Fuels Testing, Tests for other Petroleum Products
Equipments/Software:
GC, HPLC, Viscometer, Tensiometer, Karl Fisher Titrator,
Color Comparator, Flash Point Apparatus, Potentiometric Titrator,
Laser Particle Counter, Breakdown Voltage Tester (BDV),
Power Dissipation Factor/Power Factor Testing Instrument
Delta-X Research Transformer Oil Analyst™ software
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 8
Equipment and Resources - Oman
Drilling Rigs – 6 no. Dual Purpose Crawler Mounted 1 no. Beretta T44 Rig, 5 Hanjin P4000SD Rigs.
Drilling Rigs –Reverse Circulation Rig - Crawler M ounted 1 no.DESCO SP7500SA-RC c/w automatic sampling system
Other Plant & Test Equipment Pressuremeter test equipment,
Jean-Lutz Drilling parameter measurement systems
Soil Resistivity Testing Equipment
Thermal Resistivity Testing Equipment
Submersible Pumps, V-Notch Weir Tanks, Pressure Transducer and Dataloggers
Water Bowsers and Water Tanker
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 9
Soil and aggregate testing laboratory
CBR machine
Sieve set
Electronic balances
Drying Ovens
Asphalt testing laboratory
Ignition Oven for Binder content
Chemical laboratory
BOD Incubators
Muffle Furnaces
HACH spectrometers
Microbiological and drinking water testing laborato ry
Bacteria culture Incubator
Colony counter
On-site Materials Testing Laboratories
Plate bearing test equipments
In-situ CBR testing equipments
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 10
Services – Qatar and Oman GROUND INVESTIGATION
Onshore Soil Investigations, Nearshore Soil Investigations
Contaminated Land and Environmental Investigations
Exploratory Borehole Drilling and Sampling
Trial Pitting
In-Situ Testing
Static “Dutch” Cone Penetration Testing
Dynamic Cone Penetration Testing
Probehole Surveys
Geophysical Investigations
Soil Resistivity Testing
WATER RESOURCES AND WATER MANAGEMENT Water Well Drilling
Soakaway Borehole Drilling
Well Casing Installation
Pumping Tests and Permeability Testing
Earthing and Cathodic Protection Boreholes
LABORATORY / MATERIALS TESTING Soil and rock mechanics laboratory testing
Groundwater, seawater & wastewater analysis
Concrete testing
Aggregate testing
Asphalt testing
Chemical testing
Environmental testing
Petroleum Products testing
GEOLOGICAL INVESTIGATIONS / MINERAL RESOURCES Geological mapping
Walk-over surveys
Exploratory core drilling
GROUND ENGINEERING AND GROUND IMPROVEMENT Pressure grouting
Gravity filling of cavities and voids
Anchor drilling
Micropiling
OTHER SERVICES Pile Integrity Testing
Underground Service Detection
Ground Penetrating Radar
Electromagnetic Surveys
Electrical Resistivity Survey
Thermal Resistivity Testing
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 11
APPENDIX A
CERTIFICATIONS &
ACCREDITATIONS
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 12
GULF LABS - ISO 17025:2005 ACCREDITATION (Main La boratory)
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 13
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 14
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 15
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 16
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 17
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 18
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 19
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 20
GULF LABS - ISO 17025:2005 ACCREDITATION (Petroleum Testing Laboratory – Ras Laffan Annex)
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 21
GULF LABS - ISO 9001: 2008 CERTIFICATION
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 22
GULF LABS - OHSAS 18001:2007 CERTIFICATION
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 23
GULF LABS - ISO 14001:2004 CERTIFICATION
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 24
GULF LABS - ISO 14001:2004 CERTIFICATION
(Petroleum Testing Laboratory – Ras Laffan Annex)
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 25
GULF LABS - OHSAS 18001:2007 CERTIFICATION (Petroleum Testing Laboratory – Ras Laffan Annex)
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 26
GULF LABS - MOE CERTIFICATE OF CONFORMITY – LABOR ATORY
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 27
GULF LABS - MOE CERTIFICATE OF CONFORMITY - GEOTE CHNICAL
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 28
GULF GEOTECH (OMAN) - ISO 17025:2005 ACCREDITATIO N
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 29
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 30
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 31
GULF GEOTECH (OMAN) - Ministry of Environment App roval Certificate
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 32
GULF GEOTECH (OMAN) - Muscat Municipality Certifi cate
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 33
GULF GEOTECH (OMAN) - Civil Defence Certificate
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 34
GULF GEOTECH (OMAN) - DGSM Certificate
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 35
GULF GEOTECH (OMAN) - DGSM Certificate
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 36
APPENDIX B
ORGANIZATION CHART
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 37
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 38
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 39
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 41
APPENDIX C
RESUME OF COMPANY EXPERIENCE
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 42
Major On-going Projects Geotechnical Investigations & Drilling Projects
2013 ( Current Work in Hand )
Location Client Project Value (US$)
Oman Idroesse Infrastructure 'Geotechnical Investigation for Wadi Majilass Dam – Quriyat Region 403,640
Oman 'COWI & Partners L.L.C Cave visitor centre -Quotation for Geotechnical Investigations 16,000
Oman Watco Production station at khamilah , North Field, Waid Jifrah
30,000
Oman Lonestar Alpha Laboratories Geotechnical Investigation for bridges from Haima to Thumrait 80,000
Oman Lonestar Alpha Laboratories Geotechnical Investigation at Wadi Ghumdah at Bukha 21,2000
Oman Muscat Municipality Geotechnical Investigations for Design and Supervision of Protection
Scheme of Wadi Al Jifinan & Wadi Al Ansab 447,916
Oman ASTALDI-OZKAR JV LLC Dualization of bidbid-sur road project package -1-a 130,208
Oman Gulf Mining Core drilling in Ibri 44,270
Oman GEO-Resources Consultancy
Geotechnical Investigations for Plot 330 Nizwa Industerial Area. 8,072
Oman Al Hassan Engineering Co.
S.A.O.G.
Geotechnical Investigations works at Wadi Kabir 39,000
Oman 'COWI & Partners L.L.C 'Muscat and Qurum City Centre Cinemas- Geotechnical Investigations 17,700
Major Completed Projects Geotechnical Investigations & Drilling Projects
2012
Location Client Project Value (US$)
Qatar GEMS -NDPP ADDITIONAL NEW DOHA PORT PROJECT - ADDITIONAL GEOTECHNICAL SITE
INVESTIGATION 1,069,585
Qatar ITCC DRILLING EARTH BOREHOLES 4,324
Qatar SINOHYDRO CORPORATION CP1
PROJECT LUSAIL WATER FRONT- PERGOLA FOUNDATIONS 63,660
Qatar FAHAD ABDEL HAD SOFAN WATER WELL CLEANING 961
Qatar SCHLUMBERGER PUMPING TEST WORKS IN DOHA, AL WAKRA & ALKHOR 54,427
Qatar QPMC GABBRO TERMINAL PROJECT MESAIEED 76,063
Qatar AL HUDA ENGINEERING WORKS CONSTRUCTION AT SUPREME EDUCATIONAL COUNCIL HEAD 237,479
Qatar FUGRO PENINSULAR RENTAL OF PRESSURE METER 3,294
Qatar TECHNICAL ENGINEERING CONSULTANCY FOR BEACH DEVELOPMENT 16,102
Qatar STFA MARINE CONSTRUCTION MESAIEED GABBRO BERTH #3ECT 21,854
Qatar TECHNITAL CONCEPT DESING OF ROADS PACKAGE-2 44,557
Qatar SINOHYDRO CORPORATION CP1
PROJECT LUSAIL CP1 PROJECT 16,625
Qatar PUNJ LLOYD LTD CONTAMINATION STUDY NDIA 40,767
Qatar CHINA HARBOUR ENGINEERING
COMPANY NDPP-GEOTECHNICAL INVESTIGATION WORK 110,611
Qatar TAG ENGINEERING DRILLING EARTHING BOREHOLES 6,873
Qatar CDC-TAKENAKA JV CONTAMINATION STUDY NDIA 103,259
Qatar SEEF LUSAIL REAL ESTATE
DEVELOPMENT COMPANY W.L.L LUSAIL COMMERCIAL WATERFRONT DEVELOPMENET 27,869
Qatar QATALUM RELINING FACILITY SITE GEOTECHNICAL AND TOPOGRAPHICAL
SURVEY 43,761
Qatar BLACK CAT ENGINEERING &
CONSTRUCTION EPIC OF AMMONIA RECOVERY & AMMONIA FLARE SYSTEMS 20,544
Qatar URBACON INTERNATIONAL DUKHAN BEACH HOUSE 17,793
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 43
Qatar GHD RELOCATION OF FACILITIES FOR BUCK HALL-G 35,024
Qatar LEADERS INTERNATIONAL
SCHOOL PROPOSED SCHOOL AT AIN KHALID, DOHA 5,491
Qatar SHABEEB NASAR AL NUAIMI CLEANING WATER WELLS AT UMBERKKA, QATAR 4,118
Qatar SINOHYDRO CORPORATION CP1
PROJECT LATERAL UTILITY TUNNEL LUSAIL 16,183
Qatar URBACON INTERNATIONAL ISLAND PROJECT BRIDGE 64,167
Qatar CHINA HARBOUR ENGINEERING
COMPANY NPP SPT BOREHOLES 23,931
Qatar SINOHYDRO CORPORATION CP1
PROJECT LUSAIL PROJECT 16,859
Qatar MARAFEQ QATAR LUSAIL PROJECT 38,859
Qatar PREMIER INN HOTELS EDUCATIONAL CITY, QATAR 14,058
Qatar CHINA HARBOUR ENGINEERING
COMPANY NEW PORT PROJECT (SAMPLING SPT BOREHOLES) 5,005
Qatar CHINA HARBOUR ENGINEERING
COMPANY NEW PORT PROJECT- SPT BOREHOLES 192,012
Qatar SINOHYDRO CORPORATION CP1
PROJECT GEOPHYSICAL SURVEY-MASW 23,871
Qatar MARAFEQ QATAR PWC PLANT - LUSAIL 15,045
Qatar MIDDLE EAST DREDGING
COMPANY
NDPP-ACCESS CHANNEL DREDGING & OUTER BREAKWATERS
CONSTRUCTION 35,824
Qatar ACTION NDPP WATER WELL 24,530
Qatar QATAR KENTZ RLIC QATAR 8,758
Qatar KLING COSULT LUSAIL KATARA HOTEL- MARINA DISTRICT 34,645
Qatar AL HUDA ENGINEERING WORKS CONSTRUCTION AT SUPREME EDUCATIONAL COUNCIL HEAD 11,765
Qatar QDVC 2CIA UNDERGROUND STATIONS & AL KHOR VADUCT WORKS 3,624
Qatar CHINA HARBOUR ENGINEERING
COMPANY NEW PORT PROJECT 153,920
Qatar TAG ENGINEERING EARTHING BOREHOLE- QATAR RADIO & TELEVISION CORPORTATION 9,289
Qatar ASWAN TRADING &
CONTRACTING COMPANY QUARRY FEASIBILITY STUDY 17,447
Qatar SINOHYDRO CORPORATION CP1
PROJECT LUSAIL PROJECT 7,975
Qatar CHINA HARBOUR ENGINEERING
COMPANY NEW PORT PROJECT-SPT BORE HOLES (COAST GUARD) 170,487
Qatar KEO INTERNATIONAL ADDITIONAL FIELD TESTING AND INTERPRETATIVE REPORTING 4,393
Qatar GREAT LAKES DREDGE & DOCK
CO MARINE / NEARSHORE SITE INVESTIGATION - SUMAISIMAH, QATAR 109,720
Qatar BUILTECH ENGINEERING &
CONTRACTING CO. DRILLING OF EARTHING BOREHOLE AT NEW DOHA PORT 2,059
Qatar MOHAMMED KHARAN SIYAN AL-
MANSSORI DRIILLING OF WATER WELL AT AFJAN, DUKHAN 8,236
Qatar JABIR NASSER AL-HUMAIDI CLEANING OF WATER WELL AT TINBAK 9,609
Qatar RASGAS COMPANY LIMITED GEO-ENVIRONMENTAL INVSESTIGATION, DRILLING GROUNDWATER
MONITORING WELLS 16,911
Qatar ELETTRO OROBICA S.R.L. - CASH
CUSTOMER RADAR SITE LOCATION - NDIA 14,825
Qatar MATHAR AL DOSRI WATER WELL CLEANING 5,491
2012 ( Completed Projects )
Location Client Project Value (US$)
Oman Al Rimal Mining Limestone core drilling, Salalah 273,177
Oman 'Zoom Steel 'Iron Ore Exploration, Ibra 435,286
Oman Geowel International Limited
LLC Core drilling in Sinaw 123,697
Oman 'Five Oceans 'Sohar Special Economic Zone - Geotechnical support 23,169
Oman COWI &Partners L.L.C 'Salalah Airport interchange 4,166
Oman 'Saraya Bandar Jissah Geotechnical investigations at Saraya Bandar 287,559
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 44
Oman 'Five Oceans Environmental LLC Environmental Investigation in Sohar, 22,395
Oman 'Ghafari International 'Cargo Facilities at Muscat and Salalah International Airport-
Geotechnical Investigations 24,968
Oman 'Sogreah 'Water Storage Reserviors -Muscat 241,000
Oman 'Five Oceans 'Al Ansab Wetlands 6,385
Oman 'Al Musdaq Modern Trade 'Marine Geotechnical Investigation at Ras Al Hadd- Oman 15,625
Oman 'Oman Oil 'Geotechnical investigations for proposed Sur Independent Power
Project 74,568
Oman Al-Safa Environmental &
Technical Environmental study in Sohar 17,768
Oman Al-Fairuz Mining Co LLC Core drilling in Block 7 1,155,416
Oman Al-Thuraya Mining LLC Massive Sulphide Deposit for Exploratory Core Drilling and Laboratory
Testing 328,640
Oman 'COWI &Partners L.L.C 'Proposed Development of Ghala - Geotechnical Investigations 10,556
Oman Gulf mining Core drilling in Oman 59,000
Oman 'Towell Co. LLC 'Muscat Hills Residences 20,833
Oman 'Khalid Bin Hamed & Sons LLC 'Geotechnical Investigation for construction of bridges at Qurayat - Sur
Road 17,661
Oman 'Khalid Bin Hamed & Sons LLC 'Geotechnical Investigation for construction of Wadi Hilty Road Project 7,313
Oman 'Khalid Bin Hamed & Sons LLC
'Geotechnical Investigation for construction of bridges at Mury –Al Ain
Road 17,122
2011
Location Client Project Value (US$)
Oman Cowi Salalah Interchange Project 4,160
Oman Gulf Mining Co. Exploratory core drilling in Hafeet 13,780
