IntroductionIntroduction
FABTECH STERLING BUILDING TECHNOLOGIES PVT LTD is a jointventure between Fabtech Technologies International Ltd, India& Sterling Construction and Development Corporation,Philippines.
FABTECH Group Established in 1999, are 12years old, 400 member turnkeysolution providers with in-house design, engineering, construction and manufacturingof critical and vital elements like modular in-house partitions, HVAC, Clean roomequipment and solutions, isolation systems, and External Construction.
We are growing at a CAGR of 23%, with 72% repeat clients in India and Internationally.www.fabtecheng.com and www.fabforms.ae and is our URL.
FABTECH STERLING BUILDING TECHNOLOGIES PVT LTD is a jointventure between Fabtech Technologies International Ltd, India& Sterling Construction and Development Corporation,Philippines.
FABTECH Group Established in 1999, are 12years old, 400 member turnkeysolution providers with in-house design, engineering, construction and manufacturingof critical and vital elements like modular in-house partitions, HVAC, Clean roomequipment and solutions, isolation systems, and External Construction.
We are growing at a CAGR of 23%, with 72% repeat clients in India and Internationally.www.fabtecheng.com and www.fabforms.ae and is our URL.
THE VISIONTo become a specialist international construction company employing trendsetting and path breaking innovations.
THE MISSIONTo create a corporation which comes to mind for challenging projects, whichmakes profits, adding value to itself, our people, society and country.
THE VISIONTo become a specialist international construction company employing trendsetting and path breaking innovations.
THE MISSIONTo create a corporation which comes to mind for challenging projects, whichmakes profits, adding value to itself, our people, society and country.
The Company offers a full range of world-class fabricated and pre-engineeredconcrete form systems for commercial, residential and industrial applications.
Plaswall™ & Plasmolite™ are the products launched and have found strongacceptability in India , Middle East, Philippines, Africa, Australia, USA and UK.
The Company offers a full range of world-class fabricated and pre-engineeredconcrete form systems for commercial, residential and industrial applications.
Plaswall™ & Plasmolite™ are the products launched and have found strongacceptability in India , Middle East, Philippines, Africa, Australia, USA and UK.
Product Introduction
1 Plaswall :-It is a Lost in place formwork system, where in two fiber cementboards (FCB) of 6mm thickness are used. It uses HIMI (High ImpactMolded Inserts) bonded between two sheets of FCB in situ anderected to produce a straight-to-finish wall. A monolithic structureis then created by filling the entire structure with concrete.Additional load capacity can be obtained by providing extrareinforcing bars and/or increasing the grade of the concrete.
From structural concrete walls to thermally insulated wallsespecially designed for hot and cold climates, this patentedtechnology can meet every need.
Product Introduction
1 Plaswall :-It is a Lost in place formwork system, where in two fiber cementboards (FCB) of 6mm thickness are used. It uses HIMI (High ImpactMolded Inserts) bonded between two sheets of FCB in situ anderected to produce a straight-to-finish wall. A monolithic structureis then created by filling the entire structure with concrete.Additional load capacity can be obtained by providing extrareinforcing bars and/or increasing the grade of the concrete.
From structural concrete walls to thermally insulated wallsespecially designed for hot and cold climates, this patentedtechnology can meet every need.
Advantages : -
• Upto three times faster than conventional technology.• Faster returns on capital invested• Tried & tested in several countries.• Earthquake resistant.• No worry about brick work quality.• No worry about shortage of quality masons.• No plastering.(No messy mixing at site, workmanship issues)• No curing required.• No cracks hence long life.• Very low maintenance.• Bill of quantities defined before work.• Better predictability of costs & hence better control.• Inlaid plumbing & electrical lines, superior quality finish.
Advantages : -
• Upto three times faster than conventional technology.• Faster returns on capital invested• Tried & tested in several countries.• Earthquake resistant.• No worry about brick work quality.• No worry about shortage of quality masons.• No plastering.(No messy mixing at site, workmanship issues)• No curing required.• No cracks hence long life.• Very low maintenance.• Bill of quantities defined before work.• Better predictability of costs & hence better control.• Inlaid plumbing & electrical lines, superior quality finish.
ROOFING SLAB AND STAIR SYSTEMS :-• Strength: Panels are composed of a three-dimensional structure of high strength steel(750 MPa) and thermal insulation, which is then installed with M20 concrete. Theresulting roof and floor slabs have a bearing capacity of up to 600 kg/m -- double thestrength of typical RCC slabs using only 40% of the concrete.
