BOOK 4: WELDING
t 2 N B R I D G E
Related Standards
Requirements
ection
STANDARDS
Subject
Inspection
CanadaCanadian Standards Association CSA):• CSA Z662 - Oil and Gas Pipeline Systems
Canadian General Standards Board CGSB):
02·02·06Subject Number
• CAN /CGSB 48.9712 - Nondestructive Testing; Qualificationand Certification o Personnel
United StatesAmerican Petroleum Institute API):• ANSI/API Std 1104 - Welding o Pipelines and Related
Facilities, Section 9
American Society for Non-destructive Testing ASNT)• ASNT SNT-TC-IA - Nondestructive Testing
All welds must be nondestructively inspected in accordance withCSA Z662 CAN), or API Std 1104, Section 9 USA) .
Workers must be aware o company policies concerning weldinspection to ensure standards are met.
Use contractors for:• magnetic particle inspection MPI)
. • ultrasonic inspection except to determine wall thickness)-• . radiographic inspection
1+1 CAN :. Contractors who are retained to perfonm nondestructiveexamination NDE) must be hired directly by the company andmust not be subcontracted through a second or third party.
Contractors must submit a written procedure describing thenondestructive testing method that includes as a minimum:• equipment used• calibration o the equipment
• how to use the equipment
Qualification1 1 CAN - Contractor personnel establishing inspection procedures or
techniques , scanning weldments, or interpreting results must bequalified to Level II or Level III in accordance with CAN /CGSB48.9712-2000 .
uty 1,2009 Page 1 of 3
8/9/2019 Enbridge Pipeline Repair Workplan Welding
2/23
02 02 06Inspection
US
Page2of3
BOOK4
Contractor personnel establishing inspection procedures ortechniques, scanning weldments or interpreting results must bequalified to Level II or Level III in accordance with ASNT RPSNT-TC-IA.
Visual InspectionObserve the welding process to ensure the weld is completedaccording to the qualified procedure .
Fillet WeldsFor all welding on in-service pipe, inspect the weld for defect sus ing MPI (a) immediat e ly after completing the weld, and (b) atleast 2 hrs after completing the weld. fMP identifies crackindications, complete ultrasonic inspection on all suspected areas.
Any undercut must be blended out and the area re-examined.Cracks, regardless of length, are defects that must be repaired (seeBook 3: Pipeline Facilities, ab 06 Pipe Repair nd Modification .
NOTE Exceptions to the 12-hr wait for branch connectionsreinforced with a saddle or split tee (see below) and in specialcircumstances must be approved by regional management.
When adding a branch connection that will be reinforced with asaddle or split tee , the weld between the branch and the mainlinecan be inspected immediately after welding. The 12-hr waitingperiod must be observed ~ f o r enondestructive examination of the
fillet welds between the branch and the reinforcement and betweenthe run pipe and the reinforcement
Magnetic Particle InspectionUse magnetic particle inspection to check:• . fillet welds• nozzle welds• sleeve long-seam welds• longitudinal welds on pipe (manufacturers weld s)
NOTE For more information , see 02-03-03 Magnetic Particle
insp ec lion of Fillel Welds.
July 1 2009
8/9/2019 Enbridge Pipeline Repair Workplan Welding
3/23
\ J
BOOK 4
Records '
Ultrasonic InspectionUse ultrasonic inspection to:• evaluate pipe wall thickness• evaluate internal corrosion• examine fillet welds• examine nozzle welds
02 02 06
Inspection
• examine lon gi tudinal welds on pipe (manuf act urers' welds)
NOTE: For more information , see 02-03-04 Ultrasonic Inspectiono Fillet Welds.
Radiographic Inspection (X-Ray)Use radiographic inspection (or x-ray) to examine:• butt welds
NOTE: For more information, see CSA 2662 (CAN) andANSI API Std 1104 (USA) .
NOTE: n Canada, ultrasonic inspection may be use d as analternative to radiographic inspection at the company's discretion.
DefectsWeld s that exceed the defect acceptance criteria of CSA 2662(CAN) or ANSI API Std 1104 (USA) must be repaired or removed(see 02-02-04 Defect Repair .
Nondestructive Testing ReportRecord the results of ultrasonic and magn etic particle inspectionsof fillet welds us ing the Nondestructive Testing Report.
Retain all Nondestructive Testing Reports permanently in the PLMActivity Reporting database.
X Ray Inspection of Girth Welds FormRecord the results of radiographic inspection of butt welds usingthe X-Ray Inspection of Girth Welds form.
USA Retain all X-Ray Inspection of Girth Welds forms permanently inthe PLM Activity Reporting database.
July 1 2009 P age 3 of 3
8/9/2019 Enbridge Pipeline Repair Workplan Welding
4/23
elding
1. Scope of Work
The scope of this section is to ensure the required Welding Procedure Qualification and Welding
Procedure Specification WPS) are met and the neces sa ry Welder Performance Qualifications are
adequate and current. All regulatory requirements are noted below in Section 2. Enbridge O&MP Book
4 - Welding is the primary standard and includes incorporation of other regulatory requirements.