Oman Horizon Engg. Consultancy Commercial and residential building at Plots 180, 628 and 6234 in
Mabellah South 4,290
Oman Oman United Engineering
Services G+B+8 Storey building in Al Azaiba 1,560
Oman Five Oceans Environmental LLC Geotechnical Investigation at Al Ansab Wildlife Visitors Centre 6,305
Oman Gulf Mining Co. Exploratory core drilling at Thumrait 14,300
Oman Ultra-tech Cement Limestone core drilling at Khasab, Musandam 349,700
Oman Al Fairouz Mining Diamond core drilling services – Blocks 5 & 6 842,270
Oman Gulf Mining Co. Exploratory core drilling at Al Wasqba Marble Mine 18,772
Oman Alara Resources Exploratory core drilling at Daris 47,320
Oman Horizon Engg. Consultancy Commercial and Residential Building 1,430
Oman Private client Commercial and Residential Building 1,560
Oman Omanoil Geotechnical investigations for proposed Sur Independent Power
Project 74,461
Oman Al Thuriyah Mining Exploratory core drilling on massive sulphide deposit 465,816
Qatar AECOM EXISTING LAND TREATMENT UNIT (LTU) 46,500
Qatar QATAR GAS OPERATING CONSULTANCY SERVICES FOR SITE SURVEY & SOIL INVESTIGATION 112,945
Qatar GULF CONTRACTING BEARING CAPACITY OF PIPE SUPPORT FOUNDATIONS- PEARL GTL
PROJECT 8,219
Qatar MILAHA MILAHA LOGISTIC CITY 24,810
Qatar AL JABEER & PARTNERS QATAR FOUNDATION – EARTHING BOREHOLES 8,460
Qatar ARAB ENGINEERING BUREAU GEO ENVIRONMENTAL INVESTIGATION 19,781
Qatar PUNJ LLOYD LTD DRILLING OF BOREHOLES FOR DEEP WELL GROUND BEDS 24,740
Qatar SCHLUMBERGER DEWATERING WELLS AT INDUSTRIAL AREA. 17,832
Qatar DECORELLE DRILLING EARTHING BOREHOLES 5,452
Qatar AL BADIYA TRDNG & CONTG 5,101
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 45
Qatar SINOHYDRO CORPORATION CP1
PROJECT SINOHYDRO CORPORATION CP1 PROJECT 15,795
Qatar TRADING AND AGENCY SERVICES
LTD. DRILLING EARTHING BOREHOLES 7,007
Qatar QATAR GAS OPERATING GROUND WATER MONITORING WELLS INSTALLATION 42,889
Qatar IMPERIAL TRADING &
CONTRACTING CO. WLL DRILLING EARTHING BOREHOLES 1,479
Qatar DANWAY QATAR DRILLING EARTHING BOREHOLE in ARAB D, DUKHAN 5,753
Qatar KEO INTERNATIONAL AL QAJBAH DEVELOPMENT 10,689
Qatar QDVC ENERGY CITY STATION, LUSAIL 19,726
Qatar QATAR KENTZ QATAR KENTZ- SIDRA MEDICAL CITY, QATAR FOUNDATION, DOHA . 5,890
Qatar NASSER MUBARAK NA
ALMADEED- AL ALI CONSULT NASSER MUBARAK NA ALMADEED- AL ALI CONSULT 4,340
Qatar SAMSUNG ENGINEERING SAMSUNG ENGINEERING- LAFFAN REFINERY DHT PROJECT , RAS
LAFFAN, QATAR. 96,200
Qatar WORLEY PRSONS DEVELOPMENT OF ORYX GTL PRODUCT STORAGE TANKS AREA. 113,710
Qatar MUSTAFAWI RENTAL OF JACK UP, BARGE. 78,082
Qatar TEBODIN FEED FOR INSTALLATION OF 20" WET GAS PIPELINE 25,692
Qatar GHD DRIILLING GROUND WATER MONITORING WELLS, AT HALUL ISLAND 13,171
Qatar AECOM EXISTING LAND TREATMENT UNIT (LTU) 25,562
Qatar AECOM NEW LAND TREATMENT UNIT-RASLAFAN 11,719
Qatar HYDER CONSULTING ME AL HUWAILAH ROAD 29,325
Qatar METALEX TRADING &
CONTRACTING DOHA INDUSTRIAL AREA, STRT#38 1,834
Qatar DECORELLE ABA PALACE RAYYAN 1,834
Qatar QATAR MULTITECH TRAD QTEL RLU DOHA 1,377
Qatar URBACON INTERNATIONAL THE ISLAND PROJECT 189,064
Qatar MOTT MACDONALD ASHGAL LAGOONS PROJECT 129,145
Qatar ASWAN TRADING WATER WELL DRILLING AT OWAINA, DUKHAN 6,151
Qatar NASSER AL HAJIRI CO. LTD PEARL GTL PROJECT 14,274
Qatar QDVC SHERTON 4,795
Qatar SINOHYDRO CORPORATION CP1
PROJECT LUSAIL PROJECT 23,699
Qatar METALEX TRADING &
CONTRACTING
SUPPLY AND INSTALLATION OF 80M SELF SUPPORT TOWER AT ABU
SAMRA 1,233
Qatar QVC NEW CHLORIDE-ALKALI AND EDC PLANT IN MESAIEED. 25,048
Qatar SHEIKH ABDUL RAHMAN BIN
JASSIM CLEANING WATER WELL IN ALKHOR 13,356
Qatar DAR AL HANDASAH NDPP 5,137
Qatar TOURIST TRAVEL BUREAU CLEANING WATER WELL AT UMMBERKA, QATAR 1,644
Qatar QDVC ENERGY CITY STATION 2,740
Qatar ASWAN TRADING WATER WELL IN AL OWAINA, DUKHAN 11,493
Qatar AMAR CONSTRUCTION DRILLING EARTHING BOREHOLE AT RAYYAN 8,507
Qatar MR. ABDULLA MUBARAK
HAMAD DRILLING WATER WELL IN AFFAN, DUKHAN 4,932
Qatar EMBASSY OF JAPAN PROPOSED BUILDING FOR EMBASSY OF JAPAN 9,534
Qatar KEO INTERNATIONAL QATAR SHELL - AL KHOR HOUSING 41,079
Qatar QATAR NAVIGATION QATAR NAVIGATION LOGISTIC CITY 25,263
Qatar SHEIKH ABDUL RAHMAN BIN
JASSIM CLEANING WATER WELL AT SULAIMI, QATAR 8,904
Qatar AEB DOHA FESTIVAL CITY AT SHAMAL ROAD 8,279
Qatar QATAR VINYL COMPANY NEW CHLORIDE-ALKALI AND EDC PLANT IN MESAIEED. 45,408
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 46
Qatar ENERGY TECHNICAL SERVICES EPIC FOR FIRE TRAINING GROUND 4,807
Qatar ENERGY TECHNICAL SERVICES EPIC OF MOSQUE &EID MUSALLA 6,008
Qatar FAHAD SAQR AL MEREKHI CLEANING WATER WELL 3,562
Qatar QATAR ENGINEERING
LABORATORIES NDPP- CONE PENETRATION TEST 7,014
Qatar MARBU DRILLING SOAKAWAY BOREHOLES AT AQUA PARK 1,863
Qatar POLY PRODUCTS PROPOSED FACTORY AT QATAR INDUSTRIAL 5,055
Qatar CHINA HARBOUR ENGINEERING
COMPANY NDPP 132,550
Qatar NASS GROUP DRILLING SHORING BOREHOLES AT AL WAAB 7,123
Qatar SCHLUMBERGER DOHA METRO RED LINE 830,089
Qatar AL NASHAT CONTRACTING EPIC OF RAW SEWAGE EFFLUENT NETWORK AT RAS LAFFAN CITY 7,123
Qatar AMAR CONSTRUCTION DRILLING EARTHING BOREHOLE 4,562
Qatar ALPHA GULF DRILLING EARTHING BOREHOLES AT WAKRA 1,096
Qatar FAWZY FAWY TAHA ABOUZEID
C/O KHALID INTERNATIONAL 1,781
Qatar MSHEIREB PROPERTIES GOLF COURSE COMMUNITY EDUCATION CITY- DOHA 22,432
Qatar DOHA MOTORS TRADING PROPOSED G+M+ OFFICE BLOCK & WORKSHOP AT RLIC 3,562
Qatar AEB BEACH VILLA AT THE PEARL QATAR FOR Mr. ALL AL FARDAN 7,164
Qatar SINOHYDRO CORPORATION CP1
PROJECT LUSAIL PROJECT 7,466
Qatar A.A. ENGINEERING AL WAAB CITY SALWA ROAD 1,096
Qatar TAG QATAR RADIO TV CORPORATION COMPLEX DOHA 75,810
Qatar SHK KHALIFA BIN HAMAD AL
THANI CLEANING WATER WELL 3,342
Qatar FBA MIX CONSTRUCTION & DESIGN OF BLOCK & HOLLOW COREFACTORY,
MESAIEED 4,110
Qatar QATAR GAS OPERATING SOIL SAMPLING & TESTING 5,548
Qatar UNITED COSNTRUCTION PROPOSED AL MANA TOWER (3B+G+M+20 FLOORS) DOHA 4,808
Qatar HALCROW MMUP PACKAGE 25 AL HADARMA EAST 37,198
Qatar HALCROW MMUP PACKAGE 22 AL SAADI RASHEEDA STREET 72,513
Qatar AL AHMADANI GROUP PROPOSED 2B+G+M+6 STOREY BUILDING AT OLD GHANIM DT DOHA 9,041
Qatar ACTION RENTAL OF RIG & CREW - LUSAIL DEWATERING PUMP 7,671
Qatar I T C C ASHGAL SCHOOLS NO 9,14,15 & 16 123,288
Qatar QAFCO DRILLING & INSTALLATION OF 2NOS. GROUND WATER QUALITY
MONITORING BOREWELLS 6,096
Qatar AEB CENTRO HOTEL AT BIN MAHMOUD DOHA 5,616
Qatar MEECC Q-CHEM MESAIED 8,767
Qatar METALEX TRADING &
CONTRACTING INSTALLATION OF 80M SELF SUPPORT TOWER AT ABU SAMARA 5,199
Qatar HYDER CONSULTING ME AL JAMILIYA PTP & NORTH CAMP 8,219
Qatar AEB RESIDENTIAL TOWER (3B+G+50) AT WEST BAY 26,507
Qatar GULF CONTRACTING BEARING CAPACITY OF PIPE SUPPORT FOUNDATIONS- PEARL GTL
PROJECT 28,901
Qatar SINOHYDRO CORPORATION CP1
PROJECT LUSAIL PROJECT – CP1 - Cantilever 15,848
Qatar AMAR CONSTRUCTION CBQ BRANCH - AL KARTHEYATH 4,986
Qatar COWI A/S PACKAGE NO.21 DESIGN OF MAJOR ROADS IN THE CENTRE OF DOHA 158,548
Qatar CONSOLIDATED GULF CO. WLL GDS STATION W1 & W2 AT RAS ABU FONTAS 10,609
Qatar REDCO INTERNATIONAL SEWAGE TANKERS RECEIVING STATION RIGID PAVEMENT 4,006
Qatar RAMADA PLAZA UNDERGROUND SOIL INVESTIGATION 760
Qatar PUNJI LLOYD NDIA- DOHA 4,636
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 47
Qatar AEB ADDITIONAL VISITOR CAR PARKING AT THE PEARL QATAR 23,129
Qatar QPMS NEW ACCESS ROAD TO QPMS SAND WASHING PLANT 9,903
Qatar GREAT LAKES DREDGE & DOCK
CO NDPP CP 06 . Qatar 103,575
Qatar MARBU ROAD WORKS, PARKING, LANDSCAPING , SHADES AND DEVELOPMENT
OF AL-JABEL AREA, DUKHAN 14,752
Qatar EMBASSY OF INDIA PROPOSED INDIAN EMBASSY BUILDING DOHA 16,332
Qatar AL MAKKI REAL ESTATE 2B+G+7 STOREY BUILDING, AL SADD , DOHA 4,384
Qatar CHINA HARBOUR ENGINEERING
COMPANY RENTAL OF STEEL BOAT 3,918
Qatar ROYAL ENGINEERING CONTAINER 5,479
Qatar QATAR GAS OPERATING LAFFAN PROJECT 3,644
Qatar TRAGS DRILLING EARTHING BOREHOLES AT QAPCO , MESAIEED 7,808
Qatar SHK HASSAN BIN FAHAD BIN
JASSIM AL THANI WATER WELL DRILLING IN AL KHEESA 1,616
Qatar A A ENGINEERING SERVICES AL WAAB CITY SALWA ROAD 1,534
Qatar MUBARAK HASSSAN ISAAL NASR CLEANING WATER WELL 1,096
Qatar DANWAY QATAR EPIC STATICS WITHIN DUKHAN FIELD 3,973
Qatar ASWAN TRADING &
CONTRACTING COMPANY WATER WELL DRILLING AT OWAINA, DUKHAN 16,753
Qatar BIN NASER TRADING DRILLING SOAKAWAY BOREHOLES FOR RESIDENTIAL BUILDINIG IN
GARAFA 1,918
Qatar MOHAMED AL I MALADIH WATER WELL AT NASRIYA 1,370
Qatar HASSAD FOOD ADDITONAL DRILLING WORKS & WELL CASING INSTALLATION FOR
FLOWER GREEN HOUSING 26,370
Qatar KHALID CEMENT INDUSTRIES
COMPLEX PRE STORAGE CONCRETE PRODUCTION PLANT- SALWA IND AREA. 7,481
2010
Location Client Project Value (US$)
Oman Private client Residential Commercial Building and at plot 206 Al Maweleh south-Al
Seeb 1,450
UAE Salva Resources / Readyrock
Quarries
Limestone Exploration Site at Fujairah , United Arab of Emirates-Core
Drilling 46,800
Oman Horizon Engg. Consultancy Commercial and Residential Building at plot No 294 Al Mabela South 1,430
Oman Horizon Engg. Consultancy Commercial Residential Building at plot No 568, block 2 AL Mabela 1,430
Oman Gharafi International Cargo Facilities at Muscat and Salalah International Airports 24,929
Oman Technibuild Micropile drilling 25,402
Oman National Contracting Co. Thermal Resistivity testing, Sohar 5,148
Oman Gulf Mining Core drilling services in ibri and Waqba 24,700
Oman Al Musdaq Modern Trade Maine Geotechnical Investigation at Ras Al Hadd 15,600
Oman Cowi & Partners Salalah Airport Interchange 31,462
Oman Al Fairouz / APM Mining Diamond core drilling services – South Batinah 388,700
Oman Saraya Bandar Jissah Ritz Carlton Hotel at SBJ 46,272
Qatar SINOHYDRO CORPORATION LUSAIL DEVELOPMEMNT – CANTILEVER 12,978
Qatar CHINA HARBOUR ENGINEERING
CO. DREDGING & RECLAMATION WORKS AT AL RUWAIS PORT 175,342
Qatar KEO INTERNATIONAL
CONSULTANTS SHOOTING RANGE & TRAINING COMPLEX AT LEHSANIYAH 14,540
Qatar AL JABER & PARTNERS QATAR FOUNDATION – EARTHING BOREHOLES 17,872
Qatar AMERICAN INTERNATIONAL
CONTRACTORS AL UDEID AIR BASE – SOF09 – GROUND INVESTIGATION 16,100
Qatar ARAB ENGINEERING BUREAU NORTH GATE MALL DEVELOPMENT AT SHAMAL ROAD 40,367
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 48
Qatar TECHNIP FRANCE PLATEAU MAINTANANCE PROJECT 2,046
Qatar AL JABER TRASNPORT PEARL GTL PROJECT 19,569
Qatar SCHLUMBERGER PROPOSED WORK AT DEVELOPMENT AT ABU HAMOUR 6,027
Qatar ARAB ENGINEERING BUREAU OFFICERS & RETAIL BUILDING 17,093
Qatar ARAB ENGINEERING BUREAU MIXED USE DEVELOPMENT AL KHALEEJ STREET, BIN MAHMOOD 15,784
Qatar MARBU CONSTRUCTION & UPGRADE OF EMERGENCY APPROACH ROADS TO
ARABD. FNGLCS & JDS IN DHUKAN FIELD 16,862
Qatar HASSAD FOOD WATER WELL & PUMPING TETST WORKS IN SHAHANIYA FARM 19,726
Qatar JAN DE NUL NDPP- CP06 10,348
Qatar LARSEN & TOUBRO DOHA SOUTH SEWARAGE TREATMENT WORKS PH-II EXPANSION 25,359
Qatar TECHNICAL RESOURCES ARAB MUSEUM OF MODERN ARTS 6,986
Qatar HYDER CONSULTING ME ASPIRE ZONE 37,288
Qatar PRIVATE ENGINEERING OFFICE DOHA CENTRAL GRAND PARK 36,319
Qatar SINOHYDRO CORPORATION CP1
PROJECT DRILLING DIAMETER BOREHOLES 27,381
Qatar KEPPLER SEGHERS DOHA NORTH SEWERAGE TREATEMENT PLANT - BAGGING PLANT 7,077
Qatar PRIVATE ENGINEERING OFFICE LAND AT SOUK WAKEF, DOHA 14,151
Qatar A I C I UDEID AIR BASE 7,816
Qatar HYDER ENVIRONMENT ASSESMENT AT WAKRA PETROL STATION 13,028
Qatar QATAR GAS OPERATING QATAR GAS FACILITY RLIC 23,260
Qatar QATAR KENTZ FAHAHIL STRIPPIN PLANT DOKHAN 3,836
Qatar BURHAN INTERNATIONAL DEVELOPMENT OF ROADS IN BANIHAJER ZONE 213,680
Qatar CDC-TAKENAKA JV NDIA - CP35 4,881
Qatar QATAR KENTZ PEARL GTL SITE- RLIC 4,795
Qatar SCHLUMBERGER SHALLOW GROUND WATER MONITORING IN DOHA 868,651
Qatar C T J V 6,425
Qatar ENERGY TECHNICAL SERVICES WORKSHOP AT QRSFA - DHUKAN 3,051
Qatar C T J V QCS PROJECT RASLAFFAN 9,356
Qatar EXXONMOBIL RESEARCH SABKHA CORE DRILLING 43,986
Qatar REDCO CONSTRUCTION -
ALMANA DOHA SHOWCASE STADIUM 2022 AT ABU HAMOUR 15,726
Qatar HX STEEL INTERNATIONAL DRILLING BOREHOLES GDI- DUKHAN FIELD 3,425
Qatar HE SHEIKH FAHAD BIN
ABDULLAH ABDUL AZIZ AL THANI DRILLING WATER WELL 2,466
Qatar SINOHYDRO CORPORATION CP1
PROJECT GROUND WATER MONITORING WELLS AT SWI LUSAIL 9,634
Qatar
CONSOLIDATED CONTRACTORS
INTLS CO / TEYSEER
CONTRACTING COMPANY
QGX II PROJECT RASLAFFAN 9,836
Qatar ELECTRO THAWRAT DRILLING EARTHING BOREHOLES , DIE SUBSTATION 8,548
Qatar AL QAHTANI ENGINEERING DRILLING SOAKWAY BOREHOLE 4,110
Qatar QATAR KENTZ PEARL GTL SITE- RLIC 5,342
Qatar ARCHIRODON CONSTRUCTION
