Page 1: Drew Whitney Final Presentation

Drew WhitneyEngineering Co-Op

Ohio Refining DivisionORD

Page 2: Drew Whitney Final Presentation

Contents

• Background Information

• Goals

• Projects

• Take Away

• Future

Date and Tracking Info Here2

Page 3: Drew Whitney Final Presentation

Date and Tracking Info Here3

Drew’s Background

• 2nd year student at the University of Cincinnati

• Mechanical Engineering Major

UCMC, Concrete Canoe

• Founder of Diploma Mulching LLC

• 1st Co-op with Marathon

Page 4: Drew Whitney Final Presentation

Date and Tracking Info Here4

Why Co-op

• Benefits of the Co-op Program– Extended Interview process– Communication skills– Real World Experience– Independence– $$

Page 5: Drew Whitney Final Presentation

Date and Tracking Info Here5

Goals

• Gain expertise in Mechanical Engineering design pertaining to the pertaining to the Petroleum Industry.

• Improve professional communication skills

• Gain engineering project management experience.

• Learn and embrace a good corporate safety culture.

Page 6: Drew Whitney Final Presentation

Projects:

RFE# 895 Washer and Dryer Install

Date and Tracking Info Here6

06-TK-075 Sight Glass

Standard Drawings

City Check valve project + Meridian Update

FWS Pressure gauge Piping

VPP Hazard Mitigation Plan Update

Alky Pipe Support

Stock Request forms

Ladder trip hazard/pipe reroute

FDV Air Piping

RFE#922 30-SA-003 Relocation

Electrical Package for Washer and Dryer

Asphalt Breaker Location Confirmation

LSR pump warming line

RFE#912: 35-LI-026 bleeder modification.

NPT Sight Glass

35-TK-Overfill Safeguard

Mobile Sample Station

Boiler House Demo Package

RFE#887 8-SA-001 Relocation

P&ID Updates

Area Engineer Walk down Confirmations

Heat trace pH Sampler

Piping estiamtes

Page 7: Drew Whitney Final Presentation

Date and Tracking Info Here7

Projects- RFE# 895 (Washer and Dryer Install project)

• Completed Electrical Drawing Package– Learned how to route Conduit and Modify Panel Schedules

• Communication– Communicated with Several departments and contractors

Page 8: Drew Whitney Final Presentation

Date and Tracking Info Here8

Projects- Mobile Sample Station

• Versatile

• Portable

• Safe

• Operator Friendly

Page 9: Drew Whitney Final Presentation

Date and Tracking Info Here9

Projects Boiler House Motor Removal

Conducted a Feasibility studyResearched alternative solutionsFound the best solution

Page 10: Drew Whitney Final Presentation

Take Away

• Drawings-

• Read/Write P&ID’s, Pipe Design

• Engineering process-• Need, Proposal, Budgeted, Design, IFA, IFC, Construction, Final Approval.

• Scope-• Importance of a Complete and Clear.

• A++ Work• SAFE, Thorough, Efficient

Date and Tracking Info Here10

Page 11: Drew Whitney Final Presentation

Future

• Begin 2nd year at UC

• Graduating Early 2020

• Looking forward to heading to Robinson for Summer ‘17 Co-op

Date and Tracking Info Here11

Thank you for this opportunity!!

Questions?


Related Documents