The pipe replacement section will be welded into the existing pipeline using pre-approved Company
WPS . Welders currently qualified to the WPS will perform the welding required. Two WPS ' s will be used
as part of the welding repair process . Enbridge procedure to be determined will be used as the WPS for
welding 2 branch connections on the existing line to allow thorough drain-up of any remaining produc t
in the line and venting during the welding process. Enbridge procedure UB-7S will be used as the WPSfor butt weld tie-ins of replacement pipe to the existing pipeline. Both procedures are manual , shielded
metal arc weld (SMAW) welding procedures. The SMAW process uses consumable electrodes coated in
flu x to lay the weld. The WPS's are included as attachments to this section of the work plan.
At the completion of the respective replacement pipe segment installation welding processes, the
integrity of all welds will be verified by a non-destructive testing NOT). The 2 drain connections will be
tested by Magnetic Particle Inspection (MPI) . The requirements for the MPI process are addressed in
Enbridge O&MP Book 4, Section 02-02-06 Inspection and Section 02-03 -03 Performing Magnetic Particle
Inspection of Fillet Welds . The butt welds will be inspected by radiography . The radiographic process is
addressed in Enbridge O&MP Book 4, Section 02-02-06 Inspection. All NOT will be performed by
independent, third party Contractors who have the required, qualified NOT procedures and technical
personnel to perform the respective NOT process .
2. Regulatory Requirements
API 1104 Welding of Pipelines and Related Facilities, 19 t h Edition
ASME Section IX of the Boi ler and Pressure Vessel Code
CFR Title 49, Part 195:
195.202 Compliance with specifications or standards.
Each pipeline system must be constructed in accordance with comprehensive written specifications or standards thatare consistent with the requirements of this part .
195.206 Material inspection.
8/9/2019 Enbridge Pipeline Repair Workplan Welding
5/23
No pipe or other component may be installed in a pipeline system unless it has been visually inspected at the site ofinstallation to ensure that it is not damaged in a manner that could impair its strength or reduce its serviceability .
195 214 Welding procedures
(a) Welding must be performed by a qualified welder in accordance with welding procedures qualified und er Section 5o API 1104 or Section IX o the ASME Boiler and Pressure Vessel Code (incorporated by reference , see § 195 .3) .The quality o the test welds used to qu a lify the welding pro ced ure shall be d e termined by destructive te sting .
(b) Each welding procedure must be recorded in detail, including the results o the qualifying tests . This record mu stbe retained and followed whenever the procedure is used .
195 222 Welders: Qualification of welders
(a) Each welder must be qualified in accordance with sect ion 6 o API 1104 (incorporated by reference , see §195 .3)or section IX o the ASME Boiler and Pressure Vessel Code , (incorporated by reference , see §195 .3 except that awelder qualified under an earlier edition than listed in §195 .3 may weld but may not re-qualify under that earlieredition.
(b) No welder may weld with a welding process unless, within the preceding 6 calendar months , the welder has -
(1) Engaged in welding with that process ; and
(2) Had one welded tested and found acceptable under section 9 o API 1104 (incorporated by referen ce, s§195 .3) .
195 _224 Welding: Weather
Welding must be protected from weather conditions that would impair the qual ity o the completed weld .
195 226 Welding: Arc burns
(a) Each arc bum ' lust be repaired .
(b) An arc bum may be repaired by completely removing the notCh by grinding , if the grinding doe s not reduce theremaining wall thickness to less than the minimum thickness required by the toleran ces in the specification to whichthe pipe is manufa ctured . If a notch is not repairable by grinding . a cylinder o the pipe containing the entire notchmust be removed
(c) A ground may not be welded · o the pipe or fitting that is being welded .
195 228 Welds and welding Inspection: Standards of acceptability
(a) Each weld and welding must be inspected to insure compliance with the requ irement s o th is subpart . Visualinspection mu s t be supplemented by nondestructive testing .
(b) The acceptability o a weld is determined according to the standards in Section 9 o API 1104 . Howev er, if a girthweld is unacceptabl e under those standards for a reason other than a crack, and if Appendix A to API 1104(incorporated by reference, see §195 .3) applies to the weld, the acceptability o the weld may be determined underthat appendix .
195 230 Welds : Repair or removal of defects
8/9/2019 Enbridge Pipeline Repair Workplan Welding
6/23
a) Each weld that is unacceptable under §195.228 must be removed or repaired. Except for welds on n offshorepipeline being installed from a pipelay vessel, a weld must be removed if it has a crack that is more than percent ofthe weld length .
b) Each weld that is repaired must have the defect r ~ m o v edown to sound metal and the segment to be repairedmust be preheated if conditions exist which would adversely affect the quality of the weld repair . After repair, thesegment of the weld that was repaired must be inspected to ensure its acceptability .
c) Repair of a crack, or of any defect in a previously repaired area must be in accordance with written weld repairprocedures that have been qualified under §195.214. Repair procedures must provide that the minimum mechanicalproperties specified for the welding procedure used to make the original weld are met upon completion of the finalweld repair.
195 234 Welds: Nondestructive testing
a) A weld may be nondestructively tested by any process that will clearly indicate any defects that may affect theintegrity of the weld.
b) Any nondestructive testing of welds must be performed
1) In accordance with a written set of procedures for nondestructive testing; and
2) With personnel that have been trained in the established procedures and in the use of the equipment employed inthe testing .
c) Procedures for the proper interpretation of each weld inspection must be established to ensure the acceptability ofthe weld un der §195 .22 8 .
d) During construction , at least 10 percent of the girth welds made by each welder during each welding day must benondestructively tested over the entire circumference of the weld.
e) All girth welds installed each day in the following locations must be nondestructively tested over their entirecircumference, except that when nondestructive testing is impracticable for a girth weld , it need not be tested if thenumber of girth welds for which testing is impracticable does not exceed 10 percent of the girth welds installed thatday: .