• Speed: Panels are lightweight and can be carried and installed by two semi- skilledlaborers. With no shuttering or form work required, Panels radically increaseconstruction speed and reduces man-hours. Water supply and electrical conduits areconcealed within wall and slab panels and built as part of the basic structure.
ROOFING SLAB AND STAIR SYSTEMS :-• Strength: Panels are composed of a three-dimensional structure of high strength steel(750 MPa) and thermal insulation, which is then installed with M20 concrete. Theresulting roof and floor slabs have a bearing capacity of up to 600 kg/m -- double thestrength of typical RCC slabs using only 40% of the concrete.
• Speed: Panels are lightweight and can be carried and installed by two semi- skilledlaborers. With no shuttering or form work required, Panels radically increaseconstruction speed and reduces man-hours. Water supply and electrical conduits areconcealed within wall and slab panels and built as part of the basic structure.
• Affordability: Up to 50% reductions in labor costs and 35% savings in concrete and steelmake slabs upto 20% cheaper than traditional systems. By keeping building weight to aminimum, Panels also allows foundations to be built more economically.
• Comfort: Insulation within the Panels provides internal temperature reductions of upto8°C compared to typical construction, reducing energy use in cooling and helps increasingcomfort.
Our construction system substantiallyreduces your concrete, steel, and labor costs
Our construction system substantiallyreduces your concrete, steel, and labor costs
Roof Slabs:Concrete – 35%Reinforcement Steel – 100% (None Required)Labor – 30%
Staircases:Concrete – 57%Reinforcement Steel – 100% (None Required)Labor – 30%
Indian Projects Photographs
Tata Housing Development Company Ltd. – Mumbai, India
Amal Group Sales Gallery – Mumbai, India
Concorde Group – Bangalore , India
Naiknaware– Goa, India
Warai woods, Mumbai India
Apartments TMC- Mumbai, India
International Projects Photographs
60 Apartments & 15 villas Australia Project
80 Apartments Australia Project
178 villas & 2 Club house Qatar Project
Site office & 60 Porta Cabins Oman Project
35 Villas Vietnam Project
40 Villas Philippines Project
40 Villas Philippines Project
Philippines Project - High end Homes
Philippines Project – 600 HomesPhilippines Project – 600 Homes
Philippines Project – 900 Homes
Philippines Project - 1100 Homes
Philippines Project – 1100 Homes
200 Homes Philippines Project
Awarded 108000 housing units
Philippines National Police Housing Cont
Philippines National Police HousingCont
Philippines National Police Housing
Philippines Project - Cebu Resort
2 Plasmolite :-
“The ultimate solution to brick/block work &plastering!! ”
Fabtech Plasmolite holds much promise for theconstruction industry. Plasmolite has many benefitsas compared with conventional concrete. Plasmolitesaves you from the hassles of brickwork, hollow-block and plastering. It can be very well integratedwith conventional columns and beams. Usage of thisproduct leads to substantial weight reduction (dead-load), improved fire rating and maximum soundabsorption. It also offers huge saving in raw material(no gravel) and in steel reinforcement in high rise.One has to see to believe the uniformly finished andthermally insulated walls with more strength anddurability. These walls act as non-load bearing andwill find wide acceptance for various buildingsprojects.
2 Plasmolite :-
“The ultimate solution to brick/block work &plastering!! ”
Fabtech Plasmolite holds much promise for theconstruction industry. Plasmolite has many benefitsas compared with conventional concrete. Plasmolitesaves you from the hassles of brickwork, hollow-block and plastering. It can be very well integratedwith conventional columns and beams. Usage of thisproduct leads to substantial weight reduction (dead-load), improved fire rating and maximum soundabsorption. It also offers huge saving in raw material(no gravel) and in steel reinforcement in high rise.One has to see to believe the uniformly finished andthermally insulated walls with more strength anddurability. These walls act as non-load bearing andwill find wide acceptance for various buildingsprojects.
The Plasmolite technology can be used in external and internal applications, as non-load bearing (Partition walls) wall system.
Advantages : -
• Its erection takes just one-third time when compared to conventional systems.• Plasmolite saves you from the hassles of brickwork, hollow-block and plastering.• Substantial savings in raw material (no gravel required).• Increase by 6% more carpet area .• It reduces dead load of high-rise to a certain extend.• Savings in Steel reinforcement.• Plasmolite wall panels are extremely fire resistant and well suited to applications
where fire is a risk. Tests show that Plasmolite foam concrete with 112 mm widthcan protect from fire for up to 4 hours.