OEVRSEAS CO.SA DRILLING BOREHOLES EARTHING- RLIC 5,342
Qatar G H D DRILLING & INSTALLATION GROUND WATER MONITORING WELLS 60,685
Qatar
CONSOLIDATED CONTRACTORS
INTLS CO / TEYSEER
CONTRACTING COMPANY
QGX II PROJECT RASLAFFAN 7,260
Qatar SHEIKH NASAR BIN JASSIM AL
THANI CLEANING WATER WELL AT WADI WASIAH 4,658
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 49
Qatar HE SHEIKH FAHAD BIN
ABDULLAH ABDUL AZIZ AL THANI DRILLING WATER WELL 24,658
Qatar DOPET HALUL PROJECT 15,110
Qatar METALEX TRADING &
CONTRACTING DRILLING EARTHING BOREHOLE AT DOHA IND AREA 2,466
Qatar GULF CONTRACTING DOHA WEST SEWAGE TREATMENT WORKS EXTENTION :3 8,219
Qatar H.E SHEIKH ABDULLA BIN JASIM
AL THANI AL THANI WATER WELL 2,301
Qatar QATAR KENTZ PEARL GTL SITE- RLIC 6,986
Qatar SAOUD ABDULLA HAMAD AL
HAZAB CLEANING WATER WELL AT MUAITHER 1,370
Qatar ARAB ENGINEERING BUREAU MIC Housing Project Phase#2 20,400
Qatar QDVC LUSAIL CAR PARK PROJECT 1,644
Qatar NEW LINE GROUP DRILLING EARTHING BOREHOLE AT DOHA 1,507
Qatar STFA MARINE CONSTRUCTION EPIC OF CONTAINER TERMINAL AT MESAIEED BERTH #7 27,507
Qatar ENERGY TECHNICAL SERVICES EPIC OF MOSQUES 14,556
Qatar STFA MARINE CONSTRUCTION EPIC OF CONTAINER TERMINAL AT MESAIEED BERTH #7 35,637
Qatar GEMS INTERNATIONAL NDPP - HIRE OF GEOLOGIST / ENGINEER 10,959
Qatar SINOHYDRO CORPORATION CP1
PROJECT CP5- GOLF 1 SUBSTATION LUSAIL, DOHA 10,993
Qatar HYDER CONSULTING ME ASPIRE ZONE HYDRO GEOLOGICAL INVESTIGATION -PHASE II 100,388
Qatar HX STEEL INTERNATIONAL PROPOSED DEVELOPMENT AT RAS LAFFAN – GEOTECHNICAL
INVESTIGATION 4,581
Qatar ARUP QATAR NATIONAL MUSEUM – GEOPHYSICAL INV 12,678
Qatar CONSOLIDATED GULF CO. WLL HV CONTROL CENTRE BUILDING , DUKHAN 15,651
Qatar PREMIUM CONSTRUCTION CONSTRUCTION & REPAIR OF STREET LIGHT SYSTEM 15,753
Qatar ARUP MV2 SITE LUSAIL SIMSIMA ROUTE 10,116
Qatar ALPHA GULF PROPOSED 2B+G+2 BUILDING IN NUAIJAH DOHA 3,562
Qatar INDUSTRIAL SERVICES GROUP PROPOSED G+5 BUILDING AT MUMTAZA DOHA 3,562
Qatar A R U P MEEZA MV3 GROUND INVESTIGATION 5,718
Qatar QATAR INDUSTRIAL
LABOROTORIES DRILLING GEOTECHNICAL BOREHOLES – AL KHOR HIGWAY 71,233
Qatar SINOHYDRO CORPORATION CP1
PROJECT CP-5 UTILITY TUNNELS & INTERCHANGE 115,104
Qatar BURHAN INTERNATIONAL DEVELOPMENT OF ROADS IN BANIHAJER ZONE – GEOTECHNICAL
INVESTIGATION 31,697
Qatar T C J V PLATEAU MAINTANANCE PROJECT – GEOTECHNICAL INVESTIGATION 151,339
Qatar GEMS INTERNATIONAL NDPP - ADDITIONAL GEOTECHNICAL INVESTIGATION –Variation Order
-7 1,161,961
Qatar REDCO INTERNATIONAL G+2 STORING BUILDING AT WUKAIR 6,437
Qatar GEMS INTERNATIONAL RENTAL OF JACK UP, BARGE & DRILLING OF MARINE BOREHOLES 963,878
Qatar HALCROW QEC TRUCK MARSHALLING AREA & PEOPLE MOVER 82,572
Qatar KEPPLER SEGHERS DOHA NORTH SEWERAGE TREATEMENT PLANT 13,026
Qatar CONSOLIDATED CONTRACTORS
INTLS CO / TEYSEER
CONTRACTING COMPANY
QGX PROJECT RASLAFFAN 3,288
Qatar BLACK CAT ENGINEERING &
CONSTRUCTION EPIC FOR PRODUCED WATER TREATMENT & INJECTION PHASE-2 62,672
Qatar AMERICAN INTERNATIONAL
CONTRACTORS SITE INVESTIGATION ATALUDEID AIR BASE 15,477
Qatar KLG ORGANIC QATAR W.L.L CHLORINATED PARAFFIN WAXES (CPW) PROJECT 8,487
Qatar RENCO QATAR NDIA - CP35 103,151
Qatar MANSOOR ISSA AL HAKI 2B+G+6 GUILDING AT BINMAHMOOD 4,397
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 50
2009
Location Client Project Value (US$)
Oman Zoom Steel Iron Ore Exploration project, Ibra 343,400
Oman Saraya Bandar Jissah Saraya Bandar Jissah Resort 287,000
Oman Five Oceans Sohar Special Economic Zone 23,120
Oman Al Rimal Mining Limestone Quarry, NW of Salalah 272,600
Qatar CDC-Takenaka JV NDIA - Passenger Rail System – Geotechnical investigation
works 1,019,393
Qatar STFA Marine Construction EPIC for Container Terminal Berth 7 at Mesaieed Port – CPT
soundings 240,959
Qatar Adil Jaidah & Associates B+G+2 Office Building at C-ring Road 5,145
Qatar Coastal Consulting Engineering Submarine Cable at Corniche, Doha 15,019
Qatar Hyatt Plaza Drilling Soakaway boreholes 5,616
Qatar GHD Global Doha Park Project - Soil Testing & Drilling Boreholes to
Groundwater level. 9,641
Qatar CDC-Takenaka JV NDIA – Geotechnical investigation works 12,042
Qatar JGC / KBR – Qatar Shell Pearl GTL PROJECT PI-008 – Proposed Location of Operational
Waste Storage Cell – Geotechnical Investigation – Trial Pits 22,873
Qatar CCIC& Teyseer JV Qatargas 3 & 4 Onshore projects – Drilling Boreholes for vertical
anodes 10,885
Qatar Pillar Microwave Transmission Site – Muaither – Earthing Borehole 1,370
Qatar Dohaland Heart of Doha, Geotechnical Investigation Works 681,018
Qatar Rent-a-Port Lusail Development – Marine Geotechnical Investigation 66,608
Qatar CCIC& Teyseer JV NDIA, CP-27 Geotechnical Investigation for utility tunnel 20,548
Qatar KBAS Contracting Barwa Industrial Area & Development of Mohd. Bin Jassim St. 7,808
Qatar Sinohydro Corporation Lusail Stormwater Pumping Station SW1 – geotechnical
investigation 47,102
Qatar Mannai Trading Co. Proposed Development at RLIC for MCL – Geotechnical
Investigation 19,963
Qatar Hyder Consulting Lusail Pumping Station – Geotechnical Investigation 9,197
Qatar Halcrow Yolles NDIA – Airport Operations Facilities Package No. 2 –
geotechnical investigation 33,075
Qatar Qatar Kentz Pearl GTL, RLIC – Earthing borehole drilling 5,342
Qatar Consolidated Gulf Co. WLL Mesaieed Tank Farm Area – geotechnical investigation 6,997
Qatar Tracer Qatar Improvement to Roads and Cark park at HGH – Earthing
boreholes 23,518
Qatar Danway Qatar Drilling Earthing Boreholes in Dukhan 16,767
Qatar Gulf Contracting Co. WLL Earthing Boreholes 5,764
Qatar Danway Qatar Drilling Earthing Boreholes in Umm Bab 2,541
Qatar Atkins / Mumtalkat Plot ECQ-D-11 Energy City, Lusail 21,085
Qatar Arab Engineering Bureau Ras Al Nassa Development (Marine Works), Doha 53,301
Qatar Zenon Trading & Contracting Co. Soakaway borehole drilling 6,329
Qatar KEO International NDIA – Subsurface Exploration and Geotechnical Exploration 47,278
Qatar DOPET Design Inputs for Raft Foundation 1,233
Qatar Al Jaber Energy Services Common Sulphur Plant Qatargas II – Cathodic Protection
boreholes 10,247
Qatar Redco Construction Almana Construction of B+G+3 office Building at Al Wakrah 2,027
Qatar Qatar Primary Material Co Geotechnical Investigation 16,362
Qatar Hyder Consulting Qatar Foundation, Education City, Additional Geotechnical
Investigation – infiltration tests 14,438
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 51
Qatar Gulf Contracting CO. WLL DOHA WEST SEWAGE TREATMENT WORKS - DRILLING
EARTHING BOREHOLES 43,836
Qatar WSP Environmental Aerospace City, Al Khor- Geotechnical Investigation 162,995
Qatar GEMS New Doha Port project – Supplementary site investigation 2,169,160
Qatar Aswan Trading Drilling Water Wells in Al Khor Farm 24,616
Qatar CCIC& Teyseer JV Qatargas 3 & 4 Onshore projects – Drilling Boreholes for vertical
anodes 7,123
Qatar Middle East Engineering
&Corrosion Control WLL MEEC - QP Tank Farms 21,945
Qatar STFA Marine-Construction
Company Gabbro Berth - Piezocone testing 35,644
Qatar Qatar National Museum QNM - Additional SI - Pumping tests 53,682
Qatar Cedgec Central Control Room for QAPCO 8,811
Qatar Nasser- Al Hajiri Pearl GTL Project - Earthing boreholes 33,288
Qatar Mohamed Mohanna Ali Dosari Cleaning & Deepening Water Well At Al-Khuraib 1,370
Qatar Shannon Engineering HKT & MKT Office Building Najma 0
Qatar CCIC & Teyseer Contracting Borehole at RLIC 10,890
Qatar Al Jaber & Partners Education City - North Side Utility Tunnels 35,616
Qatar JGC KBR Pearl GTL Project off Plot Waste Cell 22,885
Qatar Dornier Consulting Drilling of Additional GW Monitoring Wells 100,000
Qatar Diplomatic Contracting Company New Industrial Area - Soakaways 4,049
Qatar KEO International NDIA -CP63 - Additional SI works 29,147
2008
Location Client Project Value (US$)
Qatar MR. ABDULLA ABDULARAHMAN
HYDER APARTMENT (B+G+2) - GEOTECHNICAL INVESTIGATION WORKS 1,507
Qatar QATAR DEVELOPMENT CO. KINDER GARTEN SCHOOLS AT ISHGAWA - GEOTECHNICAL
INVESTIGATION 4,205
Qatar SOGREAH PUMPING TEST & WATER ANALYSIS 66,740
Qatar FIVES SOLIOS QATALUM PROJECT - FUME TREATMENT PLANT - SOIL
INVESTIGATION 33,808
Qatar QATAR PRIMARY MATERIALS GEOLOGICAL PROSPECTING FOR SAND DEPOSITS - SITE
INVESTIGATION 21,034
Qatar GEMS NDPP PROJECT 401,562
Qatar CRC MARKIYAH MALL - DRILLING EARTHING BOREHOLE 8,440
Qatar CH2MHILL DRILLING & INSTALLATION GROUND WATER WELL AT
MESAIEED 13,432
Qatar FLUOR GROUND WATER MONITORING WELL IN CONDENSATE 1 & 2
AREA 64,029
Qatar MINISTRY OF MUNICIAPL
AFFAIRS & AGRICULTURE DRILLING 3 NOS. WATER WELL AT SABKHAT DUKHAN 7,397
Qatar HYUNDAI ENG'G & CONST. CO.
LTD
RAS LAFFAN "C" IWPP PROJECT (RAPO) - THERMAL RESISTIVITY
TEST 2,534
Qatar CCIC& TEYSEER RASGAS ONSHORE/ONPLOT EXPANSION - DRILLING OF
GROUND WATER MONITORING WELLS 20,274
Qatar HYUNDAI ENGINEERING &
CONSTRUCTION CO. LTD RAS LAFFAN "C" IWPP PROJECT- SOIL INVESTIGATION WORKS 285,686
Qatar FOSTER WHEELER QATAR PETROCHEMICAL COMPLEX PROJECT -
ENVIRONMENTAL BASE LINE SURVEY 153,374
Qatar NIPPON KOEI QUOTATION FOR PROVISION AND TRANPORTATION OF CORE
BOXES 3,562
Qatar JGC-KBR / QATAR SHELL PEARL GTL PORJECT - SHELL CONTRACT PI-012 TPME, PROJECT
NO. 9216T - GEOTECHNICAL INVESTIGATION WORKS 45,400
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 52
Qatar FLUOR MIDEAST LTD WEST SIDE FLUOR CAMP - DRILLING OF GROUND WATER
MONITORING WELLS 26,837
Qatar QATAR DEVELOPMENT CO. RIVERA GARDENS - DUHAIL - GEOTECHNICAL INVESTIGATION
WORKS 4,205
Qatar MAFCO B+G+10 BUILDINGS AT FAREEQUE ABDUL AZEEZ -
GEOTECHNICAL INVESTIGATION 20,466
Qatar RAKO CONTRACTING GEOTECHNICAL INVESTIGATION AT WAKRA 4,103
Qatar FERNAS CONSTRUCTION CO. EPIC FOR FUEL GAS SUPPLY TO QNCC - IV AND GCC -I PLANTS
AT UMM -BAB AREA 3,699
Qatar BEHZAD TRANSPORT DRILLING EARTHING BOREHOLES AT ADARMA 1,575
Qatar DOPET DOHA PETROLEUM CONSTRUCTION CO. (DOPET) - QP SITE 15,870
Qatar AL HUDA ENGINEERING WORKS EARTHING BOREHOLES FOR PLAZA II & III 1,912
Qatar KEPPLER SEGHERS DOHA NORTH SEWERAGE TREATMENT PALNT SITE 1 & 2 27,005
Qatar SALAM PETROLEUM SERVICES GEOTECHNICAL INVESTIGATION KHATIYAH MAIN IN DUKHAN
FIELDS 7,047
Qatar MADAR BUILDING MATERIAL GEOTECHINCAL INVESITGATION WORKS 7,064
Qatar AL WAZEERI TRADING
TRANSPORT & CONTG AL WAZEERI TRADING TRANSPORT 2,071
Qatar MAFCO CONTRACTING G + 3 BUILDING AT AL SAAD AREA - GEO TECHNICAL
INVESTIGATION WORKS 15,110
Qatar FERNAS CONSTRUCTION CO. PLANTS AT UMMBAB AREA - GEOTECHNICAL INVESTIGATION
WORKS 21,381
Qatar BEZHAD TRANSPRT DRILLING ONE BORE HOLE 1,575
Qatar AL SRAIYA STRABAG NEW IZGHAWA LINK ROAD - GEOTECHNICAL INVESTIGATION
WORKS 13,329
Qatar AMMICO CONTRACTING CO.
WLL
DRILLING & INSTALLATION OF GROUNDWATER OBSERVATION
WELL 4,384
Qatar KEO INTERNATIONAL GEOTECHNICAL INVESTIGATION 133,479
Qatar DAEWOO ENGINEERING CONSTRUCTION CO. RAS LAFFAN YARD RLIC - GEOTECHNICAL
INVESTICATION 171,486
Qatar STFA MARINE CONSTRUCTION GABRO BERTH EXPANSION AT MESAIEED 94,863
Qatar QATAR KENTZ DRILLING EARTHING BOREHOLES 4,110
Qatar MEDCO QATAR BAHRIAN CAUSEWAY - SOIL INVESTIGATION 121,014
Qatar MSK CONTRACTING GEOTECHNICAL 5,479
Qatar MSK CONTRACTING DRIILING GROUND WATER WELL 3,562
Qatar DOPET DRILLING EARTHING BOREHOLES 9,189
Qatar ABYAAR REAL ESTATE
DEVELOPMENT GEOTECHNICAL INVESTIGATION WORKS 84,614
Qatar AL JABER & PARTNERS DRILLING EARTHING BOREHOLES 43,315
Qatar ENERGY TECHNICAL SERVICES GEOTECHNICAL INVESTIGATION WORKS 8,000
Qatar QATAR PRIMARY MATERIALS SITE IVESTIGATION 63,233
Qatar REDCO GROUP PRECAST CONCRETE FACTORY - GEOTECHNICAL
INVESTIGATION 5,425
Qatar QATAR KENTZ PEARL GTL SITE - RLIC - DRILLING EARTHING BORE HOLE 18,493
Qatar CCIC& TEYSEER PACKAGE CP 27 - NDIA - GEOTECHNICAL INVESTIGATION 25,478
Qatar HYDER CONSULTING ME THE SPORTS CITY PROJECTS - BOREHOLE DRILLING, PUMPING
TEST 76,660
Qatar QATAR PRIMARY MATERIALS CEMENT SILOS, GABBRO BERTH, MESAIEED - GEOTECHNICAL
INVESTIGATION 40,849
Qatar HILL INTERNATIONAL GRAND HYATT RESORT PORJECT - PHASE II - GEOTECHNICAL
INVESTIGATION 43,281
Qatar AL JABER GROUP ABUDHABI TOWER - GROUND INVESTIGATION 695,348
Qatar BEITY PROPOSED G + 8 BUILDING AT OLD GHANEM - SITE
INVESTIGATION WORKS 5,452
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 53
Qatar COWI A/S BARWA AL KHOR DEVELOPMENT - GEOTECHNICAL
INVESTIGATIONS 194,926
Qatar CONSTRUCTION ENTERPRISES
COMPANY
CONSTRUCTION OF AL KHOR PORT CHANNEL - GEOTECHNICAL
INVESTIGATION 5,660
Qatar EL SEIF ENGINEERING CONTG DRILLING BOREHOLE 3,642
Qatar AL RIYADH TRADING & CONT.