1) At any onshore location where a loss of hazardous liquid could reasonably be expected to pollute any stream,river, lake, reservoir, or other body of water , and any offshore area;
2) Within railroad or public road rights-of-way ;
3) At overhead road crossings and within tunnels;
4) Within the limits of any incorporated subdivision of a State government; and
5) Within populated areas, including, but not limited to, residential subdivisions , shopping centers, schools ,designated commercial areas, industrial facilities, public institutions, and places of public assembly.
I) When installing used pipe, 100 percent of the old girth welds must be nondestructively tested .
g) At pipeline tie-ins , including tie-ins of replacement sections, 100 percent of the girth welds must benondestructively tested .
8/9/2019 Enbridge Pipeline Repair Workplan Welding
7/23
, \ 3 Company Standards~
\ O MP Book 4 - Welding
4 Exceptions to standards or specific site r quir m nts - None
8/9/2019 Enbridge Pipeline Repair Workplan Welding
8/23
t N R I D G E Welding Procedure Specification DatasheetApplication: Butt weld for maintenance welding of non-in-service pipe or fitting swith and without notch toughne ss requirement to -46 C (-50'F)Codes: ASME Section IX, Compliant to CSA Z662, CFR 49 Part s 192 and 195Inspection Standards: CAN : ASME B31.3; USA: API 1104
Material Qu a lifiedAPI 5L Gr.X70; "CSA Z245 Gr.4S3, ASME IX PI(SI) Group 112/3
CEo , 0.50
Datasheet No.: UB 75 Rev. : 0WPS No.: UB-75 (rev 0)
(typical P I materia ls includ e SA 106 , SA333, SA516-70, SA537CL2) - contact Pi".li ne Int ell rity for other material substitutionsDiameter Range Welding Process Po larityAll SMA W, Manual DCRP (Electrode Pos itive)Wall Thickness Range3.2 - 25.4 mm (0.125 - I in .)Preheat Temperature~ 120 C (250 F )
Welding PositionAllInterpass Temperature~ 2 C (250'F) and ;5;232'C (450 ' F)
Filler MetalE60 I 0 and ESO IS-C3Postweld Heat TreatmentNIA
• Preheat mu st be applied to an area o at least 2 on each side o the weld joint for the entire circumference pri or to welding.• Pre heating may be applied by oxy·fuel torch, propane torch, electrical induction coils or other method approved by Enbridge.• Preheat temperature mu st be checked using temperature indicating crayons thermocouple pyrometers or other suitable method
approved by Enbridge to determine that the req uired preheat temperature i s obtained prior to, and main tai ned during thewelding operation .
Line Up Clamp RemovalInternal Clamp: 100% of roo t complete prior to removal.External Clamp: 50% of root co mplete and ,uniformly spaced prior to removal.
Welding TechniqueRoot Pa ss: StringHot I Fili i Cap: String or Weave
BeadNumber
Roo tlhot
ElectrodeSize AWS
mm (in .) Class2.4 3132)
3.2 (liS) E6010 5P+
4.0 5132)
2.4 3 /32)
Minimum No. of WeldersOne for OD 12,7mm 12,7mm (OS )JOINT PREPARATION AND WELDING DETAILS
r:----'F/* ; \ i - , 16' . ~1 ~ I - 1116', tlt6'
lI S mueinforcemenl h.eight
Enb ridge Eng ineering Approva l: Date : June 30, 2010 Page 1 of 1
8/9/2019 Enbridge Pipeline Repair Workplan Welding
9/23
~ - .~j N R I D G E UB-75 Rev . 0
.
WELDING PROCEDURE SPECIFICATION No. UB-75 (Rev. 0) Date : 20 May 2010
Company: Enbridge Pipelines Inc ., PO Box 398 , 10201 Jasper Avenue, Edmonton , AB T5J 2J9Supporting PQR(s) : UB-70-1, UB-70-2, EPI-08-WP9-1Intended Application: Above and below ground piping and repair weldingBase Metals: P1 Groups 1 , 2 3 to P1 Groups 1, 2 3Carbon Equivalent : 0.5 ma x.Welding Process: SMAW Type: ManualMinimum No . of Root Bead and Hot Pass Welders:
Weld Types: Groove and FilletTwo for NPS 12 and greater
Position: All pos itions Diameters: AllFiller Metals: E6010 5P+, E8018-C3Thickness Qualified: 3.2 mm to 25.4 mm (0.125 to 1.000 in.) inclusiveNotch Toughness: -46·C as-welded condition
JO NTS(QW-402)Type: Allgroove and fillet weld joints Backing :
oot Opening: 1 .6 to 4.0 mm 1/16 to 5132 in.) Retainers :with or withou tnot required
BASE METALS (QW-403)P-Number : P1 Groups 1 , 2 3 To P-Number : P1 Groups 1, 2 3Thickness Range : Groove: 3.2 to 25.4 mm (0.125 to 1.000 in.) inclusive
Fillet: Allbase metal thicknessesPipe Diameter Ranges: Groove: all Fillet : allMax. Deposited Weld Metal (Per Pass): 12.7 mm (0.50 in.)
