CASE STUDIESROOFTOP
DENSO HARYANA PVT.LTD.Gurugram, Haryana
CASE STUDY
DENSO HARYANA PVT.LTD.Plot No 3 Sector 3, IMT Manesar, Gurugram, Haryana
RSite Co-ordinates 28.364021 N, 76.929845 E RProject 75 kW Rooftop Solar PV PlantRModule Type Polycrystalline - 310 WpRNumber of Modules 242 nos.RInverter Solar Grid Connected Inverter (2 nos.)RAnnual Energy Yield 0.106 million unit (approx)
PROJECT OVERVIEW
ABOUT THE COMPANY
Denso Corporation is a global automotive components manufacturer and a Fortune 500 company. About 25% of the company is owned by Toyota Motor and Denso ranks as the second largest auto parts supplier in the world. As of 2016, Denso Corporation consisted of about 189 subsidiaries (63 in Japan, 34 in the Americas, 34 in Europe and 58 in Asia/Oceania) with a total of 151,775 employees.
CASE STUDIESROOFTOPCHALLENGES & SOLUTION
• For the Module Mounting Structure (MMS) for Denso, they wanted a very strict regime to be maintained concerning safety issues, quality control and housekeeping
• In order to fix the MMS Denso wanted only ‘HILTI-make drill bits’ with the involvement of HILTI personnel for the drilling. The Vikram Solar rooftop engineering team was deployed to work in tandem with the HILTI personnels and the project was completed successfully
Denso Haryana Pvt.Ltd., Gurugram, Haryana
03 04 05
Module mounting
01 02
Marking by template HILTI anchoring bolt
Radiation sensor Ambient sensor
STEP BY STEP DEVELOPMENT
CASE STUDIESROOFTOP
ACDB
06 07
Earthing pit ACDB to LT panel laying & termination
0908
Inverter
ENVIRONMENTAL BENEFITS
FINANCIAL BENEFITS
The solar PV system is expected to reduce CO2 emissions to the tune of 93.1 metric tonnes annually
The cost savings per unit from the system is about K2 Average life cycle of a solar PV system is 25 years and the payback period for this system is 5 years and 6 months
Denso Haryana Pvt.Ltd., Gurugram, Haryana