CO. EARTHING BOREHOLES AT AL WAAB 1,904
Qatar QATAR KENTZ SOIL RESISTIVITY TEST 1,301
Qatar STS LUSAILPROJECT 43,712
Qatar DORNIER CONSULTING DRILLING INSTALLATION OF GROUNDWATER MONITOR WELLS
AT DUKHAN 107,945
Qatar TADMUR CONTRACTING &
TRADING EST
GEOTECHNICAL INVESTIGATION WORKS - FAHAHIL STRIPPING
PLANT IN DUKHAN 7,136
Qatar QDVC WEST BAY PARK SITE - SOIL INVESTIGATION 149,588
Qatar HYDER CONSULTING ME PACKAGE 1 - WAKRAH MAIN ROAD - GEOTECHNICAL
INVESTIGATION 101,582
Qatar HYDER CONSULTING ME PACKAGE 2 - MAJOR ROADS IN AL KHOR & AL HUWAILAH -
GEOTECHNICAL INVESTIGATION 113,318
Qatar HYDER CONSULTING ME PACKAGE 3 : ROADS & INFRASTRUCTURE - AIN KHALID 120,273
Qatar HYDER CONSULTING ME PACKAGE 4 - ROADS & INFRASTRUCTURE IN AL KHEESA NORTH
- GEOTECHNICAL INVESTIGATION 176,021
Qatar HYDER CONSULTING ME PACKAGE 5 : ROADS & INFRASTRUCTURE IN AL KHOR
INDUSTRIAL AREA 96,189
Qatar HYDER CONSULTING ME PACKAGE 6 : MKEINES UMMBAB LINK ROAD 155,687
Qatar AL FOWRIYA TRADING &
CONTRACTING G+1 SAFARI HYPER MARKET AT AIN KHALID DOHA 3,433
Qatar PUNJ LLOYD LTD SOIL RESISTIVITY SURVEY - WORK ORDER 1,370
Qatar CHIYODA CORPORATION BARZAN ONSHORE PLANNING PROJECT- GEOTECHNICAL
INVESTIGATION 120,890
Qatar AL UMMA TRADING &
CONTRACTING DRILLING GROUNDWATER WELLS AT BIN MAHMOUD AREA 4,110
Qatar SINOHYDRO CORPORATION CP1
PROJECT
LUSAIL DEVELOPMENT PRELIMINARY INFRASTRUCTURE WORKS
P GEOTECHNICAL INVESTIGATION 67,605
Qatar INTERNATIONAL CONTRACTING
& TRADING CO. QATAR FOUNDATION - DRILLING WATER WELL 4,438
Qatar HYDER CONSULTING ME PACKAGE 4 A - ROADS & INFRASTRUCTURE IN UMM QARN -
GEOTECHNICAL INVESTIGATION 36,177
Qatar ARUP IQ TOWER - THE CRYSTAL - GEOTECHNICAL INVESTIGATION 512,378
Qatar FERNAS CONSTRUCTION CO. DRILLING EARTHING BOREHOLES 24,690
Qatar SLAG AGGREGATE PRODUCER QUARRY FEASIBILITY STUDY 12,096
Qatar MEDCO QATAR BAHRIAN CAUSEWAY - SOIL INVESTIGATION 100,226
Qatar ATLAS INTERNATIONAL QSTRG STAGE -3 - DRILLING EARTHING BOREHOLE 24,164
Qatar EL SEIF ENGINEERING CONTG P94-NDIA, DRILLING BOREHOLES FOR EARTHING 102,753
Qatar DOPHA PETROLEUM CONT CO
LTD GRC 05/115 DRILLING EARTHING BOREHOLES 9,189
Qatar HYDER CONSULTING ME LUSAIL PUMPING STATION , GEOTECHNICAL INVESTIGATION
WORKS 43,984
Qatar ATELIERS JEAN NOUVEL NEW QATAR NATIONAL MUSEUM GEOTECHNICAL
INVESTIGATION 275,970
Qatar NEW VISION DRILLING EARTHING BOREHOLES AT SALWA ROADQ 1,644
2007
Location Client Project Value (US$)
Qatar CDE IRELAND LTD GEOTECHNICAL INVESTIGATION FOR SAND WASHING PLANT AT
AL KARANA 22,563
Qatar HYDRO ALUMINIUM AS QATALUM PROJECT – GEOTECHNICAL INVESTIGATION FOR
BRIDGES ACROSS COOLING WATER CHANNEL 10,931
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 54
Qatar JGC - KBR C/O QATAR SHELL GEOTECHNICAL WORKS FOR THE FIREWATER TANK / WEST
LAYDOWN AREA LOT W7A 9,445
Qatar JGC KBR - QATAR SHELL POTABLE WATER & FIRE WATER SYSTEM, CAMP AREA,
RASLAFFAN - GEOTECHNICAL INVESTIGATION 14,400
Qatar NIPPON KOEI CO. LTD / ASCO
CONSULTING ENGINEER
ABU HAMOUR SOUTHERN OUT FALL - GEOTECHNICAL AND
GEOPHYSICAL INVESTIGATION 224,459
Qatar STRABAG QATAR WLL PLANT OFFICE AREA BUILDINGS - GEOTECHNICAL
INVESTIGATION 14,015
Qatar PRIVATE ENGINEERING OFFICE /
GHD
PRIVATE BEACH VILLA AL THAKHIRA - GEO TECHNICAL
INVESTIGATION 11,740
Qatar CONSOLIDATED CONTRACTORS
INT'L CO. (CCIC)
QATARGAS II LNG FACILITIES PROJECT, RASLAFFAN - DRILLING
EARTHING BORE HOLE (CONTRACT GTC-QG-11-ONS-15) 149,658
Qatar GEA BARWA BUSINESS CENTER - GEOTECHNICAL & HYDROLOGICAL
INVESTIGATION 305,462
Qatar AL JABER ENERGY SERVICES COMMON SULPHUR PLANT, QATAR GAS II - RLIC,
GEOTECHNICAL INVESTIGATION 22,551
Qatar ENCANA INTERNATIONAL
(QATAR) LIMITED DRILLING WATER WELL & PUMPING TEST 61,200
Qatar RAS LAFFAN OLFINS COMPANY
LTD (RLOC) ETHYLENE PIPELINE - MESAIEED TOPOGRAPHICAL SURVEY 30,155
Qatar GEA GERMAN ENGINEERS AND
ARCHITECTS
BARWA BUSINESS CENTER - GEOTECHNICAL & HYDROLOGICAL
INVESTIGATION - 2ND PHASE 386,473
Qatar ATKINS QATAR FOUNDATION EDUCATION CITY - ADDITIONAL
GEOTECHNICAL INVESTIGATION 65,642
Qatar CBI SHELL PEARL GTL TANKAGE- CBI CONTRACT NO. 153130 -
GEOTECHNICAL SITE INVESTIGATION 803,320
Qatar STFA MARINE CONSTRUCTION CONSTRUCTION OF NEW TEMPORARY BERTH NO. 7 AT
MESAIEED - STAND PIPE INSTALLATION & ASS. WORKS 61,136
Qatar JGC MIDDLE EAST FZE GROUND WATER MONITORING WELLS CONSTRUCTION AT
DOLPHIN PROJECT 54,301
Qatar RAFAEL VINOLY ARCHITECTS ARAB MUSEUM OF MODERN ART - GEOTECHNICAL
INVETIGATION 117,722
Qatar JGC KBR - QATAR SHELL STORAGE OF CORE BOXES 23,836
Qatar FCB QNC-3 ANCHORS IN ROCK UMMBAB - DRILLING BOREHOLES
FOR ANCHORS 62,740
Qatar QATAR PRIMARY MATERIALS GEOLOGICAL PROSPECTING FOR SAND DEPOSITS, SOUTH
QATAR. SITE INVESTIGATION 79,301
Qatar QATAR PRIMARY MATERIALS QPMC SAND WASHING PLANT-SOUTH OF AL-KARANA, GROUND
INVESTIGATION 19,759
2006
Location Client Project Value (US$)
Qatar HALCROW DEVELOPMENT OF RUWAIS PORT PHASE 2, DRILLING
EARTHING BOREHOLES 89,067
Qatar HALCROW NEW DOHA INT’L AIRPORT, AIRLINE OPERATIONS FACILITIES
GEOTECHNICAL INVESTIGATION 112,182
Qatar GULF ENGINEERING MULTI PURPOSE ADMIN. COMPLEX – RASLAFFAN,
GEOTECHNICAL INVS. 68,000
Qatar PUNJ LLOYD NDIA FUEL SYSTEM-GEOTECHNICAL & GEOPHYSICAL SIOL
INVESTIGATION 153,829
Qatar CTJV AL KHALEEJ PROJECT PHASE 2, GEOTECHNICAL &
TOPOGRAPHICAL SURVEY 52,250
Qatar IMCO DRILLING EARTHING BOREHOLES & INSTALLATION OF EARTH
RODS 40,288
Qatar CHIYODA TECHNIP AL KHALEEJ GAS PROJECT 28,125
Qatar QATAR SHELL GTL PEARL GTL PROJECT PI-017, HARBOUR TANK FARM INTERIM
SITE INESTIGATION 90,297
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 55
Qatar HALCROW OLD DOHA PORT REDEVELOPMENT GEOTECHNICAL
INVESTIGATION 28,127
Qatar HYDER CONSULTING LUSAIL DEVELOPMENT GROUND WATER INVESTIGATION 377,632
Qatar STS CONSULTANTS QATAR CONVENTION CENTER & TOWER GEOTECHNICAL SITE
INVESTIGATION 255,556
Qatar ELLERBE BECKET SPECIALITY TEACHING HOSPITAL IN EDUCATION CITY,
GEOTECHNICAL INVS. 48,564
Qatar CHIYODA TECHNIP QATAR LIQUIFIED GAS CO PMP/AGX PROJECT GEOTECHNICAL
& TOPOGRAPHICAL SURVEY 96,497
Qatar FCB CEMENT THIRD EXTENSION OF UMMBAB CEMENT PLANT-
GEOTECHNICAL INVESTIGATION 52,844
Qatar CHIYODA TECHNIP QATAR GAS 3 & 4 ONSHORE PROJECT TRAINS 6 & 7 SUB
CONTRACTORS CAMP 31,280
Qatar HYDRO ALUMINIUM AS QATALUM PROJECT-GEOTECHNICAL INVESTIGATION 12,986
Qatar BAUER INTERNATIONAL OLD GHANIM SITE DRILLING GROUND WATER MONITORING
WELL 22,132
Qatar QATAR KENTZ RL3 COMMON OFFLOT PROJECT-RASLAFFAN 37,836
Qatar QATAR KENTZ PEARL GTL PLANT TANK AREA BOREHOLE WORK 75,973
Qatar QATAR SHELL PEARL GTL PROJECT CONSTRUCTION CAMP TRIAL PIT WORK 30,462
Qatar QAPCO SIOL & WATER CONTAMINATION SURVEY IN AREA A & B OF
QATOFIN PROJECT 85,622
Qatar CBI CBI CONTRACT # 146682, RASLAFFAN GEOTECHNICAL
INVESTIGATION 88,638
Qatar GALFAR ALMISNAD EPIC UMMBAB TO SALWA ROAD DUAL CARRIAGE, EARTHING
BOREHOLES 112,534
Qatar LINDE AG AIR SEPERATION UNITS, RASLAFFAN –
PEARL QATAR, GEOTECHNICAL INVS. 109,671
Qatar JGC-KBR C/O QATAR SHELL PEARL GTL PROJECT ADDITIONAL CAMP SOIL INVESTIGATION
WORK 95,463
Qatar AL-JABER & PARTNERS PEARL PROJECT-EFFLUENT TREATMENT PLANT, GEOTECHNICAL
INVESTIGATION 432,359
Qatar GALFAR ALMISNAD CONSTRUCTION OF ROADS, UTILITY CROSSINGS & STREET
LIGHTING IN INDUSTRIAL AREA, MESAIEED 25,077
Qatar HYDRO ALUMINIUM AS QATALUM PROJECT – ADDITIONAL TOPOGRAPHICAL,
BATHYMETRICAL & GEOTECHNICAL INVESTIGATION 107,103
2005
Location Client Project Value (US$)
Qatar MANNAI CORPORATION WAREHOUSE AT STREET 23/24 SALWA INDUSTRIAL AREA 3,658
Qatar QATAR DREDGING CO. PEARL OF THE GULF PROJECT – DOHA 47,136
Qatar HYDRO ALUMINIUM AS QATAR ALUMINIUM PROJECT 266,858
Qatar J & P QATAR W.L.L ERC 0492/C1 AL GHARRAFFA INTERCHANGE 2,411
Qatar KBAS CONTRACTIN & TRADING QUARRY FEASIBILITY AT KARAMA 17,205
Qatar INDUSTRIAL SERVICE GROUP OFFICE BLDG (2B +G + 9) AT NEW KHOLAIFAT 6,027
Qatar CHIYODA CORPORATION RASGAS NEW CAMP AREA FOR TRAIN 6 & FEED PROJECT 78,840
Qatar KBAS CONTG & TRADING KHALIFA STADIUM 1,842
Qatar MANNAI CORPORATION WARE HOUSE AT ST 23/24 SALWA INDUSTRIAL AREA –
ENVIRONMENTA SAMPLING & TESTING 3,658
Qatar C C C RAS LAFFAN EXPANSION PROJECT GROUND WATR
MONITORING WELLS 7,397
Qatar KBAS CONTRACTING SALAM STREET / DRILLING OF SOAKWAY BOREHOLES 5,589
Qatar JGC MIDDLE EAST FZE DOLPHIN – UPSTREAM AND COMPRESSION FACILITIES 18,315
Qatar MTC SURVEY QAFAC II & GEOTECHNICAL SURVEY 39,082
Qatar MTC SURVEY NEW BRITISH EMBASSY OFFICES RESIDENCE & AMENITIES
TOPOGRAPHICAL & GEO TECHNICAL SURVEY 12,671
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 56
Qatar CHIYODA CORP SOIL INVESTIGATION & TOPOGRAPHICAL SURVEY – QATAR GAS
III – PROJECT QATAR GAS 3 FEED PROJECT RASLAFFAN 304,372
Qatar J & P DRILLING BORE HOLES OUR QUOTE ER/6553 4,171
Qatar QATAR KENTZ WLL QATARGAS II DEVELOPMENT PROJECT RLIC CAMP AREA,
RASLAFFAN, (7-BOREHOLES, SOIL & ROCK SAMPLING LAB TEST) 9,849
Qatar FBJ ENTERPRISES VILLA COMPLEX LUQTA – GEOTECHNICAL INVESTIGATION 5,971
Qatar GULF ENGINEERING &
INDUSTRIAL CONSULTANCY
BMC 2004023 CONSULTANCY QTY SURVEY FOR AQUATIC &
FISHERIES REASEARCH CENTRE AT WAKRAH 33,879
Qatar SMEC INTERNATIONAL HALUL ISLAND REMEDIATION 103,667
Qatar COWI A/S NORTH BEACH DEVELOPMENT ADDITIONAL BOREWELL 3,397
Qatar QATAR KENTZ 524-QG-II LABOUR CAMP FACILITIES PHASE II – RASLAFFAN 6,685
Qatar DODSAL PTE LTD DOLPHIN UPSTREAM & COMPRESSION FACILITIES PROJECT RLIC
– DRILLING EARHING BOREHOLES 3,767
Qatar PENINSULAR PETROTECH ENG. HALUL TANK CP SYSTEM, DRILLING BOREHOLES FOR CATHODIC
PROTECTION 61,349
Qatar ARAB CONSULTING ENGINEERS 15 NEW SCHOOLS AROUND DOHA AND VILLAGES 50,137
Qatar CPC/LATTANZI DOHA AIRPORT – GEOTECHNICAL INVESTIGATION 5,765
Qatar QATAR PETROLEUM GEOTECHNICAL INV. FOR GABBRO PROJECT 346,927
Qatar DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 5,308
Qatar KELLOG BROWN ROOT FEED FOR RATIONALIZATION OF CONTROL SYSTEM AT
KHATIYAH AND FAHAHIL DEGASSING STATION 15,795
Qatar TRAGS AL KHOR CLUB CONVERSION – EARTHING BOREHOLES 5,088
Qatar C.D.C BARJEEL RESIDENTIAL TOWERS AT WEST BAY – PILING AND
EXCAVATION WORKS 123,844
Qatar J & P DRILLIJNG BORE HOLE FOR STREET LIGHTING 1,956
Qatar ALHUDA ENG WORKS DEVELOPMENT OF KHALIFA TENNIS & SQUASH 4,877
Qatar Q-CON EPIC OF 11KV DUKHAN TOWNSHIP NETWORK UPGRADE 18,808
Qatar ATKINS PRIMARY INFRASTRUCTURE DESIGN SERVICES FOR EDUCATION
CITY 110,818
Qatar QATAR PETROCHEMICAL HIGH COD TANK IN ETHYLENE PLANT GEOTECHNICAL
INVESTIGATION 7,767
Qatar ATKINS FEED FOR LPG PIPELINE FROM QP REFINARY TO NEW LPG
BOTTLING PLANT 42,941
Qatar PRIVATE ENGINEERING OFFICE VILLA AT AL THAKIRA – GEOTECHNICAL INVESTIGATION 5,589
Qatar GULF DESIGN PROPOSED BUILDING AT A-RING ROAD FOR AHMED DARWISH 5,247
Qatar ATKINS QATAR PRIMARY ROUTES DHUKAN HIGHWAY 74,014
Qatar CHIYODA TECHNIP JOINT
VENTURE
ADDITIONAL TOPOGRAPHICAL SURVEY OF DESALINATED
WATER PIPES ROUTE AND GEOTECHNICAL INVESTIGATION AT
LEAN LNG TANK AREA
28,962
Qatar SLAG AGGREGATE PRODUCER QUARRY FEASIBILITY STUDY AT KARAMA 7,808
Qatar AL-SAAD CONSULTING ENG 2B+G+M+14+SERVICE FLOOR FOR DR. SUMAIKH AT OLD
SALATA 9,781
Qatar CTJV RASGAS ONSHORE/ONPLOT EXPANSION PROJECT – GEOTECH
INVESTIGATION 78,840
Qatar SILVER ARACH PROPOSED G+5 BUILDING AT UMM GHUWALINA 4,384
Qatar CCC/TEYSEER JV QATAR GAS II DEVELOPMENT PROJECT RASLAFFAN – DRILLING
GROUND WATER 18,630
Qatar QATAR PETROLEUM GEOTECHNICAL INVESTIGATION FOR THE GABBRO SUPPORT
SERVICES 346,927
Qatar CDC BARJEEL RESIDENTIAL TOWER AT WEST BAY – PILING AND
EXCAVATION WORKS 123,844
Qatar TEFFEN EPIC OF RASLAFFAN, MESAIEED ETHANE TRANSMISSION
PIPELINE PROJECT 37,151
Qatar WS ATKINS NEW DOHA INTERNATIONAL AIRPORT – INFRASTRUCTURE
ROAD PRELIMINARY DESIGN 106,135
Qatar HALCROW LTD MUSEUM OF ISLAMIC ARTS – GEOTECHNICAL INVESTIGATION 27,555
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 57
2004
Location Client Project Value (US$)
Qatar CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN 161,995
Qatar KETTANESH CONSTRUCTION RAS LAFFAN LNG TANK-5 40,860
Qatar AL HUDA ENGINEERING WORKS KHALIFA SPORTS HALL – DOHA 12,329
Qatar DOHA PETROLEUM CONST. CO. HELIUM RECOVERY UNIT – RAS LAFFAN 18,767
Qatar AMERICAN INT’L.