FILLER METALS (QW - 404)SMAW
Specificat ion No. (SFA) 5 .1AWS No. (Class) E6010 5P+F-No . F3A-No. A1Diameter mm (in.) 2.4 3.2 4 3/32 , 8 5/32)Deposited Metal Thickness RangeGrooveFillet
POSITION (QW -405)Position of Groove :Weld Progression:
PREHEAT (QW - 406)
6.4 mm (0 .250) max .Allfillet sizes
All pos itions Position of Fillet:F3 : vertical up or down; F4 : vertical up
SMAW5.5
'E8018-C3F4A12.4 to 6.4 3/32 to 114)
19 .05 mm (0.750) max .Allfillet s izes
All positions
Preheat Temperature : 120·C Maximum Interpass Temperature : 232·CPreheat Maintenance: 120·C prior to welding . Preheat ma intenance is no t required if welding is interrupted orafter the completion of welding unless required by the code of construction .
POSTWELD HEAT TREATMENT (QW - 407)Temperature: None Time : Not applicable
8/9/2019 Enbridge Pipeline Repair Workplan Welding
10/23
~ : : : -
I N R I D G E\ ) ELECTRICAL CHARACTERISTICS (QW - 409)
Current: Direct Polarity:Amps: see summary Volts:
i i l tx mum ea npu:
Reverse , electrode positivesee summary
UB-75 Rev. 0
Base Metal Thickness Range E6010 Electrode E8018-C3 E lectrode3.2 to 12 .7 mm 69 J mm 1 6 J mm
(0.125 to 0.500 In.) 17486 J/in . 27 J/in .12 .7 to 25.4 mm 113 J mm 142 J mm
0 .500 to 1 .000 in.) 288 00 J/in. 36225 J/in .
TECHNIQUE (QW - 410)String or Weave: Root - String , Fill Cap - Either Travel Speed: see summaryInitial Interpass Cleaning : Brushing, chipping , or grinding as requiredMethod of Back Gouging: Air carbon arc, back-grind as requiredMultiple or Single Pass Per Side: Multiple Multiple or Single Electrodes : SinglePeenin g: Not required
REPAIR WELDING
Welding Technique:
Defect Removal:
Length of Repair:Preheat:Reexamination:
Date : 20 May 2010
Welding shall be performed using the details listed in this speCification , inaddit ion to the details listed beiow .Defects shall be removed by grinding and may e xtend through thecomplete wall thickness when approved by the Company representative .The minimum repa ir length shall be 50 mm .The area to be rewelded shall be preheated to 120·C .The area shall be reexamined using the same method(s) originally usedt6 identify the defect.
SUMMARY OF WELDING PARAMETERS
Signed :
8/9/2019 Enbridge Pipeline Repair Workplan Welding
11/23
~ \ }
PROCEDURE QUALIFICATION TEST REPORT
PQR No. EPI-OB -WP9-1 Date March 19. 200BWelder (a) Brad Whitworth Welder (b) Sh a nnon WhitworthBase Mater ial CSA Z245 .1 Grade - : : - - : - - : - - : - . . . : : 4 ~ B : l : : 3Heat Number 591747 Carbon Equivalent . . . ; 0 ; . ; . ~ 2 3 ~ - : - : : : : - : : 7Size 914 mm (36 .0 in.) 0 .0 . Wall Thickness 15 .9 mm (0.625 in.)Preheat & Min. Interpass 120'C (250'F) Max. Interpas s 160 ' C (320'F) .Techniqu e Root & hot pass - string . Fill & Cap - wea ve Thermal Condition As weldedWelding Progression Root & Hot: Down Rema ining : Up Welding Position - ; H : 7 o ' - ' r i : U z o < n ~ t a 7 I -:: fix-e 7 'T.(5::-:G ')Time Delay : N A Test No .: _ ..-;::::--:2 '5 R 'D=-.,-- Electrode Trade Name: E6010 (Lincoln Fle e tweld 5P+) , EB010-P1 (Lincoln Pipeliner 8P+)
E8018-C3 (Air Liquide LA B01B-C3
WELDING PARAMETERSELECTRODE CURRENT
Pass Class Size Type & Amp e rage Voltag e Arc Speed Heat InputPolarity mm I min. (Lp.m.) kJ I mm (J I inch)
1a E6010 1/B DCRP 100 23 .5 203 B.O 0.69 (17,6251b E6010 B DCRP 95 25 .5 319 12 .5 0.46 (11 62B2a EB010-P1 5/32 DCRP 160 27.5 274 10.8 0 .96 ' 24,4442b EB010-P1 5/32 DCRP 160 29.5 290 11.4 0 9B 24,842 .3a EB018-C3 3/32 DCRP 115 25 .5 90 3.5 1.96. 50 ,2713b E8018-C3 3/32 DCRP 95 24 66 2 .6 2.07 52,6154a E8018-C3 1/B DCRP 155 25 82 3.2 2 B4 72,6564b E8018 -C3 1/8 DCRP 125 25 39 1 .5 4.81 (125 ,0005a E8018-C3 1/8 DCRP 160 25 80 3 .2 3.00 75,0005b E8018-C3 1/8 DCRP 120 24 45 1 B 3.84 96000)
'6a E8018-C3 1/8 . DCRP 155 23 89 (3.5) 2.40 61 ,114)
• Brad Completed the weld using six passes, Shannon used five .