• Unskilled labor can do the work easily with minimal requirement of skilled labor.• Excellent thermal & acoustic properties.• Savings in Transportation & Craning.• Eco Friendly.
The Plasmolite technology can be used in external and internal applications, as non-load bearing (Partition walls) wall system.
Advantages : -
• Its erection takes just one-third time when compared to conventional systems.• Plasmolite saves you from the hassles of brickwork, hollow-block and plastering.• Substantial savings in raw material (no gravel required).• Increase by 6% more carpet area .• It reduces dead load of high-rise to a certain extend.• Savings in Steel reinforcement.• Plasmolite wall panels are extremely fire resistant and well suited to applications
where fire is a risk. Tests show that Plasmolite foam concrete with 112 mm widthcan protect from fire for up to 4 hours.
• Unskilled labor can do the work easily with minimal requirement of skilled labor.• Excellent thermal & acoustic properties.• Savings in Transportation & Craning.• Eco Friendly.
ADVANTAGES & COMPARISON WITH CONVENTIONAL WALL SYSTEMS:
Jointing Details
Indian Projects Photographs
Celon– Hyderabad, India 15000 Sqm
Amal Ambrosia –Mumbai, India
Atra– Aurangabad , India 8000 SqmPharmaceutical Factory
TCS (Tata Realty) – Pune, India 5800 sqm Cont
TCS (Tata Realty) – Pune, India 5800 Sqm
Goa Project , India 2500 Sqm
Nissan Service Centre , India 18000 Sq.ft
Indo Baijin Factory - India 8000 Sqm
Amanora Park Town ( City Corporation Limited – City Group ) – Pune, India 18005 Sqm
Philippines Project - Pharmaceutical Factory
U.A.E. Project – Prayer Room
Philippines Project - Pharmaceutical Factory
Certificates
Industrial Design, Philippines Innovation Patent, Australia Utility Model, Philippines
Design Registration, India Published Indian Patent Plaswall Trademark, India
Certificates
Plasmolite Certificate ofPhysical Properties pg2
Plasmolite Certificate ofPhysical Properties pg1
IIT Approval of PlaswallStructural Analysis
Certificates
Boundary WallCertificate
BoundaryWall Designs
National Test HouseCertificate pg1
National Test HouseCertificate pg2
Certificates
AITECH CertificationFire Testing Certificate
James HardieCertificate
Certificates
Dubai Municipal Approval
Western Abu Dhabi Municipal Approval
Certificates
Abu Dhabi Municipal Approval
Corporate Office :717, Janki Centre, Off. Veera Desai Road, Andheri (W), Mumbai - 400053 India.+ 91 - 22 - 61592800 ( 200 Lines ) , Fax : + 91 - 22 - 615928955 / + 91 - 22 – 61592855
UAE Office :Plot No: P598 – 1000, DIP Phase-2,DIP W/H No : 65 & 66, Near Ramla Hyper Market,P.O Box:118672, Dubai, U A ETelephone: +971 4 8840089 ,Fax: +971 4 8840788Email : [email protected]
Branch Office :402/403, Vishakha Arcade,Behind Mogaveera Bhavan School, Opp. Courtyard Hotel,Off Veera Desai Road, Andheri (w) Mumbai: 400 053 IndiaTel: +91 22 64553344. Fax: +91 22 61592855. Web : www.fabforms.aeEmail : [email protected]
Corporate Office :717, Janki Centre, Off. Veera Desai Road, Andheri (W), Mumbai - 400053 India.+ 91 - 22 - 61592800 ( 200 Lines ) , Fax : + 91 - 22 - 615928955 / + 91 - 22 – 61592855
UAE Office :Plot No: P598 – 1000, DIP Phase-2,DIP W/H No : 65 & 66, Near Ramla Hyper Market,P.O Box:118672, Dubai, U A ETelephone: +971 4 8840089 ,Fax: +971 4 8840788Email : [email protected]
Branch Office :402/403, Vishakha Arcade,Behind Mogaveera Bhavan School, Opp. Courtyard Hotel,Off Veera Desai Road, Andheri (w) Mumbai: 400 053 IndiaTel: +91 22 64553344. Fax: +91 22 61592855. Web : www.fabforms.aeEmail : [email protected]