CONTRACTORS INC. (AICI)
MILLENNIUM VILLAGE FACILITIES – AL UDEID AIRBASE 11,849
Qatar CHIYODA CORPORATION AL KHALEEJ GAS PROJECT – LPG TANKS – RAS LAFFAN 50,431
Qatar QATAR PETROLEUM GEOTECHNICAL INVESTIGATION FOR PHOTOGRAPHY MUSEUM 41,856
Qatar ENELPOWER RAS LAFFAN POWER & DESALINATION STATION 14,932
Qatar LG ENGG. & CONST. CORP. –
KOREA
QP LAB PROJECT – MESAIEED 20,966
Qatar OVERSEAS BECHTEL,
INCORPORATED – UK
NEW DOHA INTERNATIONAL AIRPORT PROJECT 1,730,653
Qatar CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN (ON-
PLOT) 121,185
Qatar W.S ATKINS & PARTNERS DUKHAN ROAD – DETAILED DESIGN 40,592
Qatar AL ATTIYAH CONTG. & TRADG.
CO.
ERC 0588 C1 RIW IN NORTH OF DUHAIL – STAGE 2 16,767
Qatar CHIYODA CORPORATION RLIC – CAMP AREA 106,443
Qatar DORNIER CONSULTING GROUNDWATER ASSESSMENT PROJECT – MONITORING WELLS
IN DUKHAN 45,842
Qatar MECON QAPCO EXPANSION PROJECT – MESAIEED 26,458
Qatar DORNIER CONSULTING GROUNDWATER ASSESSMENT – HALUL ISLAND 24,932
Qatar JAMES CUBITT & PARTNERS
ENGINEERING CONSULTANCY
LAFFAN TOWER (3 B+G+M+32+2 P+15) ADMINISTRATIVE
TOWER AT WEST BAY 11,767
Qatar
JOANNOU & PARASKEVAIDES
QATAR W.L.L.
ERC 0492/C1 – AL GHARRAFFA INTERCHANGE
34,603
Qatar
QATAR PETROLEUM LTC 172/03 – BASELINE SURVEY AND MONITORING OF THE
GROUNDWATER MONITORING WELLS IN MESAIEED INDUSTRIAL
CITY 281,418
Qatar FCB CEMENT QATAR CEMENT PLANT UMM BAB 27,123
Qatar CHIYODA CORPORATION QATARGAS II LNG PLANT PROJECT – SULPHUR HANDLING AREA
& PIPELINE ROUTE 61,014
Qatar BUZWAIR E&C. ERC 0390 C5 – DESIGN & CONST. OF ACCESS ROADS TO
MOTORCYCLE RACETRACK 15,452
Qatar MARUBENI GTC 1/2002 – POWER SUPPLY TO QATAR FOUNDATION AND
132kV OHL REPLACEMENT BY CABLE IN GHARRAFA – DOHA 52,041
Qatar COWI – QATAR NORTH BEACH DEVELOPMENT – DOHA 727,617
Qatar QATAR PETROLEUM SO # 30443 – FIREWALL TANK AT FAHAHIL STRIPPING PLANT 6,493
Qatar MMAA – DRAINAGE DEPT. 7A+7B+7E – ABU HAMOUR SOUTHERN OUTFALL 20,990
Qatar ATKINS NEW QASCO DIRECT REDUCTION IRON FACILITY 7,397
Qatar INDUSTRIAL SERVICES GROUP TOWER BUILDING AT WEST BAY 7,808
Qatar NASSER S. AL HAJRI CO. LTD. DOLPHIN ONSHORE FACILITIES PROJECT – RAS LAFFAN 136,986
Qatar QATAR DREDGING CO. NDIA – CORE DRILLING IN ROCK OUTCROP 11,616
Qatar QATAR LIQUEFIED GAS CO. AMINE REGENERATION UNIT AREA 7,808
Qatar MEDGULF CONST. CO. GTC 04/175/ED – EPIC OF NEW PRODUCTION & INJECTION
WELLS AT ARAB D PLANT IN DUKHAN 25,327
Qatar ATKINS DUKHAN HIGHWAY – ADDITIONAL BOREHOLES 16,896
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 58
Qatar RMJM – DUBAI DUBAI TOWER – DOHA 583,578
Qatar CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN 8,135
Qatar MOHAMED BIN MUBARAK
SALEH AL KULAIFI
DEVELOPMENT AT WEST BAY LAGOON – DOHA 6,671
Qatar TRADING & AGENCY SERVICES DUKHAN FITNESS CENTRE, DUKHAN TOWNSHIP 11,027
*Pre-2004 project references are available on request.
Major Completed Projects and On-going Projects Laboratory (Qatar)
Client Project Details Period
DESCON ENGINEERING SHELL GTL AND OTHER VARIOUS
PROJECT LABORATORY TESTING WORKS 10/01/2012 On going
PUNJ LLOYD PLOYSILICON PLANT RASLAFFAN LABORTORY TESTING WORKS 10/01/2012 On going
MEDGULF CONSTRUCTION TEST FOR EARTH WORKS CONCRETE AND ASPHALT
TESTING 22/01/2012
BOOM GENERAL CONSTRUCTION PWA/GTC/011/08-09 – CONSTRUCTION
AND MAINTTENANCE OF AL KHOR PARK LABORATORY TESTING WORKS 29/01/2012 On going
CONSTRUCTION DEVELOPMENT
COMPANY
P347/QATAR FOUNDATION OFFSITE
WARE HOUSE AT INDUSTRIAL AREA CONCRETE TESTING WORKS 15/02/2012 On going
MIDMAC CONTRACTING CONSTRUCTION OF QF H.Q AND
STRATEGIC STUDIES CENTRE ANALYSIS OF POTABLE WATER 28/02/2012 On going
QATAR GAS QGII-CWO-CSP-1174-11 – SOIL
SAMPLING WITHIN JETTY OFFICES SOIL SAMPLING 08/03/2012 On going
BUZWAIR ENGINEERING &
CONTRACTING
PWA/GTC/073/2010/2011 ROAD
IMPROVEMENT IN RAYYAN AREA –
PHASE 2
SOIL SAMPLING 03/04/2012 On going
COWI SAMPLING AND ANALYSIS FOR SOIL AND
GROUND WATER
SOIL AND GROUND WATER
SAMPLING 06/05/2012 On going
Q-CON 02-N2, PIPELINE BACKBONE IN
RASLAFFAN LABORATORY TESTING SERVICES 07/06/2012 On going
QATAR KENTZ JETTY BOIL OFF-GAS PROJECT LABORATORY TESTING WORKS
PHYSICAL, CHEMICAL & CEMENT 17/06/201 On going
SINOHYDRO GROUP KAHRAMA AWARENESS PARK PROJECT LABORATORY TESTING WORKS 01/07/2012 On going
RAS GIRTAS RGPC-LAB-002-2012 – LABORATORY
TESTING WORKS LABORATORY TESTING WORKS 18/07/2012 On going
TECHNIP
FEASIBILITY STUDY & CONCEPT
OPTIMIZATION – EFFLUENT TREATMENT
PLANT
SPENT CAUSTIC SAMPLING AND
ANALYSIS 19/07/201 On going
KEPPEL SEGHERS DOHA NORTHSEWAGE TREATMENT
WORKS CP-682/10
COMPACTION TESTING USING
NUCLEAR DENSITY GAUGE 07/08/2012 On going
SAMSUNG ENGINEERING LAFFAN REFINERY DIESEL –
HYDROTREATER PROJECT
PROVISIONOF CONCRETE
QUALITY CONTROL ENGINEER 12/09/2012 On going
KEPPEL SEGHERS DOHA NORTH SEVAGE TREATMENT THIRD PARTY LAB ANALYS Jan 2011 On going
PARSONS WASTEWATER ANALYSIS REQUIRED BY
PUBLIC WATER AUTHORITY WASTE WATER ANALYSIS Jan 2011 – Feb 2011
HYDER CONSULTING
EXPANSION OF INDUSTRIAL AREA
SEWERAGE TREATMENT FACILITY –
SECOND PHASE
SLUDGE SAMPLING AND
ANALYSIS Jan 2011- March 2011
QATAR PETROCHEMICAL
COMPANY
GROUND WATER SAMPLING AND
ANALYSIS LABORATORY TESTING WORKS Feb 2011 – Nov 2011
REDCO INT’L Burj marina LABORATORY TESTING WORKS Mar 2011 On going
HYDER CONSULTING PACKAGE 24 – AL KHOR – AL THAKIRA SOIL AND GROUND WATER
SAMPLING Apr 2011 - Oct 2011
DEGREMONT MARUBANI DOHA WEST SEWAGE TREATMENT
WORKS WASTE WATER ANALYSIS Apr – 2011 On going
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 59
QATAR GAS SOIL SAMPLING AND ANALYSIS SOIL SAMPLING AND ANALYSIS Apr 2011 – On going
QATAR ALUMINIUM (QATALUM) SEA WATER SAMPLING AND ANALYSIS SEA WATER SAMPLING AND
ANALYSIS May -2011 Ongoing
QATAR SHELL GTL LTD PEARL GTL TEMPORARY LAB TESTING –
CALL OFF SERVICE May 2011 On going
QATAR SHELLGTL RESEARCH AND
TECHNOLOGY CENTRE
TECHNOLOGY & SCIENCE PARK – QATAR
FOUNDATION
ANALYSIS OF
DESULPHIRIZATION SOLUTION
FOR HEAVY METALS
June 2011 On going
QATAR ENGINEERING AND
CONSTRUCTION CO. JETTY BOIL OF GAS RECOVERY LABORATORY TESTING WORKS June 2011 Ongoing
DOLPHIN ENERGY DOLPHIN PLANT RAS LAFFAN GROUND WATER SAMPLING
AND TESTING SERVICES June 2011 On going
AL HUDA ENGINEERING
CONSTRUCTION OF SUPREME
EDUCATION COUNCIL HEAD QUARTERS
BUILDING
LABORATORY TESTING WORKS Jul 2011 – On going
REDCO INT’L QATAR AIRWAYS CREW
ACCOMMODATION
SOIL SAMPLING AND
LABORATORY TESTING WORKS
Jul 2011 On going
REDCO INT’L DOHA LAND LABORATORY TESTING WORKS Jul 2011 On going
QATAR FERTILIZERS (QAFCO) QAFCO – 5 PROJECT RECLAIMED/DREDGED
MATERIAL SAMPLING ANALYSIS Jul 2011 On going
MIDMAC TARMAC NDIA LABORATORY TESTING WORKS Aug 2011 On going
REDCO INT’L 5 SCHOOLS AROUND DOHA & VILLAGE SOIL SAMPLING AND
LABORATORY TESTING WORKS
Aug 2011 On going
TECHNITAL BEACH DEVELOPMENT AT RAS
USHAYRIQ PENINSULA ENVIRONMENTAL TETING
Aug 2011
Oct 2011
NASSER AL HAJRI BARZAN ONSHORE FACILITIES LABORATORY TESTING WORKS Sep 2011 On going
WORELY PARSON ENVIRONMENTAL IMPACT ASSESSMENT
AT AL KARANA AND BIRKA ENVIRONMENTAL TESTING
Oct 2011
Nov 2011
YUKSEL MIDMAC DOHA EXPRESS – PACKAGE 7 NUCLEAR DENSITY Nov 2011 On going
GALFAR AL MISNAD CONCRETE CORING AT QATAR GAS
BUILDING AT WEST BAY CONCRETE CORING
Nov 2011
Dec 2011
JGC CORPORATION BARZAN ONSHORE PROJECT SAMPLING AND ANALYSIS OF
WATER Nov 2011
Q-CON PLATEAU MAINTENANCE PROJECT LABORATORY TESTING WORKS Dec 2011 On going
TECHNITAL DEVELOPMENT OF AL WAKRA JETTY ENVIRONMENTAL TESTING Dec 2011
On going
PUBLIC WORK AUTHORITY
(ASHGHAL) TENDER#AA/DOM/10-11M/1398
DRAINAGE NETWORKS
ANALYSTICAL PROGRAMME Jan 2011 Ongoing
HYDER CONSULTING`
DA/07-08/D/025/1 – SECOND PHASE
EXPANSION OF INDUSTRIAL AREA
SEWERAGE TREATMENT FACILITY
EXPANSION OF INDUSTRIAL
AREA SEWAGE TREATMENT
FACILITY
Jan 2011 Feb 2011
SINOHYDRO CORPORATION NDIA – CP- 1 PROJECT – LUSAIL
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE ,
STEEL AND ASPHALT TESTING
Year 2008 and Ongoing
HYUNDAI ENGINEERING QAFCO 5 & QAFCO 6
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE , AND
ASPHALT TESTING
July 2008 Ongoing
J&P PARASKEVAIDES MALE & FEMALE STUDENTS HOUSING
AT QATAR FOUNDATION
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE
TESTING
Nov 2010 - Ongoing
KETTANEH CONSTRUCTIONS PLATEAU MAINTENANCE PROJECT ON
SHORE FACILITIES RAS LAFFAN
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE
TESTING
Nov 2011 On going
QATAR CONSTRUCTION
ENGINEERING
Q3 99 – WASTE WATER DISPOSAL
SURFACE FACILITIES
SOIL, AGGREGATE AND
CONCRETE TESTING - CALL ON
BASIS
Feb 2011 On going
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 60
QATAR CONSTRUCTION
ENGINEERING
CONSTRUCTION OF OPERATATOR
SHELTER LIFTING STATION AND SEWER
NETWORK – DOLPHIN
SOIL, AGGREGATE AND
CONCRETE TESTING - CALL ON
BASIS
Dec 2012 On going
QATAR CONSTRUCTION
ENGINEERING Q 356 – HALUL ISLAND
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE , AND
TESTING
Feb 2011 On going
QATAR ENGINEERING &
CONSTRUCTION CO QAFCO MELAMINE
SOIL, CONCRETE AND IN-SITU
TESTING
Feb 2008
May 2011
QATAR ENGINEERING &
CONSTRUCTION CO DOLPHIN
SOIL, CONCRETE AND IN-SITU
TESTING Apr 2008 May 2011
QATAR ENGINEERING &
CONSTRUCTION CO INTERIM MODIFICATION
SOIL, CONCRETE AND IN-SITU
TESTING Aug 2010 – Feb 2011
QATAR ENGINEERING &
CONSTRUCTION CO ORYX GTL
SOIL, CONCRETE AND IN-SITU
TESTING Sep 2010 – Mar 2011
SUB SEA PROTECTION SYSTEM LLC ARAMCO CONCRETE TESTING Mar 2011 –
Oct 2011
MIDMAC CONTRACTING NDIA CP 14- AIRSIDE & LAND SIDE ROAD
WORKS
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE , AND
ASPHALT TESTING
Feb 2006 - Ongoing
MIDMAC CONTRACTING NDIA CP 28- PASSENGER TERMINAL -
FOUNDATIONS
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE , AND
ASPHALT TESTING
Aug 2007 – Sept 2009
CCIC NDIA CP 17 – AIR TRAFFINC CONTROL
SUPPORT & FACILITIES
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE , AND
ASPHALT TESTING
Apr 2007 – Sep 2011
CCIC NDIA CP 27 – MIDFIELD AREAS ACCES
SYSTEM
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE , AND
ASPHALT TESTING
October 2007 - Ongoing
CCIC NDIA – CP 96
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE , AND
ASPHALT TESTING
Mar 2011 On going
CCIC NDIA – CP 19