r5J mm~ - - - . l
II8
Pre pared by Ludwig Ass oc iates t Pag e 4 of 4
8/9/2019 Enbridge Pipeline Repair Workplan Welding
12/23
\ I
Materials and Welding Consulting
LABORATORY TEST REPORT
CUSTOMER : Enbrldge Pipelines Inc.10201 Jasper AvenueEdmonton , AB
Laboratory Test No.: E08-213 . 18Date : April 11, 2008
T5J 2J9
Attention: Bob Hogg
PQR No.: EPI·08 ·WP9·1 Heat No .: 591747Material: CSA Z245 .1 Gr . 483 Weld Test No . : 25rdSize: 914 mm (36 .0 In.) 0 .0. x 15.9 mm (0 .626 in .) W.t.
Thermal Condition: As WeldedTENSILE TEST
. SAMPLE NUMBER T T2WIDTH mm (in.) 25 .5 (1.00) 25.3 (0.996)THICKNESS mm (in.) 15.8 0 .624) 15 .7 (0.618)AREA sq . mm (sq . In.) 404 0 .626) 397 . 0 .616)ULTIMATE LOAD N (Ibs) 249819 (56,200) 251 183 (56,500)UTS MPa (psi) 618 (89 ,600) 632 (91,700)FRACTURE TYPE Partial Cup Cone Partial Cup ConeFRACTURE LOCATION Parent Metal Parent Metal
SAMPLE WIDTH :PLUNGER SIZE :SAMPLE TYPESAMPLE NUMB .ER(S)RESULTS
SAMPLE NUMBER(S)
REMARKS
GUIDED·BEND TEST
12.7 mm (0 .500 In.)88 .9 mm 3 .50 in.)
Side . BendS1Pass
SAMPLE THICKNESS :
Side BendS2Pass
YOKE SIZE:Side BendS3Pass
NICK BREAK TEST .
N1
Pass
N2
Pass
15 .9 mm (0 .626 In.)120 mm 4 .72 in.)
Side Bend54
'Pass
We certify the test results in this report and that the specimen s) were prepared and tested in accordance with therequirements of C.sA Z662 · 7 . Materie/lnformatlon has been provided by the Customer whose name appearson this report .
Sample Ocl. t.d with thl. report wi b . dlscard.d In 30 d.ys.
Laboratory Test Conducted By: . 1 . t . . - : - . : : : : , ' : ' : : : : . . . . - : - ' - -Natashua Collier, C. E. T.
4027 · 14 U , S.E• CALGARY,ALBERTA T2C 3K6 PHONE, 403) 262-7072 FAX, (403) 26 .31691925 Davits R ~ d .EDMONTON , ALBERTA T6£ 4N PHONE: 780) f 8 J O J OFM : 780) 468 3OJ1
P a g e of f
8/9/2019 Enbridge Pipeline Repair Workplan Welding
13/23
\.
, / LU WIG SSOCI TES LTD
CUSTOMER:
Attention
PQR No.:Material:Size:
Materials and Welding onsulting
L BOR TORY TEST REPORT
Enbrldge Pipelines Inc.10201 Jasper AvenueEdmonton, AB
Laboratory Test No.: E08 -213.16Date: April 11 2006
T5J 2J9 .
Bob Hogg
EPI-06-WP9-1 Heat No .:CSA Z245.1 Gr. 463 Weld Test No.:914 mm (36 .0 in.) 0 0 x 15.9 mm (0.626 in.) Wt.
59174725rd
Thermal Condition As Welded
NOTCH-TOUGHNESS TEST
TYPEO OF TEST: Charpy V-Notch-5°C 23°F)
ORIENTATION: TransverseTEST TEMPERATURE: SPECIMEN SIZE : 10 x 10 mm .
SpecimenNumber
NotchLocation
J2.1 · Weld Metal within 1/16 of rootJ2.2 Weld Metal within 1/16 of rootJ2 .3 Weld Metal within 1/16 of root
J3.1 HAlJ3.2 HAlJ3.3 HAl
Impact ValuesJoules ft.lbs)
152 112)130 96.2)
>163 >120)
>163 >120)>163 >120)>163 >120)
We certify the test results in this report and that the speclmen(s) were prepared and tested In accordance with therequirements o ASME Section VIII Div. I UG-B4 - 2007 edition and latest addenda. Material Information hasbeen provided by the Customer whose name appears on this re art .
Sample. I • • ocl ted with thl report be dIscarded In 30 dlYS.
Laboratory Test Conducted By: . . •Natashua Collier, C.E .T.
4027. 14S1t S.E. CAlQlRY Al8ERTA T2G 3K6 PHONE, (403) 262·7072 FAX, (403) 266-3169
7925 D.vles Ro.d , EDMONTON, ALBERTA 16E 4NI PHONE, (780) 46(1.3030 FAX, (780) 468 ·3032
Page 1 01 1
8/9/2019 Enbridge Pipeline Repair Workplan Welding
14/23
~
.
CUSTOMER:
Attention
PQR No.:Material:Size :
Materials and Welding onsulting
LABORATORY TEST REPORT
Enbrldge Pipelines Inc .10201 Jasper AvenueEdmonlon. AB
Laboratory Test No.: EOa·213 .18Date: April 11. 2008
T5J 2J9
Bob Hogg
EPI-08-WP9-1 Heat No.:CSA Z245.1 Gr. 483 Weld Tes t No.:914 mm (36.0 in.) 0 .0. x 15.9mm (0.626 In.) w.t.
59174725rd
Thermal Condition: As Welded
HARDr-lESS TEST
Type ofT est: Vickers 10kg (HV 10) Instrument: Leco V-100-C1
'm - . . . . -<, t § = 1 · . . . .\ . . I
I
\
We CfJrtify the test results in this report and that the speGlmen(s) were prepared and tested In OGGoroonoe with therequIrements o ASTM E92·82 Reapproved 2003). Meterial inform. Yon h.s been provIded y the Customer whose nameapp on this report .
emples es.socleled with this r e p a y " / l S e r d ~ dIn 30 deys
Laboratory Test Conducted By: -IlLJL// --~ ~ _ , _ _ _ : : _ = = _ - -• Natashua Collier. C.E.T.
4027 - 51 , . . , S.E., OUG. IRY, ~ L B E R T AT2G JK6 PHO NE: (40J) 261·7072 FAX, (4OJ) 266·J .69
7915 Oavles Road, EDMONTON ALBERTA T6[ 4Nr PHONE: (780) 468·3030 FItX: (780) 46 -3032
Pagel of 1
8/9/2019 Enbridge Pipeline Repair Workplan Welding
15/23
~~~
':1;;/'.
~ I ~ q - MILL I t:RTIFICATECertificate lackaaelD: 4454
Chemistry Celtific.ateFo nn Number: L 2422 ·
C ustomer: ENBRJDGE PI P EUNES tHe. Customer Ortle r Oate: Size: 3 6 .000 InN o P ~ 7 O3J >4I2D01
Speclfieatl on: API5L 43R O EO I ENBfUOGE S103-2006 REV 0 8tU06 MIROrder TIme:Wall: D.62 5 In
No: 7 000 888'1 13: 0 5:4 1 Gf'ad&: X70 PSL 2
Coli PIpe Typo C Mn S P SI I Cu I NI I C, V I Cb I Sn I Mo I AJ C. B 1 TI I N Ic . CEFcm So AIHe.t 511747
HEAT ..., ... ......
.... .... CUI o. O.tol o . ; ~1.0471 0 .110 o.on..-
...... ' .01 ..... ..... o. ;;:;;C 2 .170 PRO DUCT • 113 , ... .... ~. G.2: • lO 0.07 .... 0 . 0 7 ~a.cUl O.1U 0 ,7 .. o.oocnJ 0 ,01' . .... o." 0 .n1C53 0173 PR ODUCT .... 1" ..... 0.> ... ... .., ..0>3 • •nl • · 1 0.1tS 0.031 .. ~ . U ti O t e l .... " •.
Deoxidization Pradice: Numilum Fully KiRed WE HEREBY CERTIFY THATTHE PRODU C TrUmace: E1.ECTRIC ARC Cas ting: CONTINU OUS SLAB Rofmg M l: STE CKEL OESCR IBED ABOVE HAS P ASSE D AU THE ( l , l .
TESTS REQUIRE D BY T HE SPECIFICAT IONS . J ..-.C .>.'I O: :: Il C ;a :1 t i t Ouattr Assurance
' .
8/9/2019 Enbridge Pipeline Repair Workplan Welding
16/23
\.
rHUn-UJ npel1nes t;anada
RIll a . . . . , _ ...1 4 3 1 - 7 0 _EdrMMon,_ TIP INa
+780-955-3518 T-724 P003/003 F-543
Date mldIy; ? l®- i? II - tJ YTime; _ _ _ _ _ _
N ; ( 7 1 0 1 -- ( 7 8 0 ) _ ~ ~ g : ~ 2 5 2 r
RADIOGRAPHIC TESTING REPORTC l l e a t l C " ' I r a c f 4 r : ~. ; . . ~ J . ~ . ~. j ~ . , f L . ._ - . . - _ - - : _
Project: ~ -I; : . ~ I MLoeatlo.: 11.·:1. A' 3 f ..{;?nJ)
] I e a t Job 'rr.o.',
RTDJob': t J t } ; ; ~ /.
RTD Procedmre: ; ( 1 - lJ ) I Rev. ':CedelSpecUlcadoD : '. .