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE , AND
ASPHALT TESTING
Mar 2011 On going
CCIC NDIA- CP 95
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE , AND
ASPHALT TESTING
Mar 2011 On going
CCIC NDIA CP - 93
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE , AND
ASPHALT TESTING
Mar 2011 On going
CCIC NDIA CP - 76
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE , AND
ASPHALT TESTING
Mar 2011 On going
BILFINGER BERGER BARWA CITY PHASE 1
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE , AND
ASPHALT TESTING
Sep 2007 – Ongoing
REDCO INTERNATIONAL BARWA CITY PROJECT CONCRETE AND MATERIAL
TESTING Jan 2010 – Ongoing
REDCO INTERNATIONAL LUSAIL READYMIX
ONSITE LABORATORY FOR SOIL,
AGGREGATE , AND CONCRETE
TESTING
March 2010 Mar 2011
REDCO INTERNATIONAL 12 NEW DEPARTURE GATE AT DIA CONCRETE AND MATERIAL
TESTING – CALL ON BASIS
March 2011
On going
REDCO INTERNATIONAL SIMULATOR CENTRE (QATAR AIRWAYS) CONCRETE AND MATERIAL
TESTING – CALL ON BASIS Jan 2011 Ongoing
GALFAR AL MISNAD CONSTRUCTION OF THE CULTURAL
VILLAGE
CONCRETE, MATERIALS AND IN-
SITU TESTING Jan 2009 – April 2010
GALFAR AL MISNAD CONSTRUCTION OF THE
INFRUSTRUCTURE FOR KATARA
CONCRETE, MATERIALS AND IN-
SITU TESTING July 2010 – Ongoing
GALFAR AL MISNAD EPIC FOR PRODUCED WATER CONCRETE, MATERIALS AND IN-
SITU TESTING Feb 2010 - Ongoing
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 61
RENCO QATAR CP-35 AIR TRAFFIC & METEOROLOGICAL
SPECIFIC EQUIPMENT
CONCRETE AND MATERIAL
TESTING Oct 2010 – Dec 2011
GCC / SELEX CP-35 CONCRETE AND MATERIAL
TESTING March 2011 Dec 2011
DEGREMONT DOHA WEST STP SEWAGE WATER ANALYSIS Jan 2009 On going
DEGREMONT BARWA HOUSING PROJECT SEWAGE WATER ANALYSIS Mar 2010
Aug 2011
FIVE OCEANS – OMAN ODC ENVIRONMENTAL MONITORING ENVIRONMNETAL ANALYSIS Dec 2010 On going
GHD 75/10530/02 – CONSTRUCTION SITE SOIL & WATER ANALYSIS
QDVC SHERATON CAR PARK GROUND WATER ANALYSIS Feb 2011
Jul 2011
TCJV PMP DRINKING WATER ANLYSIS Feb 2011 On going
ZOOM STEEL MINING & EXPLORATORY WORKS -
OMAN CHEMICAL ANALYSIS OF ROCK Jan 2010 – April 2010
TECHNITAL UPD/TAC/T/04/08-09 NOISE MONITORING &
ECOLOGICAL SURVEY Nov 2010 – May 2011
ULTRA CONSTRUCTION DOHA NORTH SEWAGE & ASSCOCIATED
WORKS ENVIRONMNETAL ANALYSIS Sept 2009 – Oct 2011
IBER DROLA MESAIEED POWER PLANT ENVIRONMENTAL SAMPLING &
ANALYSIS June 2008 – JUL 2010
NEW DOHA PORT PROJECT
COMMITTEE NEW DOHA PORT
ENVIRONMENTAL SAMPLING &
ANALYSIS March 2010- Mar 2011
HYDER CONSULTANTS MMUP- CONCEPT DESIGN OF
ROAD/INFRASTRUCTURE. NOISE MONITORING
Dec2009
May 2010
HYDER CONSULTANTS MMUP- CONCEPT DESIGN OF
ROAD/INFRASTRUCTURE. NOISE MONITORING
Sept 2008
Apr 2010
MIDMAC - TARMAC DOHA INTERNATIONAL AIRPORT ADDITIONAL 14 BAY APRONS AT
DOHA INTERNATIONAL AIRPORT Jan 2009 – Sept 2009
DANWAY QATAR GTC/07/122/ED- SUB STATIONS AT
DUKHAN OIL FIELDS SOIL & IN-SITU TESTING OWRKS June 2008 – Dec 2009
ASCO NAKHILAT SHIP REPAIR YARD, RAS
LAFFAN SOIL & IN-SITU TESTING OWRKS Aug 2009 – Dec 2010
ASCO EMERGENCY & SAFETY COLLEGE, RAS
LAFFAN SOIL & IN-SITU TESTING OWRKS June 2009 – Ongoing
CCIC CBCS – QATAR FOUNDATION CONCRETE TESTING Aug 2007 – Mar 2008
CHIYODA TECHNIP JOINT VENTURE
– CTJV QATAR GAS 3 & 4
POTABLE WATER SAMPLING
AND ANALYSIS June 2008 – Ongoing
COMPASS CATERING QATALUM SEWAGE WATER ANALYSIS April 2008 – May 2010
COMPASS CATERING QATALUM PROJECT POTABLE WATER ANALYSIS April 2008 – May 2010
COMPASS CATERING QATAR SHELL GTL POTABLE WATER ANALYSIS March 2009 - Ongoing
COWI QATALUM GROUND WATER ANALYSIS Aug 2008 – Mar 2011
CONSPEL QATAR CHILLED WATER NETWORK AT PEARL
QATAR CHILLED WATER ANALYSIS July 2010 - Ongoing
DESCON ENGINEERING QATAR SHELL GTL ALL TESTING WORKS INCLUDING
ON-SITE LABORATORY Sep 2008 – Feb 2011
DOLPHIN ENERGY GROUND WATER MONITORING WELLS ENVIRONMENTAL ANALYSIS Aug 2009 - Ongoing
GULF DRILLING RIG – GULF4, AL ZUBARAH, ADL DOHA,
GULF 3
POTABLE WATER AND SEWAGE
WATER ANALYSIS Aug 2008 – Ongoing
J&P PARASKEVAIDES PEARL QATAR SOIL AND AGGREGATE TESTING Feb 2009 – Ongoing
J&P PARASKEVAIDES
CONSTRUCTION OF ADVANCE WORKS
FOR THE CONVENTION CENTRE - QATAR
FOUNDATION
ONSITE LABORATORY FOR SOIL,
AGGREGATE , CONCRETE
TESTING
Aug 2009 – Aug 2010
J&P PARASKEVAIDES AL WAKRAH HOSPITAL ASPHALT TESTING Jun 2010 – May 2011
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 62
ITT WATER & WASTE WATER - UK DOHA SOUTH STW SAMPLING & ANALYSIS OF
SEWAGE WATER AUG 2010 – OCT 2010
JANDENUL DREDGING GABBRO BERTH EXPENSION ENVIRONMENTAL ANALYSIS Aug 2009 – Feb 2010
JANDENUL DREDGING GABBRO BERTH EXPENSION SOIL AND AGGREGATE TESTING Aug 2009 – Feb 2010
VEOLIA QATAR DOHA SOUTH STW & INDUSTRIAL AREA
STP
SAMPLING & ANALYSIS OF
SEWAGE WATER AUG 2009 – OCT 2010
KEPPEL SHEGERS AL DHAKEERA SEWAGE TREATMENT
PLANT SEWAGE WATER ANALYSIS Oct 2008 – Ongoing
KEPPEL SHEGERS DOHA NORTH SEWAGE TREATMENT
WORKS SEWAGE WATER ANALYSIS Oct 2008 – Ongoing
METITO AL KHOR STP SEWAGE WATER ANALYSIS Jun 2009 – Ongoing
METITO DOHA WEST SEWAGE WATER ANALYSIS March 2010 Jun 2011
METITO QATALUM WWTP SEWAGE WATER ANALYSIS Aug 2010 – Jun 2011
METITO PEARL QATAR SEWAGE WATER ANALYSIS Dec 2009 – Jun 2011
QATAR ALUMINUM QATALUM SEA WATER AND WASTE
WATER ANALYSIS Jan 2010 – Ongoing
QATAR AIRWAYS WATER ANALYSIS POTABLE WATER ANALYSIS Apr 2010 – Ongoing
QATAR SHELL GTL PEARL GTL WASTE WATER ANALYSIS Dec 2009 – Oct 2011
QATAR KENTZ RASLAFFAN POTABLE WATER ANALYSIS Jan 2009 – Ongoing
QATAR COOL PEARL QATAR CHILLED WATER ANALYSIS Apr 2010 – Ongoing
QATAR COOL WEST BAY DISTRICT COOLING CHILLED WATER ANALYSIS Apr 2010 – Ongoing
QATAR PETROLEUM BASLINE SURVEY OF GROUND WATER
MONITORING WELLS ENVIRONMENTAL ANALYSIS Jan 2010 – Ongoing
QATAR VINYL COMPANY MESAIEED ENVIRONMENTAL ANALYSIS Jul 2009 - Ongoing
REDCO GROUP RAYYAN PALACE SOIL AND IN-SITU TESTING Apr 2010 – May 2011
SCHLUMBERGER ASGHAL, VINCI ENVIRONMENTAL ANALYSIS Nov 2009 – Ongoing
STRABAG QATAR QATAR SHELL PEARL GTL CONCRETE AND MATERIAL
TESTING Jan 2008 – May 2010
SIX CONSTRUCT SEWAGE TREATMENT PLANT SEWAGE WATER SAMPLING
AND ANALYSIS Aug 2010 – Ongoing
SIX CONSTRUCT RO PLANT POTABLE WATER ANALYSIS Aug 2010 – Ongoing
TRANSFIELD MANNAI AL WOSAIL TOWER, QATAR
FOUNDATION POTABLE WATER ANALYSIS Aug 2009 – Aug 2011
WAAGNERBIRO QATAR ASGHAL SEWAGE WATER SAMPLING
AND ANALYSIS Oct 2009 - Ongoing
TEKFEN QATAR NORTH ROAD CONCRETE TESTING Jan 2008 – Jun 2009
GULF CEMENT CO NEW CEMENT FACTORY, UMMBAB-
FEASIBLITY STUDY.
CHEMICAL ANALYSIS ON
LIMESTONE Oct – Dec 2006
CCIC RLX, RAS LAFFAN GROUND WATER MONITORING April 2006 – Feb 2011
JGC MIDDLE EAST DOLPHIN, RAS LAFFAN GROUND WATER MONITORING Oct 2005 – Mar 2010
SYNOHYDRO GAMUDA NEW DOHA INT’NATIONAL AIRPORT ENVIRONMENTAL TESTING &
POTABLE WATER ANALYSIS April 2006 - Ongoing
METITO PROJECT; C705 ENVIRONMENTAL TESTING Dec 2006 – Ongoing
URS CORPORATION ORYX GTL, RAS LAFFAN ENVIRONMENTAL TESTING Mar-06
Feb 2009
A.A. ENGINEERING INDUSTRIAL AREA STW SEWAGE WATER TESTING Mar 2006 – Jun 2009
RUMAILLAH SERVICES PUMPING STATIONS-DOHA SEWAGE WATER TESTING Sep 2005 – Sep 2006
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 63
QATAR DREDGING CO NEW DOHA INTERNATIONAL AIRPORT ENVIRONMENTAL TESTING Jan 2005 - 2007
SATCO International RAS LAFFAN ENVIRONMENTAL TESTING ON
SOIL & WATER Aug 06 - Ongoing
BOSKALIS WESTMINSTER RAS LAFFAN ENVIRONMENTAL TESTING ON
SOIL & WATER Feb 2006 Jul 2009
MUSHRIF CONT.CO DOHA WEST STW MATERIALS AND IN-SITU
TESTING Sep 2006- Mar 2009
DESCON ENG.CO OLEFIN PROJECT, RAS LAFFAN MATERIALS AND IN-SITU
TESTING Jul 2006- Jul 2009
ALJABER ENERGY COMMON SULPHUR, QATARGAS II, RAS
LAFFAN
MATERIALS AND IN-SITU
TESTING Jun 2006- Feb 2009
FLUOR MIDDLE EAST RAS GAS, RAS LAFFAN MATERIALS AND IN-SITU
TESTING
Sep2006-
Apr 2009
NASSER AL HAJRI RAS GAS, RAS LAFFAN MATERIALS AND IN-SITU
TESTING Sep 2006- Mar 2009
NASSER AL HAJRI QATARGAS SRU, RAS LAFFAN MATERIALS AND IN-SITU
TESTING Sep 2006- Jan 2011
CDC/TAKENAKA NEW INTERNATIONAL AIRPORT SOIL, & CONCRETE TESTING Sep 2006- Ongoing
MIDMAC NEW INTERNATIONAL AIRPORT SOIL, ASPHALT, CONCRETE
AGGREGATE TESTING Sep 2005 – Aug 2009
SIX CONSTRUCTION CO. NEW INTERNATIONAL AIR PORT CONCRETE TESTING Aug 2005 - Nov 2006
ITT INDUSTRIES DOHA SOUTH SEWAGE WATER ANALYSIS SEWAGE WATER TESTING Jun - Jul 2005
ASHGHAL AL DHAKIRA SEWAGE TREATMENT
WORK SEWAGE WATER TESTING May - Jun 2005
NASSER AL HAJRI DOLPHIN PROJECT, RAS LAFFAN MATERIALS AND IN-SITU
TESTING Oct 2004 – Mar 2009
QATAR PETROLEUM BASE LINE SURVEY OF GROUND WATER
MONITORING WELLS AT MIC
GROUNDWATER SAMPLING
AND LABORATORY TESTING. Jul 2004 – Apr 2008
SIX CONSTRUCT MUSEUM OF ISLAMIC ARTS MATERIALS AND IN-SITU
TESTING Jan 2004 - Feb 2005
SIX CONSTRUCT / MIDMAC KHALIFA STADIUM REDEVELOPMENT –
PACKAGE 3 – WEST STAND
MATERIALS AND IN-SITU
TESTING Oct 2003 to Mar 2005
OVERSEAS BECHTEL INC. NEW DOHA INTERNATIONAL AIRPORT
PROJECT
SOIL AND WATER SAMPLING
AND TESTING FOR VARIOUS
CONTAMINANT SPECIES
Feb - Aug 2004
HYDER CONSULTING
DOHA WEST SEWAGE TREATMENT
WORKS - FLOW SAMPLING AND
LABORATORY TESTING
SEWAGE SAMPLING AND
LABORATORY TESTING Sep - Oct 2003
QAPCO QATOFIN PROJECT, MESAIEED
SOIL AND WATER SAMPLING
AND TESTING FOR VARIOUS
CONTAMINANT SPECIES
Nov-03
AL BAIDA TECHNICAL SERVICES DEEP WELL DRILLING PROJECTS, SW
QATAR
HEAVY METAL ANALYSIS OF
GROUND WATER SAMPLES Jul-03
QP / MIC NODCO REFINERY AREA, MESAIEED ENVIRONMENTAL ANALYSIS –
HEAVY METALS AND TPH Apr-03
MMAA – DRAINAGE DEPARTMENT
GROUND WATER SAMPLING AND
ANALYTICAL LABORATORY TESTING –
PUMP STATIONS ENVIRONMENTAL
IMPACT STUDY
GROUND WATER SAMPLING
AND LABORATORY TESTING FOR
VARIOUS CONTAMINANT
SPECIES
May-03
MMAA – DRAINAGE DEPARTMENT CP-505 INDUSTRIAL AREA SEWERAGE LABORATORY ANALYSIS OF
SEWAGE SAMPLES Feb-03
QATAR PETROLEUM WOQOD BITUMEN STORAGE AND
LOADING FACILITIES – MESAIEED
SOIL AND WATER SAMPLING
AND TESTING FOR VARIOUS
CONTAMINANT SPECIES
Jan-03
NITCO AL KHOR SEWAGE TREATMENT WORKS LABORATORY ANALYSIS OF
SEWAGE SAMPLES May - Sep 2002
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 64
MMAA – DRAINAGE DEPARTMENT ABU HAMOUR SOUTHERN OUT FALL.
MARINE WATER, LAKE SURFACE
WATER & SEDIMENT AND
DISCHARGE WATER SAMPLING
AND ANALYSIS FOR
CONTAMINATION STUDY.