8/9/2019 Enbridge Pipeline Repair Workplan Welding
17/23
,
Address:
POfWO:
RTD QUALITY B R V 1 ~INC.1431-70 AVENUE,EDMONTON,ALBERTA, CANADA T6P INSTIL: (780) 440-6600 FAX: 7 ~ O )440 ·2538
+780-955-3518 T-724 P002/003 F-643
NDEREpORT # 2585DlIe m/dly: 2) .. _
8/9/2019 Enbridge Pipeline Repair Workplan Welding
18/23
PROCEDURE QUALIFICATIONRECORD PQR)
Procedure Qualification No:Welding Procedure Specification No:
UB-70-1UB 70
JOINTS
t ~ 3 j
8/9/2019 Enbridge Pipeline Repair Workplan Welding
19/23
a N RIDGEPROCEDURE QUALIFICATIONRECORD PQR)
PREHEATPreheat Temp: 50' F
Interpass Temp: _ _ _ _ _ _ _ _ _ _ . : : 5 : : . 5 0 : : . ·. . ; F . - - - - - : - - - : - - - - - - - - - -Other: _ _ _ _ _ _ _ _ _e_m--'-p_e_ra_t_u_re_m_o;..n_i.;..to;..r...;e..;.d_u'-s;..in-'g -'.te;;..m--- p_le:..;s;..t ,i
POST WELD HEATTREATMENTTemperature: :.;Nc..A=
Time:
eating:oollng: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
GASSFA Composit ion Flow Rate CFH)
Shlelding:lt- : N:::A;..... t t +___ +___ -lBacklng:L.. .:.N::.A=---- L.. L.. l . l . - l
ELECTRICALCHARACTERISTICS:
:
::
:t:
:
rocess
Current TypePolarity
AmpsVolts
Maximum Heat rnpuJoule s/Inch)
Tungsten ElectrodeSize Type
Mode of Meta:
:
Transfer for GMAWElectrode Wire
Feed Speed
Electrode Stick OUI:
TECHNIQUE
:5
String or Weave Bead
Multiple or Single PasPer Side
Multiple or SinglElectrodes
):e
Gas Cup Size
Oscillation
Other
:
::
:
SMAW- F3Direct DC)
Reverse EP)
82-8722-26
17,486
N
N
N
NA
rocess Filler Metal
SMAW E6010 5P+SMAW ES018-C3SMAW ES01S-C3
F3String
singleNA
NA
NA
SMAW -F4
Direct DC)Reverse EP)
72-9218-22
27,000
.'
Diameter mps Volts Travel IPM)
l /S S5 24 7
3/32 90 20 43/32 SO 21 4
F4
String Weave
Multiple Passes from One Side
sing le
2 of 3
8/9/2019 Enbridge Pipeline Repair Workplan Welding
20/23
,
PROCEDURE QUALIFICATION RECORD (PQRj
TENSILE TEST
Specimen No.
GUIDED BEND TEST
Specimen No.
TOUGHNESS TEST
SpecimenNo
1
2
34
56
7
8
9
OTHER TESTS
Hardness:
Width Thickness(In.) (In.)
Type
.
Notch location
SA 516 HAZ
SA516 HAZ
SA516 HAZ
Weld Zone
Weld Zone
Weld Zone
SA -537 HAZ
SA-537 HAZSA-537 HAZ
Area Ultimate Total Ultim ate Unit Type of Failure(In') Load {lb 1 Stress psi) & location
Figure No. Result
Notch Impact literalQu. fflalUonValue s % Shear Expansion
Type Temper h l le ft Ibs Inches)
V-notch -5 0 F 34 NA
V-notch -50 F 35
V-notch -50 F 38
V-notch -50 F 26
V-notch -50 F 25
V-notch -50 F 26
V-notch -50 F 58
V-notch -50 F 45
V-notch -5 0 F 61
errlte: _ _ _ _ _ _ _ _ _ _ _ _ _ _ -_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Chemical Analysls: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
liquid Penetrant : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
PMI:
Welder's Name: Greg McKecheran File N o . : _ _ _ _ 10 O : - : - : - . . . . . . . ~ _
Test Conducted By: _ _ _ ;..A 'lf.:.o_rM=e.:;ta:...li.:.u,-,rg ic:.:a;;..I.:.Co.:.m=p.:.an- Y,-l:.:t.:.d._ _ _ lab. Test No.: 09 363
We certify that the statements In this record are correct and that the test welds were prepared, welded, andtested In accordance with the requirements of Section IX of the ASME Code.
Manufacturer: _ _ _ _ _ _ _ :;n.:.:b::.r::id;:.e.:.P;.tip:.:;e.:.;lin:.:;e:;s:.;l:.:.td::;._ _ _ _ _ _Oate: _ _ _ _ _ _ _ _ 5 . : . - J : ; u : : . I - . : . O . : . 9_ _ _ _ _ _ _ _
Signed: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3 of 3
8/9/2019 Enbridge Pipeline Repair Workplan Welding
21/23
? ) .~ N R I D G E
PROCEDURE QUALIFICATION RECORD PQR )
Procedure Qualification No :
Welding Procedure Specification No :
UB-70-2
UB -70
JOINTS
y ? /
BASE METALSMateria l Spec: _ _ _ _ - : - : - ~ : . . . . . - - - _
Type or Grade:
SA 516 To:
60/70 To:P N o _ ~ - - _ ~ ~ ~ ~ - - ~ ~Group No.: 1&2 To:
Heat Number: To :SME Carbon Equivalent .42 To :CS Carbon Equlval ent : To :
SA 537
CL2P No 1 Group No.:
0.47
3
Coupon Thickness: _ _ ===:...:::..... = = _ _ =.::.:.. ==== .:.:..... ,0;;;5;.::0.:,0__achined to 0.500 To : Machined toCoupon Diameter: _ _ '-.:...:.;'- _ _ _ _ _ _ - _ _ _ _ _ _ - -= _ate To P at e
FILLERMETALSProcess
Number of Layers
SFA Spec. No.AWS C ass No.
F-No.A-No.
Size of Filler Meta lManufacturer
Trade NameHeat/Lot No.