OFFSHORE CURRENT AND TIDAL
MONITORING.
Jun 2002 - Apr 2003
GULF HOUSING & CONST. QATARGAS – DEBOTTLENECKING
PROJECT, RAS LAFFAN
MATERIALS AND IN-SITU
TESTING Jul 2002 – Jul 2005
GRANDI LAVORI FINCOSIT LAND RECLAMATION IN LPG STORAGE
AREA AT RAS LAFFAN
MATERIALS AND IN-SITU
TESTING Mar 2002 – May 2003
GRANDI LAVORI FINCOSIT MULTI-PRODUCTS BERTH, MESAIEED MATERIALS AND IN-SITU
TESTING Oct 2001 – Sep 2004
GRANDI LAVORI FINCOSIT CRUSHED STONE FACILITY AT MESAIEED MATERIALS AND IN-SITU
TESTING Oct 2001 - Aug 2004
GRANDI LAVORI FINCOSIT RAS LAFFAN COMMON COOLING WATER
PROJECT
MATERIALS AND IN-SITU
TESTING Jun 2002 - Nov 2003
CCIC RAS LAFFAN COMMON COOLING WATER
PROJECT
MATERIALS AND IN-SITU
TESTING Jun 2002 - Sep 2004
CCIC RAS LAFFAN EXPANSION PROJECT MATERIALS AND IN-SITU
TESTING Oct 2001 – 2004
J&P IMMIGRATION & SALWA INTERCHANGES MATERIALS AND IN-SITU
TESTING Apr 2003 – Sep 2004
CCIC KHALIFA SPORTS HALL MATERIALS AND IN-SITU
TESTING Sep 2003 – Aug 2005.
READINESS MANAGEMENT U.S. AIRBASE, AL UDEID ASPHALT AND CONCRETE
TESTING WORKS Apr - Jun 2002
INTERBETON QAFCO – IV EXPANSION, MESAIEED ALL TESTING WORKS INCLUDING
ONSITE LABORATORY May 2002 – May 2003
CCIC QAFCO – IV EXPANSION, MESAIEED ALL TESTING WORKS INCLUDING
ONSITE LABORATORY 2002 – 2004
WSP INTERNATIONAL RAS ABU ABOUD - EIA
SAMPLING AND ANALYSIS OF
SOIL AND WATER FOR
CONTAMINATION STUDY
Dec-02
QAPCO GROUND WATER MONITORING WELLS
SAMPLING AND ANALYSIS OF
SOIL AND WATER FOR
CONTAMINATION STUDY
Feb-02
MECON / KHARAFI SULPHUR RECOVERY EXPANSION LAB AND FIELD TESTING OF
SOIL, CONCRETE & AGGREGATE 2001 – 2002
ERM / LAHMYER RAS ABU FONTAS, SAILIYAH, WAJBAH
AND DOHA SOUTH – EIA
SAMPLING AND ANALYSIS OF
SOIL AND WATER FOR
CONTAMINATION STUDY
Sep-01
HYDER CONSULTING
DOHA SOUTH SEWAGE TREATMENT
WORKS – FLOW SAMPLING &
LABORATORY TESTING
SEWAGE SAMPLING &
LABORATORY TESTING Jul-01
TECHNIP ALBA, BAHRAIN ALL TESTING WORKS INCLUDING
ONSITE LABORATORY 1999 – 2001
LG ENGINEERING NODCO REFINERY EXPANSION,
MESAIEED
ALL TESTING WORKS INCLUDING
ONSITE LABORATORY 1999 – 2001
QAFCO QAFCO – IV CONTAMINATED LAND
INVESTIGATION
SAMPLING AND ANALYSIS OF
SOIL AND WATER FOR
CONTAMINATION STUDY
May-00
DAMES & MOORE
NGL-4 BASE CASE, NGL-3 AND NGL TANK
FARM – ENVIRONMENTAL IMPACT
ASSESSMENT
SAMPLING AND ANALYSIS OF
SOIL AND WATER FOR
CONTAMINATION STUDY
Aug-99
MIDMAC CONTRACTING CO QAFCO – III EXPANSION, MESAIEED LAB AND FIELD TESTING OF
SOIL, CONCRETE & AGGREGATE 1996 – 1998
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 65
TOYO ENGINEERING QATAR GAS UPSTREAM PROJECT, RAS
LAFFAN
ALL TESTING WORKS INCLUDING
ONSITE LABORATORY 1995 – 1998
TAYLOR WOODROW QATAR FLOUR MILL, DOHA LAB AND FIELD TESTING OF
SOIL, CONCRETE & AGGREGATE 1995 - 1997
CHIYODA CORPORATION QATAR GAS LNG PROJECT, RAS LAS
LAFFAN CONCRETE TESTING 1994 - 1996
Major Completed Projects and On-going Projects Laboratory (Oman)
Client Project Details Period
Oman Mining LLC Sample preparations for mineral
exploration projects Crushing and pulverising
Completed December
2012.
Value of 11,784 OMR
SNCC Qurait Concrete On going in 2012
SNCC Sur Concrete On going in 2012
Khalid bin Ahmed Duqm Road Soil analysis ~ chemical
On going On going in 2012
Khalid bin Ahmed Mabellah Water analysis On going in 2012
Al Batna Quarries Sohar Aggregate analysis On going in 2012
Sering Muscat Concrete crack monitoring Began December 2012
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 66
APPENDIX D
FIELD AND LABORATORY TESTING
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 1
No. Test Method Sample Holding Time Required Volume Standard Turn Around Time
1 CONCRETE
1.01 Compressive strength & Density of cube BS EN 12390 -3&7 As per project specification As per project specification 1 Day
1.02 Water absorption BS 1881 : Part 122 Not applicable 3 samples from each set 5 days
1.03 Chloride ion penetration ASTM C 1202 As per project specification As per project specification 3 Days
1.04 Compressive strength of concrete cylinders ASTM C 39 As per project specification As per project specification 1 Day
1.05 Flexural strength of concrete beams ASTM C 78 As per project specification As per project specification 1 Day
1.06 Indirect Tensile Strength of concrete cylinders ASTM C 496 As per project specification As per project specification 1 Day
1.07 Compressive strength, density and visual examination of drilled concrete cores BS 1881 : Part : 120 Min. 2 days Length greater than
diameter 4 Days
1.08 Compressive strength of concrete blocks including weight and nominal dimensions BS : 2028, Appendix F Not applicable 12 samples from
each lot 2 Days
1.09 Water absorption and volume of permeable voids ASTM C 642 As per project specification 1 sample from each
set 7 Days
1.10 Initial surface absorption test (ISAT) BS 1881 : Part : 208 As per project specification As per project specification 2 Days
1.11 Concrete Mix Design and laboratory trial mixes. Client shall provide all material BS 1881 : Part:125 Not applicable
As per project specification
35 days including 28 days compression result
1.12 Water permeability test DIN 1048 As per project specification 3 cubes per set 4 Days
1.13 Chloride Migration NT Build 492 As per project specification As per project specification 4 Days
Chemical Analysis
1.14 Sulphate content BS 1881:Part:124 ASAP 2 kg 3 Days
1.15 Chloride content BS 1881:Part:124 ASAP 2 kg 3 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 2
No. Test Method Sample Holding Time Required Volume Standard Turn Around Time
2 FRESH CONCRETE TESTING AT SITE
2.01 Slump test and temperature BS EN 12350-2 Max. 2hours Each truck Immediate
2.02 Air content BS EN 12350-7 Max. 2hours As per project specification Immediate
2.03 Sampling and manufacture of specimen BS EN 12390-2 Max. 2hours As per project specification 1 Day
3 TILES / MARBLES
3.01 Water absorption of Terrazzo tiles BS EN 13748-1 Not applicable As per project specification 3 Days
3.02 Breaking strength of Terrazzo tile BS EN 13748-1 Not applicable As per project specification 3 Days
3.03 Absorption & Bulk Specific gravity of dimension stone ASTM C 97 Not applicable As per project
specification 3 Days
3.04 Modulus rupture of dimension stone ASTM C 99 Not applicable As per project specification 3 Days
3.05 Compressive strength ASTM C 170 Not applicable As per project specification 3 Days
4 BITUMINOUS MIXTURES
4.01 Density and compaction of Core samples BS EN 12697-6 or ASTM D 2726 ASAP As per project
specification 2 days
4.02 Binder content by Centrifuge extraction and Sieve analysis of aggregate obtained
ASTM D 2172 and ASTM C 136 or BS 812 Part: 103.1
ASAP 25 kg 2 days
4.03 Binder content by Ignition & Particle size distribution
BS EN 12697-39 and BS EN 12697-2 ASAP 25 kg 1 day
4.04 Marshal Test on Plant mixed sample (3 specimens) BS EN 12697-34 ASAP 3 specimen 2 Days
4.05 Marshal Design. (Client shall provide all material) BS EN 12697-34 Not applicable 100 kg each material 14 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 3
No. Test Method Sample Holding Time Required Volume Standard Turn Around Time
5 AGGREGATES
5.01 Sieve analysis (dry) BS:812, Part:103.1Test7.3 Not applicable 10 kg 2 days
5.02 Sieve analysis of fine and coarse aggregates ASTM C 136-01 Not applicable 10 kg 2 days
5.03 Materials Finer than 75 microns. ASTM C 117-03 or BS 812 Part 103 Test 7.2 Not applicable 10 kg 2 days
5.04 Clay lumps and friable particles ASTM C 142 Not applicable 10 kg 3 days
5.05 Particle shape – Flakiness Index BS: 812 Section 105.1 Not applicable 5 kg 2 days
5.06 Particle shape – Elongation Index BS: 812 Section 105.2 Not applicable 5 kg 2 days
5.07 Density, Relative Density (Specific Gravity), and absorption of coarse aggregate ASTM C 127-01 Not applicable 5 kg 3 days
5.08 Particle Density and water absorption BS: 812 Part 2, Test 5.4 or 5.5 Not applicable 5 kg 3 days
5.09 Specific Gravity and absorption ASTM C 128-01 Not applicable 5 kg 3 days
5.10 Los Angeles abrasion value ASTM C 131-03 Not applicable 25 kg 3 days
5.11 Soundness of aggregate using sodium sulfate or magnesium sulfate ASTM C 88-99 Not applicable 15 kg 8 days
5.12 Moisture content BS : 812: Part:109 Not applicable 5 kg 2 days
5.13 Bulk density (compacted and un-compacted) BS : 812: Part:2 Not applicable 25 kg 3 days
5.14 Shell content (visual description) BS : 812: Part: 106 Not applicable 5 kg 3 days
5.15 Aggregate impact value BS : 812: Part:112 Not applicable 10 kg 3 days
5.16 Aggregate crushing value BS : 812: Part: 110 Not applicable 10 kg 3 days
5.17 Ten percent fines value BS : 812: Part: 111 Not applicable 10 kg 3 days
5.18 Drying shrinkage BS EN 1367- 4 Not applicable 10 kg 15 days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 4
No. Test Method Sample Holding Time Required Volume Standard Turn Around Time
Chemical Analysis
5.19 Acid soluble Sulphate content BS 812 Part:118 Test 6 Not applicable 2 kg 3 days
5.20 Acid Soluble Chloride content BS 812 Part:117.Appendix C Not applicable 2 kg 3 days
5.21 Organic impurities ASTM C 40 Not applicable 2 kg 3 days
6 SOILS
6.01 Particle size distribution BS :1377, Part 2, Test 9.2 Not applicable 25 kg 3 days
6.02 Liquid Limit. Plastic limit & PI BS :1377, Part 2, Test 4.3 Not applicable 2 kg 3 days
6.03 Liquid limit, Plastic limit, & Plasticity Index ASTM D 4318-00 Not applicable 2 kg 3 days
6.04 Dry Density / Moisture content relationship BS :1377, Part 4, Test 3.5 & Test 3.6 Not applicable 50 kg 3 days
6.05 Dry Density / Moisture content relationship ASTM D 1557-02 Not applicable 50 kg 3 days
6.06 California bearing ratio (CBR) BS :1377, Part 4, Test 7 & CML Test 10-97 Not applicable 25 kg 6 days
6.07 California bearing ratio (CBR) ASTM D 1883 Not applicable 50 kg 6 days
6.08 Moisture content BS : 1377: Part:2 ASAP 5 kg 2 Days
6.09 Wet density undisturbed sample BS : 1377: Part:2 ASAP 5 kg 2 Days
6.10 Dry density undisturbed sample BS : 1377: Part:2 ASAP 5 kg 2 Days
6.11 Specific gravity BS : 1377; Part:2 Not applicable 5 kg 2 Days
6.12 Sedimentation analysis BS : 1377 Part : 2 Test 9.5 Not applicable 5 kg 4 Days
6.13 Linear shrinkage BS : 1377: Part:2 Not applicable 5 kg 4 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 5
No. Test Method Sample Holding Time Required Volume Standard Turn Around Time
6.14 Sand Equivalent Value ASTM D 2419 Not applicable 5 kg 4 Days
6.15 1-Dimensional consolidation test BS:1377 Part-5 Test 3 ASAP 5 Kg 4 Days
6.16 Direct Shear Test BS:1377 Part-7 Test 4 ASAP 5 Kg 4 Days
6.17 Tri axial Test – Un Consolidated un-drained (UU) BS:1377 Part-7 Test 8 ASAP Core sample 4 Days
6.18 Tri axial Test – Consolidated un-drained (CU) BS:1377 Part-8 Test 7 ASAP Core sample 4 Days
6.19 Tri axial Test – Consolidated Drained (CD) BS:1377 Part-8 Test 8 ASAP Core sample 4 Days
6.20 In-situ Density Testing –Nuclear gauge BS 1377 Part: 9 Not applicable As per project specification 1 Day
6.21 In-situ Density Testing –Sand replacement BS 1377 Part: 9 Not applicable As per project
specification 1 Day
6.22 California Bearing Ratio Tests BS 1377 Part: 9 Not applicable As per project specification 1 Day
6.23 Plate Bearing Tests BS 1377 Part: 9 Not applicable As per project specification 1 Day
Chemical Analysis
6.24 pH Value BS 1377:Part:3 Test - 9 ASAP 2 Kg 2 Days
6.25 Water Soluble Sulphate content BS 1377:Part:3 Test –5.3 ASAP 2 Kg 3 Days
6.26 Water Soluble Chloride content BS 1377:Part:3 Test -7.2 ASAP 2 Kg 3 Days
6.27 Acid Soluble Sulphate content BS 1377:Part:3 Test -5.2 ASAP 2 Kg 3 Days
6.28 Acid Soluble Chloride content BS 1377:Part:3 Test -7.3 ASAP 2 Kg 3 Days
6.29 Organic matter content BS 1377:Part:3 Test -3 ASAP 2 Kg 3 Days
6.30 Carbonate content BS 1377:Part:3 Test -6 ASAP 2 Kg 3 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 6
No. Test Method Sample Holding Time Required Volume Standard Turn Around Time
6.31 Electrical Resistivity BS 1377:Part:3 Test - 10 Not applicable 10 Kg 3 Days
6.32 Redox Potential BS 1377:Part:3 Test -11 Not applicable 5 Kg 4 Days
7 ROCKS
7.01 Point load test ASTM D 5731 Not applicable Min: 10 pieces 2 Days
7.02 Uni-axial compression test ASTM D7012 Method C ASAP Core sample 2 Days
7.03 Uniaxial compression test and Modulus of deformation ASTM D 7012 Method D ASAP Core sample 2 Days
7.04 Splitting tensile strength ASTM D 3967 ASAP Core sample 2 Days
7.05 Slake Durability Test ASTM D 4644 ASAP 5 Kg 3 Days
7.06 Grading of Rock armor – shall be conducted at site CIRIA SP-83 Test 3.2.2.2
Not applicable Min: 3 Tone 4 Days
7.07 Drop Test- Breakage Index CIRIA SP-83 Test A2.11.4
Not applicable Min: 3 Tone 4 Days
7.08 Density CIRIA SP-83 Test A2.6 Not applicable 10 kg 4 Days
7.09 Water Absorption CIRIA SP-83 Test A2.7 Not applicable 10 kg 4 Days
7.10 Soundness ASTM C 88-99 Not applicable 10 kg 7 Days
7.11 Los Angeles abrasion value ASTM C 131-03 Not applicable 20 kg 3 Days
8 CEMENT
8.01 Initial and final setting times BS EN 196-3 ASAP 2 kg 2 Days
8.02 Soundness of cement BS EN 196-3 ASAP 2 kg 2 Days
8.03 Fineness of cement BS EN 196-6 ASAP 2 kg 2 Days
8.04 Compressive strength of mortar cubes using standard sand BS EN 196-1
ASAP 3 kg 28 Days
8.05 Chemical Analysis BS EN 196-2 ASAP 2 Kg 4 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 7
No. Test Method Sample Holding Time Required Volume Standard Turn Around
Time
9 Pulverized Fuel Ash (PFA)
9.01 Magnesia content BS EN196-2ASTM C114
ASAP 2 Kg 4 Days
9.02 Sulphate content BS EN196-2ASTM C114
9.03 Loss on ignition BS EN196-2ASTM C114
9.04 Moisture content BS 3892 -1 /ASTM C114
9.05 Fineness BS 3892 -1 /ASTM C114
10 Micro silica
10.01 Silica content (SiO2) ASTM C1240/C114
ASAP
2 Kg
4 Days
10.02 Moisture content ASTM C1240/C114
10.03 Loss on ignition ASTM C1240/C114
10.04 Percent retained on 45-µm ASTM C1240
11 Water for Concrete purpose
ASAP 500 ml 3 Days 11.01 pH BS 6068.2.50 -1995
11.02 Sulphate, Chloride &TDS BS 1377 Part:3:1990
11.03 Alkalinity -Carbonate & Bi carbonate BS EN ISO 9963-1:1996
12 Admixture
12.01 Chloride content BS EN 480-10
ASAP 500 ml 3 Days 12.02 Relative Density BS EN 480-2
12.03 Dry Material Content BS EN 480-8
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 8
No. Test Method Sample Holding Time Required Volume Standard Turn Around
Time
13 Soil For Agricultural Purpose
13.01 Sodium Absorption Ratio (SAR)
Laboratory Manual for the Examination of Water, Wastewater and Soil
Not applicable 3 Kg 7 Days
13.02 Boron
13.03 Cat ion Exchange capacity
13.04 Exchangeable Sodium
13.05 Salinity
13.06 Chloride
13.07 Sulphate
13.08 Phosphate
13.09 Total Kjeldahl Nitrogen (TKN)
13.10 Total Nitrogen
13.11 Carbonates
13.12 Particle size distribution BS 1377 Part:2 Not applicable 3 Kg 2 Days
14 Steel Reinforcement
14.01 Tensile strength & Elongation BS 4449/BS EN 10002-1 Not applicable 1M 3 Days
14.02 Bend BS 4449 Not applicable 1M 3 Days
14.03 Rebend BS 4449 Not applicable 1M 3 Days
14.04 Chemical Analysis – C, S, Mn, Si &P BS 4449 Not applicable 100 g 4 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 9
CHEMICAL & ENVIRONMENTAL TESTING
No. Test Method Sample Holding Time Required Volume Standard Turn Around
Time
15 Marine water/ Ground water
15.01 pH value APHA/AWWA 4500-H+B ASAP 500 ml 2 Days
15.02 Electrical Conductivity APHA/AWWA 2510 B ASAP 500 ml 2 Days
15.03 Ammonia Nitrogen (NH4N) APHA/AWWA 4500 NH3 F ASAP 500 ml 2 Days
15.04 Nitrate Nitrogen APHA/AWWA4500 NO3 E ASAP 500 ml 2 Days
15.05 Nitrite Nitrogen APHA/AWWA4500 NO2 B ASAP 500 ml 2 Days
15.06 Total Kjeldahl Nitrogen (TKN) APHA/AWWA 4500- N org B &
4500 NH3C ASAP 500 ml 2 Days
15.07 Total Nitrogen APHA/AWWA 4500 N C ASAP 500 ml 2 Days
15.08 Phosphate APHA/AWWA 4500-PC ASAP 500 ml 2 Days
15.09 Sulphide APHA/AWWA 4500 S2-F ASAP 500 ml 2 Days
15.10 Total Suspended Solids APHA/AWWA 2540 D ASAP 500 ml 2 Days
15.11 Total Dissolved Solids (TDS) APHA/AWWA 2540 C ASAP 500 ml 2 Days
15.12 Turbidity APHA/AWWA 2130 B ASAP 500 ml 2 Days
15.13 Dissolved oxygen APHA/AWWA 4500 O C ASAP 500 ml 2 Days
15.14 Chemical Oxygen Demand (COD) APHA/AWWA 5220 B 7 Days 500 ml 2 Days
15.15 Biochemical Oxygen Demand (BOD) APHA/AWWA -5210 B 24 Hours 500 ml 6 Days
15.16 Chlorine content APHA/AWWA 4500 Cl ASAP 500 ml 2 Days
15.17 Chloride (Cl) APHA/AWWA 4500-Cl-B ASAP 500 ml 2 Days
15.18 Salinity APHA/AWWA 4500-Cl-B ASAP 500 ml 2 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 10
No. Test Method Sample Holding Time
Required Volume Standard Turn Around Time
15.19 Cyanides APHA/AWWA 4500 CN- F ASAP 500 ml 2 Days
15.20 Fat, Oil & Grease APHA/AWWA 5520 B ASAP 500 ml 2 Days
15.21 Chlorophyll a APHA/AWWA 10200 H ASAP 500 ml 2 Days
15.22 Fecal Coliforms APHA/AWWA 9222 D 6 Hours 500 ml 2 Days
15.23 Total Coliforms & E. Coli APHA/AWWA 9222 B 6 Hours 500 ml 2 Days
15.24 BTEX USEPA 5021/8260C 14 Days 500 ml 4 Days
15.25 Chlorinated Hydrocarbons USEPA 3510/8021 14 Days 500 ml 4 Days
15.26 Chloro phenols USEPA 3510/8041A 14 Days 500 ml 4 Days
15.27 PCBs USEPA 3510/8082A 14 Days 500 ml 4 Days
15.28 Pesticides USEPA 3510/8081B 14 Days 500 ml 4 Days
15.29 Phenols USEPA 9065 14 Days 500 ml 4 Days
15.30 Polyaromatic hydrocarbon (PAH) USEPA 3510C/8270D/8100 14 Days 500 ml 4 Days
15.31 Semi volatile organic compounds (SVOC) USEPA 3510/8270D 14 Days 500 ml 4 Days
15.32 Total Organic Carbon (TOC) USEPA 9060 A 14 Days 500 ml 4 Days
15.33 Total petroleum hydrocarbons (TPH) USEPA 5030B/8015C/3510C/8270D 14 Days 500 ml 4 Days
15.34 Tri halo methane USEPA 8260C 14 Days 500 ml 4 Days
15.35 Volatile organic compounds (VOC) USEPA5021/ 14 Days 500 ml 4 Days
Marine water/ Ground water - Heavy Metals
15.36 Aluminum (Al) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.37 Antimony (Sb) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.38 Arsenic (As) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.39 Barium (Ba) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.40 Beryllium (Be) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 11
No. Test Method Sample Holding Time Required Volume Standard Turn Around
Time 15.41 Boron (B) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.42 Cadmium (Cd) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.43 Calcium (Ca) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.44 Chromium (Cr) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.45 Cobalt (Co) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.46 Copper (Cu) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.47 Iron (Fe) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.48 Lead (Pb) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.49 Lithium (Li) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.50 Magnesium (Mg) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.51 Manganese (Mn) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.52 Mercury (Hg) USEPA 3005B/Hydride/6010C 6 months -preserved 200 ml 5 Days
15.53 Molybdenum (Mo) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.54 Nickel (Ni) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.55 Phosphorous (P) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.56 Potassium (K) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.57 Selenium (Se) USEPA 3005B/Hydride/6010C 6 months -preserved 200 ml 5 Days
15.58 Silicon (Si) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.59 Silver (Ag) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.60 Sodium (Na) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.61 Sulphur (S) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.62 Thallium (Tl) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.63 Titanium (Ti) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.64 Vanadium (V) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
15.65 Zinc (Zn) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 12
No. Test Method Sample Holding Time Required Volume Standard Turn Around
Time
16 Potable water
16.01 Total Hardness (CaCO3) APHA/AWWA 3500-Ca D / 3500 Mg B ASAP 500 ml 2 Days
16.02 Total Alkalinity (CaCO3) APHA/AWWA 2320 B ASAP 500 ml 2 Days
16.03 Total Dissolved Solids (TDS) APHA/AWWA 2540 C ASAP 500 ml 2 Days
16.04 Calcium (Ca) APHA /AWWA3500-Ca D ASAP 500 ml 2 Days
16.05 Magnesium (Mg) APHA/AWWA 3500 Mg B ASAP 500 ml 2 Days
16.06 Carbonate (CO3) APHA/AWWA 2320 B ASAP 500 ml 2 Days
16.07 Bicarbonate (HCO3) APHA/AWWA 2320 B ASAP 500 ml 2 Days
16.08 Sulphate (SO4) APHA/AWWA 4500-SO42-E ASAP 500 ml 2 Days
16.09 Chloride (Cl) APHA/AWWA 4500-Cl-B ASAP 500 ml 2 Days
16.10 Nitrate (NO3) APHA/AWWA 4500-NO3 D ASAP 500 ml 2 Days
16.11 Iron (Fe) APHA/AWWA 3500 Fe B ASAP 500 ml 2 Days
16.12 Turbidity APHA/AWWA 2130 B ASAP 500 ml 2 Days
16.13 pH Value @ 25°C APHA/AWWA 4500-H+B ASAP 500 ml 2 Days
16.14 Electrical Conductivity APHA/AWWA 2510 B ASAP 500 ml 2 Days
16.15 Bacteria - Total Coliforms APHA/AWWA 9222 B ASAP 500 ml 2 Days
16.16 Bacteria - Faecal Coliforms APHA/AWWA 9222 D ASAP 500 ml 2 Days
16.17 Tri halo methane USEPA 5021/826C ASAP 500 ml 2 Days
17 Waste water/Sewage water/Treated Effluent
17.01 pH value APHA/AWWA 4500-H+B ASAP 500 ml 2 Days
17.02 Ammonia Nitrogen APHA/AWWA: 4500 NH3C ASAP 500 ml 3 Days
17.03 Nitrate Nitrogen APHA/AWWA 4500 NO3E ASAP 500 ml 3 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 13
No. Test Method Sample Holding Time
Required Volume Standard Turn Around Time
17.04 Nitrite Nitrogen APHA/AWWA 4500 NO2B ASAP 500 ml 3 Days
17.05 Total Nitrogen APHA/AWWA 4500 NO3 , NO2,
4500 N org ASAP 500 ml 3 Days
17.06 Total Kjeldahl Nitrogen (TKN) APHA/AWWA 4500- N org ASAP 500 ml 3 Days
17.07 Chemical Oxygen Demand (COD) APHA/AWWA 5220 D 7 Days 500 ml 2 Days
17.08 Biochemical Oxygen Demand (BOD) APHA/AWWA 5210 B 24 Hours 500 ml 6 Days
17.09 Dissolved oxygen APHA/AWWA 4500 O C ASAP 500 ml 2 Days
17.10 Phosphate APHA/AWWA 4500-PC ASAP 500 ml 2 Days
17.11 Sulphide APHA/AWWA 4500 S2-F ASAP 500 ml 2 Days
17.12 Total Suspended Solids APHA/AWWA 2540 D ASAP 500 ml 2 Days
17.13 Total Dissolved Solids (TDS) APHA/AWWA 2540 C ASAP 500 ml 2 Days
17.14 Turbidity APHA/AWWA 2130 B ASAP 500 ml 2 Days
17.15 Sludge Volume Index APHA/AWWA 2710 D ASAP 500 ml 2 Days
17.16 MLSS APHA/AWWA 2540 D ASAP 500 ml 2 Days
17.17 MLVSS APHA/AWWA 2540 E ASAP 500 ml 2 Days
17.18 Chlorine content APHA/AWWA 4500 Cl ASAP 500 ml 2 Days
17.19 Cyanides APHA/AWWA 4500 CN- F ASAP 500 ml 2 Days
17.20 Fat, Oil & Grease APHA/AWWA 5520 B ASAP 500 ml 2 Days
17.21 Fecal Coliforms APHA/AWWA 9222 D ASAP 500 ml 2 Days
17.22 Total Coliforms APHA/AWWA 9222 B ASAP 500 ml 2 Days
17.23 Nematode Eggs APHA/AWWA 10750 C ASAP 500 ml 2 Days
17.24 Hexavalent Chromium (Cr+6) APHA/AWWA 3500 Cr B 14 Days 500 ml 2 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 14
No. Test Method Sample Holding Time
Required Volume Standard Turn Around Time
17.25 BTEX USEPA 5021/8260C 14 Days 500 ml 2 Days
17.26 Chlorinated Hydrocarbons USEPA 3510/8021 14 Days 500 ml 3 Days
17.27 PCBs USEPA 3510/8082A 14 Days 500 ml 3 Days
17.28 Pesticides USEPA 3510/8081B 14 Days 500 ml 3 Days
17.29 Phenols USEPA 9065-1986 14 Days 500 ml 3 Days
17.30 Polyaromatic hydrocarbon (PAH) USEPA 3510/8270D-2007/8100 14 Days 500 ml 3 Days
17.31 Semi volatile organic compounds (SVOC) USEPA 3510/8270D 14 Days 500 ml 3 Days
17.32 Total Organic Carbon (TOC) USEPA 9060 A 14 Days 500 ml 3 Days
17.33 Total petroleum hydrocarbons (TPH) USEPA 5030B/8015C/3510C/8270D
14 Days 500 ml 3 Days
17.34 Volatile organic compounds (VOC) USEPA5021/8260C 14 Days 500 ml 3 Days
Waste water/Sewage water/Treated Effluent - Heavy M etals
17.35 Aluminum (Al) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.36 Antimony (Sb) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.37 Arsenic (As) USEPA 3010/Hydride/6010C- 6 months -preserved 200 ml 4 Days
17.38 Barium (Ba) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.39 Beryllium (Be) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.40 Boron (B) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.41 Cadmium (Cd) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.42 Calcium (Ca) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.43 Chromium (Cr) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.44 Cobalt (Co) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.45 Copper (Cu) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 15
No. Test Method Sample Holding Time
Required Volume Standard Turn Around Time
17.46 Iron (Fe) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.47 Lead (Pb) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.48 Lithium (Li) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.49 Magnesium (Mg) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.50 Manganese (Mn) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.51 Mercury (Hg) USEPA 3010/Hydride/6010C- 6 months -preserved 200 ml 4 Days
17.52 Molybdenum (Mo) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.53 Nickel (Ni) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.54 Phosphorous (P) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.55 Potassium (K) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.56 Selenium (Se) USEPA 3010/Hydride/6010C- 6 months -preserved 200 ml 4 Days
17.57 Silicon (Si) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.58 Silver (Ag) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.59 Sodium (Na) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.60 Sulphur (S) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.61 Thallium (Tl) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.62 Titanium (Ti) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.63 Vanadium (V) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
17.64 Zinc (Zn) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days
18 Marine sediment/Soil/Sludge/Solid Waste
18.01 Total petroleum hydrocarbons (TPH)
GRH-USEPA 8015/HS Trap
14 Days 250 gm 4 Days DRH-USEPA 8015/3540/8270
Heavy Fraction- USEPA 9071B
18.02 BTEX USEPA 5021/8260C 14 Days 250 gm 4 Days
18.03 Chlorinated Hydrocarbons USEPA 3540/8021 14 Days 250 gm 4 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 16
No. Test Method Sample Holding Time
Required Volume Standard Turn Around Time
18.04 Flammability test USEPA 1050 14 Days 250 gm 4 Days
18.05 Oil & Grease USEPA 9071 B 14 Days 250 gm 4 Days
18.06 PCBs USEPA 3540/8082A 14 Days 250 gm 4 Days
18.07 Pesticides USEPA 3540/8081B 14 Days 250 gm 4 Days
18.08 Polyaromatic hydrocarbon (PAH) USEPA 3540/8270D-2007/8100 14 Days 250 gm 4 Days
18.09 Pyrophoric test USEPA 1050 14 Days 250 gm 4 Days
18.10 Semi volatile organic (SVOC) USEPA 3540/8270D 14 Days 250 gm 4 Days
18.11 Sulphide USEPA 9030 B /9034 14 Days 250 gm 4 Days
18.12 TCLP USEPA 1311/6010C 14 Days 250 gm 4 Days
18.13 Volatile organic compounds (VOC) USEPA5021/8260C 14 Days 250 gm 4 Days
Marine sediment/Soil/Sludge/Solid Waste - Heavy Met als
18.14 Aluminum (Al) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.15 Antimony (Sb) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.16 Arsenic (As) USEPA 3050B/Hydride/6010C 6 months -preserved 250 gm 4 Days
18.17 Barium (Ba) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.18 Beryllium (Be) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.19 Boron (B) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.20 Cadmium (Cd) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.21 Calcium (Ca) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.22 Chromium (Cr) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.23 Cobalt (Co) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.24 Copper (Cu) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.25 Iron (Fe) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
Prequalification Document 2013
Prequalification-2013 r10 (07.03.13) 17
No. Test Method Sample Holding Time Required Volume Standard Turn Around
Time
18.26 Lead (Pb) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.27 Magnesium (Mg) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.28 Manganese (Mn) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.29 Mercury (Hg) USEPA 3050B/Hydride/6010C 6 months -preserved 250 gm 4 Days
18.30 Molybdenum (Mo) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.31 Nickel (Ni) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.32 Phosphorous (P) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.33 Potassium (K) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.34 Selenium (Se) USEPA 3050B/Hydride/6010C 6 months -preserved 250 gm 4 Days
18.35 Silicon (Si) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.36 Silver (Ag) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.37 Sodium (Na) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.38 Sulphur (S) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.39 Thallium (Tl) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.40 Titanium (Ti) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.41 Vanadium (V) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.42 Zinc (Zn) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.43 Potassium (K) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.44 Selenium (Se) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days 18.45 Silicon (Si) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.46 Silver (Ag) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days 18.47 Sodium (Na) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days 18.48 Thallium (Tl) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.49 Titanium (Ti) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days 18.50 Vanadium (V) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days
18.51 Zinc (Zn) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days