Weld etal Thickness
Flux Type
Flux Trade Name
Other
POSITIONS
::
::
:::
:
:
:
:
::
:
SMAW1
5.1E6010 5P+
F3
A11/8
LincolnFleetweld 5P+
0 .125NANA
Covered E lectrode
SMAW2
5.5E8018 -C3
F4A10
3/32
Air LiquideLA8018 -C3
0.375NANA
Covered Electrode
process:1 SMAW SMAWPosition of Groove:I-_ _ _ '3:.:G:,.,.,... +____ -:-- 3:.:G:,.,.,..._ _ _ _ +___________
Welding progresslon :I- -'U 'p;.:,h:;,;iI; ,1 +____ -'U 'p;.:,h:;,;il; ,1_ _ _ _ +___________~ - - - - - - - - ~ - - - - - - - - - - - - - - - - ~ - - - - - -
10f3
8/9/2019 Enbridge Pipeline Repair Workplan Welding
22/23
f i lN B R I ~ G EPROCEDURE QUALIFICATIONRECORD PQR)PREHEAT
preheatTemp: ______________________________ ~ = ~ ~
Interpass Temp: 550' FOther: - - - - - - - - - - - - - - - T = e - m - - p - e - r a ~ t - u - r e - - m - o - n ~ i : : ' t o . ; ; . r . ; ; . e - d ~ u - s 7 i n - g ~
POST WELD HEAT TREATMENTTemperature: ______________________________ ...;..N -A'-____________________________ _
Time: -------------------------------------------------------eating: ______________________________________________________________Cooling: ______________________________________________________________
GASSFA
Shlelding:1 NABacking: . NA
ELECTRICALCHARACTERISTICS::
:
::I
rocessCurrentType
Polarity
Amps
Voltsaximum Heat Inpu
(Joules/InchTungsten Electrod
Size Typeode of eta
Transfer for GMAWElectrode Wir
Feed 5peed
:e:I:e:
Electrode Stick Out :
TECHNIQUE
SMAW- F3
Direct (DC)
Reverse EP)
80-90
23-24
28,800
N
N
N
NA
Process Filler etal
SMAW E6010 5P
SMAW E8018 -C3
SMAW E8018-C3
SMAW E8018-C3
SMAW E8018-C3
Composi tion Flow Rate (CFH)
SMAW -F4
Direct (DC)
Reverse EP)
100-11521-22
36,225
Diameter Amps Volts TravelllPM)
1/8 90 23/24 4.53/32 100 21 53/32 105 22 43/32 102 22 41/8 115 21 4
SIring or Weave e d I - I - - - - - : s . . . : t ~ . . : ~ n : . . . g - - - - - - t - - - - - - - : : - S t - r : - i n - gultiple or Single ass
(Per Side):eultiple or Singl
Electrodes
Gas Cup Size
Oscillation
Other
:
:
::
Multiple Passes fron One Side
sing le single
NA
NA
NA
2 of 3
8/9/2019 Enbridge Pipeline Repair Workplan Welding
23/23
/;;:;7t N RIDGE
PROCEDURE QUALIFICATIONRECORD (PQR)
TENSILETESTWidth Thickness Area Ultimate otal Ultimate Unit Type of Failure
Specimen No. (In.) (In.) (In') Load lb .1 tress psi) & location
1 0.749 0.488 0.366 29,000 79,300 Ductile/Weld
2 0.753 0.476 0.358 28,500 79,700 Ductile/Weld
GUIDED BEND TESTSpecimen No. Type Figure No. Result
1 Side Bend QW-462.2 Pass
2 Side Bend QW-462.2 Pass
3 S de Bend QW-462.2 Pass4 Side Bend QW -462.2 Pa ss
TOUGHNESS TESTSpecimen Notch Impact Lateral
Notch locationQllitltflcil ion
Values Shear hpansionNo . Type Trmper.turr ft·lbs Inches)1 . SA 516 HAZ V-notch -50 F 132 NA
2 SA516 HAZ V-notch -50 F 125
3 SA516 HAZ V-notch -50 F 121
4 Weld Zone V-notch -50 F 75
5 Weld Zone V-notch -50 F 59
6 Weld Zone V-notch -50 F 62
7 SA-537 HAZ V-notch -50 F 146
8 SA-53? HAZ V-notch -50 F 1629 SA-537 HAZ V-notch -50 F 149 ·
OTHER TESTSHardness: --'s;::e.:.e..:a 'tt:.:a.:.ch 'e:.:d;...r:..::e 'p..::o.:.;rt=--
Ferrite:hemical Analysls:
Liquid Penetrant: _
PMI: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Nick Break see attached report
Welder's Name: Greg McKecheran File No .: 10 N O . : : : : ~ _Test Conducted By: ..;;I;..;fo -r..;.M.:.;e:..;ta,I ,lu ,rg,,,c;; :a ; 1,Co ,m=pa ,n -y..:U,,,d..;; : _ _ lab . Test No. : 09-363
We certify that the statements In this record are correct and that the test welds were prepared, welded, andtested In accordance with the requirements of Section X of the ASME Code.
Manufacture r: . . . : : : E n ~ b : . : . r : . : l d : 2 g . : . e: . . . P , i p : : ; e : : : l i n ~ e : : : s : : ; l t : : d : : . . .
Date : -- 5:.-.:,:)u:..;I-.:O.:.9
Signed: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _